Attachment_4_-_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
Replace South Hydrant Loop Slabs Federal contract opportunity
Solicitation number
FA5575-15-B-0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 12-1004PROJECT TITLE
RPL South Hydrant Loop SlabsSOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction Schedule3NTP+5
2Work Plan3NTP+5
3Government furnished material request3Work-15
4Inventory of the excess supplies, materials and equipment imported free duty3Acceptance+15
5Request of training about vehicle operations on the aerodrome3NTP+15
SECTION 01 11 01
6Warranty letter3Acceptance+15
7Work Clearance Request3NTP+5
8Base utility connection request3NTP+15
9Base utility outage request3NTP+15
10Welding work request3Work-10
11Transit control plan3Work-7
12Acces route plan3NTP+15
13Progress Schedule3NTP+10
14Mobility Plan3NTP+15
15Project sign3NTP+15
16Quality Control Plan3NTP+15
17Pre-final inspection request3
18Final inspection request3
19Environmental protection plan3NTP+15
20Waste & construction debris management certificate3Acceptance+15
21As-Built drawings3Acceptance+15
22Spatial Data3Acceptance+15
23Key Personnel3NTP+15
24Personel listing3NTP+15
25Health and safety program3NTP+15
SECTION 02510
26Laboratory3NTO+30
27Crushed aggregates33NTP+45
28Pavers3NTP+30
29Compaction equipment3NTP+30
30Job mix formula for crushed aggregates3NTP+45
31Compaction plan3NTP+30
SECTION 02530
32Laboratory3NTP+30
33Bituminous emulsion33NTP+45
SECTION 02550
34Laboratory3NTP+30
35Job mix formula for concrete3NTP+45
36Dowels3NTP+45
37Sheet material for concrete curing3NTP+30
38Film-producing curing compound3NTP+30
39Joint filler material for expansion joints3NTP+30
40Joint sealant material3NTP+30
41Product of dowel bond breaker3NTP+30
42Concrete plant3NTP+30
43Cement storage3NTP+30
44Aggregate storage3NTP+30
45Pavers3NTP+30
46Film-producing product distributor3NTP+30
47Concrete3NTP+45
SECTION 02683
48Laboratory3NTP+30
49Equipment3NTP+30
50Insurance3NTP+30
51Waste identification and disposal plan3NTP+30
52Quality control3NTP+45
SECTION 02684
53Paint33NTP+45
54Glass spheres333NTP+45

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 12-1004TÍTULO DE PROYECTO:
REEMPLAZAR LOSAS DE ANILLO SUR DE HIDRANTESSOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Programa de obra3NTP+5
2Plan de obra3NTP+5
3Solicitud de material suministrado por el Gobierno3Trabajo-15
4Inventario del excedente de suministros, materiales y equipos importados libre de impuestos3Aceptación+15
5Solicitud de entrenamiento de operaciones de vehículos en el aeródromo3NTP+15
SECCIÓN 01 11 01
6Carta de garantía3Aceptación+15
7Permiso de excavación3NTP+5
8Petición de conexión a servicios de la base3NTP+15
9Solicitud de cortes de servicios de la base3NTP+15
10Solicitud de trabajo de soldadura3Trabajo-10
11Plan de control de tránsito3Trabajo-7
12Plan de rutas de acceso3NTP+15
13Programa de avance de obras3NTP+10
14Plan de movilización3NTP+15
15Cartel de proyecto3NTP+15
16Plan de control de calidad3NTP+15
17Solicitud de inspección pre-final3
18Solicitud de inspección final3
19Plan de protección medioambiental3NTP+15
20Certificado de gestión de residuos y escombros3Aceptación+15
21Planos As-Builts3Aceptación+15
22Datos espaciales3Aceptación+15
23Personal clave3NTP+15
24Listado de personal3NTP+15
25Plan de salud y seguridad3NTP+15
SECCIÓN 02510
26Laboratorio3NTP+30
27Zahorra33NTP+45
28Extendedoras3NTP+30
29Equipos de compactación3NTP+30
30Fómula de Trabajo de la Zahorra3NTP+45
31Plan de compactación3NTP+30
SECCIÓN 02530
32Laboratorio3NTP+30
33Emulsión bituminosa33NTP+45
SECCIÓN 02550
34Laboratorio3NTP+30
35Fómula de Trabajo del hormigón3NTP+45
36Pasadores3NTP+45
37Membranas para curado del pavimento3NTP+30
38Producto filmógeno de curado3NTP+30
39Material de relleno de junta de dilatación3NTP+30
40Material para sellado de junta3NTP+30
41Producto antiadherente para pasadores3NTP+30
42Planta de hormigon3NTP+30
43Almacenamiento de cemento3NTP+30
44Almacenamiento de áridos3NTP+30
45Extendedoras3NTP+30
46Distribuidor de producto filmógeno3NTP+30
47Hormigón3NTP+45
SECCIÓN 02683
48Laboratorio3NTP+30
49Equipos3NTP+30
50Seguro3NTP+30
51Plan de identificación y retirada de residuos3NTP+30
52Control de calidad3NTP+45
SECCIÓN 02684
53Pintura33NTP+45
54Reflectorizador333NTP+45

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it. Updated .