PWS Appendix B 24 Jul 23 2.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Potable Water Backflow Prevention Devices to Conduct Inspection, Testing, Maintenance and Repair at Various Buildings and Locations, Okinawa, Japan
Solicitation number
FA527023Q0039
Issued by
Not on record

About this file

This document contains two appendices outlining the inspection, testing, maintenance, repair and overhaul services for backflow prevention devices at various buildings and locations on Okinawa, Japan. Appendix B-1 lists 57 devices across six areas requiring inspection and testing twice yearly and identifies the size, type and manufacturer of each device. Appendix B-2 schedules the overhaul of these devices across five option years. The related federal contract opportunity is solicitation number FA527023Q0039 for potable water backflow prevention services on Okinawa to be conducted in accordance with the work outlined in the appendices. Services include inspection, testing, maintenance and repair of reduced pressure and double check backflow preventers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix B-1

APPENDIX B-1
Inspection, Testing, Maintenance & Repair Workload & Frequency
Torii Station Area
No.BLDG NO.LOCATION NAMESIZETYPEFrequency
ITMR/ YEARLYMAKE & MODEL
11401/1 SFG COF3"RP*TWICE (2)Wilkins 375A
21411/1 SFG MOF2-1/2"RPTWICE (2)Wilkins 375A
31411/1 SFG MOF Wash-Down Diversion Sys2"RPTWICE (2)Wilkins 975XL2
41431/1 SFG CCSF1-1/2"RPTWICE (2)Wilkins 975XL2
51441/1 SFG CCSF8"DC*ONCE (1)Wilkins 350A
61441/1 SFG CCSF1-1/2"RPTWICE (2)Wilkins 975XL2
71461/1 SFG CRTF3"RPTWICE (2)Wilkins 375A
81461/1 SFG CRTF 2F Mech Room1"DC*ONCE (1)VENN CO.,LTD. No.007NQT
9-1/1 SFG Guard House2"RPTWICE (2)Wilkins 975XL2
10200Havana's2-1/2"RPTWICE (2)Wilkins 375A
11200Havana's Mech Room Ceiling1-1/4"RPTWICE (2)Wilkins 375RP
12201UOQ3/4"RPTWICE (2)Wilkins 350XL
13201UOQ3/4"RPTWICE (2)Wilkins 350XL
14206Chapel1RPTWICE (2)Wilkins 375XL
1521010th RSG HQ1-1/2"DCONCE (1)Wilkins 350XL
1621010th RSG HQ1-1/4"DCONCE (1)Wilkins 350XL
17214UPH Mech Room1RPTWICE (2)Zurn 375 XL RP
18214UPH Mech Room3/4"RPTWICE (2)Zurn 375 XL RP
19216Admin Bldg Rm 2311/2"RPTWICE (2)Wilkins 375XL
20217UPH Mech Room3/4"RPTWICE (2)Watts 909 QT RPZ
21218Admin Bldg Rm 229 Mech Room1/2"RPTWICE (2)Wilkins 375XL
22226Dental Clinic Mech Room2RPTWICE (2)Watts 009M2
23234Admin Bldg Rm 2171/2"RPTWICE (2)Watts 009 QT
24235Barracks Mech Room1-1/4"RPTWICE (2)Wilkins 975XL
25235Barracks6RPTWICE (2)Wilkins 350A
26236Admin Bldg Rm 2131/2"RPTWICE (2)Febco LF860
27239Generator Bldg3/4"RPTWICE (2)Watts 909 QT RPZ
28242Swimming Pool6DCONCE (1)Watts 709
29242Swimming Pool1RPTWICE (2)Wilkins 375XL
30246Education Center Mech Room1/2"RPTWICE (2)Watts 009 M2 QT
31248Library/Coffee Shop Mech Room2RPTWICE (2)Wilkins 975XL
32250Training Center1RPTWICE (2)Watts 009 M2 QT
33251AAFES Bldg Mech Room3/4"RPTWICE (2)Watts 909 QT RPZ
34266Gymnasium2RPTWICE (2)Wilkins 375XL
35266Gymnasium2RPTWICE (2)Wilkins 375XL
36275Fitness Center3/4"RPTWICE (2)Wilkins 375XL
37275Fitness Center3/4"RPTWICE (2)Wilkins 375XL
38275Fitness Center1-1/4"RPTWICE (2)Watts 009 M2 QT
39287Training Support Center Exterior2RPTWICE (2)Febco 860
40287TSC Mech Room1RPTWICE (2)Febco 860
41287TSC Lift Station3RPTWICE (2)Watts 909
42290DODDs Mech Room3/4" (20mm)RPTWICE (2)Toyo Pipe (Conbraco) MQ520
43313Shower Bldg, Back of Bldg2-1/2"RPTWICE (2)Watts 009 QT
44319Pump House, Water Slide1RPTWICE (2)Watts 009M QT
45348HHC Motor Pool3/4"RPTWICE (2)Wilkins 975 XL
Chimuwan Area
No.BLDG NO.LOCATION NAMESIZETYPEFrequency
ITMR/ YEARLYMAKE & MODEL
46111Pump House1-1/2"RPTWICE (2)Watts 009 M2 QT
47201Pump House1-1/2"RPTWICE (2)Watts 909 M1 QT RP
White Beach Area
No.BLDG NO.LOCATION NAMESIZETYPEFrequency
ITMR/ YEARLYMAKE & MODEL
48730Admin Bldg1RPTWICE (2)Watts 009 M2 QT
49WSS#AShip Water Point3RPTWICE (2)Watts 909 MOD
50WSS#BShip Water Point2-1/2"RPTWICE (2)Watts 909 MOD
Naha Port Area
No.BLDG NO.LOCATION NAMESIZETYPEFrequency
ITMR/ YEARLYMAKE & MODEL
51T-110Seamen's Club Mech room2RPTWICE (2)Wilkins 375XL2
52WSS#3Ship Water Point2RPTWICE (2)Watts 009 M2 QT
53WSS#4Ship Water Point2RPTWICE (2)Watts 009 M2 QT
54WSS#5Ship Water Point2RPTWICE (2)Watts 009 M2 QT
55WSS#7Ship Water Point2RPTWICE (2)Watts 009 M2 QT
56WSS#8Ship Water Point2RPTWICE (2)Watts 009 M2 QT
*RP = Reduced Pressure
*DC=Double Check-valve

Appendix B-2

APPENDIX B-2
Overhaul Services Workload & Execution Schedule
Torii Station Area
No.BLDG NO.LOCATION NAMESIZETYPEOverhaul Execution Schedule
11401/1 SFG COF3"RP*Base Year
21411/1 SFG MOF2-1/2"RPBase Year
31411/1 SFG MOF Wash-Down Diversion Sys2"RPBase Year
41431/1 SFG CCSF1-1/2"RPBase Year
51441/1 SFG CCSF8"DC*Base Year
61441/1 SFG CCSF1-1/2"RPBase Year
71461/1 SFG CRTF3"RPBase Year
81461/1 SFG CRTF 2F Mech Room1"DCBase Year
9-1/1 SFG Guard House2"RPBase Year
10200Havana's2-1/2"RPBase Year
11200Havana's Mech Room Ceiling1-1/4"RPBase Year
12201UOQ3/4"RPBase Year
13201UOQ3/4"RPBase Year
14206Chapel1RPOption Year 1
1521010th RSG HQ1-1/2"DCOption Year 1
1621010th RSG HQ1-1/4"DCOption Year 1
17214UPH Mech Room1RPOption Year 1
18214UPH Mech Room3/4"RPOption Year 1
19216Admin Bldg Rm 2311/2"RPOption Year 1
20217UPH Mech Room3/4"RPOption Year 1
21218Admin Bldg Rm 229 Mech Room1/2"RPOption Year 1
22226Dental Clinic Mech Room2RPOption Year 1
23234Admin Bldg Rm 2171/2"RPOption Year 2
24235Barracks Mech Room1-1/4"RPOption Year 2
25235Barracks6RPOption Year 2
26236Admin Bldg Rm 2131/2"RPOption Year 2
27239Generator Bldg3/4"RPOption Year 2
28242Swimming Pool6DCOption Year 2
29242Swimming Pool1RPOption Year 2
30246Education Center Mech Room1/2"RPOption Year 2
31248Library/Coffee Shop Mech Room2RPOption Year 2
32250Training Center1RPOption Year 2
33251AAFES Bldg Mech Room3/4"RPOption Year 2
34266Gymnasium2RPOption Year 3
35266Gymnasium2RPOption Year 3
36275Fitness Center3/4"RPOption Year 3
37275Fitness Center3/4"RPOption Year 3
38275Fitness Center1-1/4"RPOption Year 3
39287Training Support Center Exterior2RPOption Year 3
40287TSC Mech Room1RPOption Year 3
41287TSC Lift Station3RPOption Year 3
42290DODDs Mech Room3/4" (20mm)RPOption Year 3
43313Shower Bldg, Back of Bldg2-1/2"RPOption Year 3
44319Pump House, Water Slide1RPOption Year 3
45348HHC Motor Pool3/4"RPOption Year 3
Chimuwan Area
No.BLDG NO.LOCATION NAMESIZETYPEOverhaul Execution Period
47111Pump House1-1/2"RPOption Year 4
48201Pump House1-1/2"RPOption Year 4
White Beach Area
No.BLDG NO.LOCATION NAMESIZETYPEOverhaul Execution Period
49730Admin Bldg1RPOption Year 4
50WSS#AShip Water Point3RPOption Year 4
51WSS#BShip Water Point2-1/2"RPOption Year 4
Naha Port Area
No.BLDG NO.LOCATION NAMESIZETYPEOverhaul Execution Period
52T-110Seamen's Club Mech room2RPOption Year 4
53WSS#3Ship Water Point2RPOption Year 4
54WSS#4Ship Water Point2RPOption Year 4
55WSS#5Ship Water Point2RPOption Year 4
56WSS#7Ship Water Point2RPOption Year 4
57WSS#8Ship Water Point2RPOption Year 4
*RP = Reduced Pressure
*DC=Double Check-valve

File details come from the government source that posted it. Updated .