This document contains two appendices outlining the inspection, testing, maintenance, repair and overhaul services for backflow prevention devices at various buildings and locations on Okinawa, Japan. Appendix B-1 lists 57 devices across six areas requiring inspection and testing twice yearly and identifies the size, type and manufacturer of each device. Appendix B-2 schedules the overhaul of these devices across five option years. The related federal contract opportunity is solicitation number FA527023Q0039 for potable water backflow prevention services on Okinawa to be conducted in accordance with the work outlined in the appendices. Services include inspection, testing, maintenance and repair of reduced pressure and double check backflow preventers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix B-1
| APPENDIX B-1 | |||||||
| Inspection, Testing, Maintenance & Repair Workload & Frequency | |||||||
| Torii Station Area | |||||||
| No. | BLDG NO. | LOCATION NAME | SIZE | TYPE | Frequency | ||
| ITMR/ YEARLY | MAKE & MODEL | ||||||
| 1 | 140 | 1/1 SFG COF | 3" | RP* | TWICE (2) | Wilkins 375A | |
| 2 | 141 | 1/1 SFG MOF | 2-1/2" | RP | TWICE (2) | Wilkins 375A | |
| 3 | 141 | 1/1 SFG MOF Wash-Down Diversion Sys | 2" | RP | TWICE (2) | Wilkins 975XL2 | |
| 4 | 143 | 1/1 SFG CCSF | 1-1/2" | RP | TWICE (2) | Wilkins 975XL2 | |
| 5 | 144 | 1/1 SFG CCSF | 8" | DC* | ONCE (1) | Wilkins 350A | |
| 6 | 144 | 1/1 SFG CCSF | 1-1/2" | RP | TWICE (2) | Wilkins 975XL2 | |
| 7 | 146 | 1/1 SFG CRTF | 3" | RP | TWICE (2) | Wilkins 375A | |
| 8 | 146 | 1/1 SFG CRTF 2F Mech Room | 1" | DC* | ONCE (1) | VENN CO.,LTD. No.007NQT | |
| 9 | - | 1/1 SFG Guard House | 2" | RP | TWICE (2) | Wilkins 975XL2 | |
| 10 | 200 | Havana's | 2-1/2" | RP | TWICE (2) | Wilkins 375A | |
| 11 | 200 | Havana's Mech Room Ceiling | 1-1/4" | RP | TWICE (2) | Wilkins 375RP | |
| 12 | 201 | UOQ | 3/4" | RP | TWICE (2) | Wilkins 350XL | |
| 13 | 201 | UOQ | 3/4" | RP | TWICE (2) | Wilkins 350XL | |
| 14 | 206 | Chapel | 1 | RP | TWICE (2) | Wilkins 375XL | |
| 15 | 210 | 10th RSG HQ | 1-1/2" | DC | ONCE (1) | Wilkins 350XL | |
| 16 | 210 | 10th RSG HQ | 1-1/4" | DC | ONCE (1) | Wilkins 350XL | |
| 17 | 214 | UPH Mech Room | 1 | RP | TWICE (2) | Zurn 375 XL RP | |
| 18 | 214 | UPH Mech Room | 3/4" | RP | TWICE (2) | Zurn 375 XL RP | |
| 19 | 216 | Admin Bldg Rm 231 | 1/2" | RP | TWICE (2) | Wilkins 375XL | |
| 20 | 217 | UPH Mech Room | 3/4" | RP | TWICE (2) | Watts 909 QT RPZ | |
| 21 | 218 | Admin Bldg Rm 229 Mech Room | 1/2" | RP | TWICE (2) | Wilkins 375XL | |
| 22 | 226 | Dental Clinic Mech Room | 2 | RP | TWICE (2) | Watts 009M2 | |
| 23 | 234 | Admin Bldg Rm 217 | 1/2" | RP | TWICE (2) | Watts 009 QT | |
| 24 | 235 | Barracks Mech Room | 1-1/4" | RP | TWICE (2) | Wilkins 975XL | |
| 25 | 235 | Barracks | 6 | RP | TWICE (2) | Wilkins 350A | |
| 26 | 236 | Admin Bldg Rm 213 | 1/2" | RP | TWICE (2) | Febco LF860 | |
| 27 | 239 | Generator Bldg | 3/4" | RP | TWICE (2) | Watts 909 QT RPZ | |
| 28 | 242 | Swimming Pool | 6 | DC | ONCE (1) | Watts 709 | |
| 29 | 242 | Swimming Pool | 1 | RP | TWICE (2) | Wilkins 375XL | |
| 30 | 246 | Education Center Mech Room | 1/2" | RP | TWICE (2) | Watts 009 M2 QT | |
| 31 | 248 | Library/Coffee Shop Mech Room | 2 | RP | TWICE (2) | Wilkins 975XL | |
| 32 | 250 | Training Center | 1 | RP | TWICE (2) | Watts 009 M2 QT | |
| 33 | 251 | AAFES Bldg Mech Room | 3/4" | RP | TWICE (2) | Watts 909 QT RPZ | |
| 34 | 266 | Gymnasium | 2 | RP | TWICE (2) | Wilkins 375XL | |
| 35 | 266 | Gymnasium | 2 | RP | TWICE (2) | Wilkins 375XL | |
| 36 | 275 | Fitness Center | 3/4" | RP | TWICE (2) | Wilkins 375XL | |
| 37 | 275 | Fitness Center | 3/4" | RP | TWICE (2) | Wilkins 375XL | |
| 38 | 275 | Fitness Center | 1-1/4" | RP | TWICE (2) | Watts 009 M2 QT | |
| 39 | 287 | Training Support Center Exterior | 2 | RP | TWICE (2) | Febco 860 | |
| 40 | 287 | TSC Mech Room | 1 | RP | TWICE (2) | Febco 860 | |
| 41 | 287 | TSC Lift Station | 3 | RP | TWICE (2) | Watts 909 | |
| 42 | 290 | DODDs Mech Room | 3/4" (20mm) | RP | TWICE (2) | Toyo Pipe (Conbraco) MQ520 | |
| 43 | 313 | Shower Bldg, Back of Bldg | 2-1/2" | RP | TWICE (2) | Watts 009 QT | |
| 44 | 319 | Pump House, Water Slide | 1 | RP | TWICE (2) | Watts 009M QT | |
| 45 | 348 | HHC Motor Pool | 3/4" | RP | TWICE (2) | Wilkins 975 XL |
| Chimuwan Area | |||||||
| No. | BLDG NO. | LOCATION NAME | SIZE | TYPE | Frequency | ||
| ITMR/ YEARLY | MAKE & MODEL | ||||||
| 46 | 111 | Pump House | 1-1/2" | RP | TWICE (2) | Watts 009 M2 QT | |
| 47 | 201 | Pump House | 1-1/2" | RP | TWICE (2) | Watts 909 M1 QT RP |
| White Beach Area | |||||||
| No. | BLDG NO. | LOCATION NAME | SIZE | TYPE | Frequency | ||
| ITMR/ YEARLY | MAKE & MODEL | ||||||
| 48 | 730 | Admin Bldg | 1 | RP | TWICE (2) | Watts 009 M2 QT | |
| 49 | WSS#A | Ship Water Point | 3 | RP | TWICE (2) | Watts 909 MOD | |
| 50 | WSS#B | Ship Water Point | 2-1/2" | RP | TWICE (2) | Watts 909 MOD |
| Naha Port Area | |||||||
| No. | BLDG NO. | LOCATION NAME | SIZE | TYPE | Frequency | ||
| ITMR/ YEARLY | MAKE & MODEL | ||||||
| 51 | T-110 | Seamen's Club Mech room | 2 | RP | TWICE (2) | Wilkins 375XL2 | |
| 52 | WSS#3 | Ship Water Point | 2 | RP | TWICE (2) | Watts 009 M2 QT | |
| 53 | WSS#4 | Ship Water Point | 2 | RP | TWICE (2) | Watts 009 M2 QT | |
| 54 | WSS#5 | Ship Water Point | 2 | RP | TWICE (2) | Watts 009 M2 QT | |
| 55 | WSS#7 | Ship Water Point | 2 | RP | TWICE (2) | Watts 009 M2 QT | |
| 56 | WSS#8 | Ship Water Point | 2 | RP | TWICE (2) | Watts 009 M2 QT | |
| *RP = Reduced Pressure | |||||||
| *DC=Double Check-valve |
Appendix B-2
| APPENDIX B-2 |
| Overhaul Services Workload & Execution Schedule |
| Torii Station Area | |||||
| No. | BLDG NO. | LOCATION NAME | SIZE | TYPE | Overhaul Execution Schedule |
| 1 | 140 | 1/1 SFG COF | 3" | RP* | Base Year |
| 2 | 141 | 1/1 SFG MOF | 2-1/2" | RP | Base Year |
| 3 | 141 | 1/1 SFG MOF Wash-Down Diversion Sys | 2" | RP | Base Year |
| 4 | 143 | 1/1 SFG CCSF | 1-1/2" | RP | Base Year |
| 5 | 144 | 1/1 SFG CCSF | 8" | DC* | Base Year |
| 6 | 144 | 1/1 SFG CCSF | 1-1/2" | RP | Base Year |
| 7 | 146 | 1/1 SFG CRTF | 3" | RP | Base Year |
| 8 | 146 | 1/1 SFG CRTF 2F Mech Room | 1" | DC | Base Year |
| 9 | - | 1/1 SFG Guard House | 2" | RP | Base Year |
| 10 | 200 | Havana's | 2-1/2" | RP | Base Year |
| 11 | 200 | Havana's Mech Room Ceiling | 1-1/4" | RP | Base Year |
| 12 | 201 | UOQ | 3/4" | RP | Base Year |
| 13 | 201 | UOQ | 3/4" | RP | Base Year |
| 14 | 206 | Chapel | 1 | RP | Option Year 1 |
| 15 | 210 | 10th RSG HQ | 1-1/2" | DC | Option Year 1 |
| 16 | 210 | 10th RSG HQ | 1-1/4" | DC | Option Year 1 |
| 17 | 214 | UPH Mech Room | 1 | RP | Option Year 1 |
| 18 | 214 | UPH Mech Room | 3/4" | RP | Option Year 1 |
| 19 | 216 | Admin Bldg Rm 231 | 1/2" | RP | Option Year 1 |
| 20 | 217 | UPH Mech Room | 3/4" | RP | Option Year 1 |
| 21 | 218 | Admin Bldg Rm 229 Mech Room | 1/2" | RP | Option Year 1 |
| 22 | 226 | Dental Clinic Mech Room | 2 | RP | Option Year 1 |
| 23 | 234 | Admin Bldg Rm 217 | 1/2" | RP | Option Year 2 |
| 24 | 235 | Barracks Mech Room | 1-1/4" | RP | Option Year 2 |
| 25 | 235 | Barracks | 6 | RP | Option Year 2 |
| 26 | 236 | Admin Bldg Rm 213 | 1/2" | RP | Option Year 2 |
| 27 | 239 | Generator Bldg | 3/4" | RP | Option Year 2 |
| 28 | 242 | Swimming Pool | 6 | DC | Option Year 2 |
| 29 | 242 | Swimming Pool | 1 | RP | Option Year 2 |
| 30 | 246 | Education Center Mech Room | 1/2" | RP | Option Year 2 |
| 31 | 248 | Library/Coffee Shop Mech Room | 2 | RP | Option Year 2 |
| 32 | 250 | Training Center | 1 | RP | Option Year 2 |
| 33 | 251 | AAFES Bldg Mech Room | 3/4" | RP | Option Year 2 |
| 34 | 266 | Gymnasium | 2 | RP | Option Year 3 |
| 35 | 266 | Gymnasium | 2 | RP | Option Year 3 |
| 36 | 275 | Fitness Center | 3/4" | RP | Option Year 3 |
| 37 | 275 | Fitness Center | 3/4" | RP | Option Year 3 |
| 38 | 275 | Fitness Center | 1-1/4" | RP | Option Year 3 |
| 39 | 287 | Training Support Center Exterior | 2 | RP | Option Year 3 |
| 40 | 287 | TSC Mech Room | 1 | RP | Option Year 3 |
| 41 | 287 | TSC Lift Station | 3 | RP | Option Year 3 |
| 42 | 290 | DODDs Mech Room | 3/4" (20mm) | RP | Option Year 3 |
| 43 | 313 | Shower Bldg, Back of Bldg | 2-1/2" | RP | Option Year 3 |
| 44 | 319 | Pump House, Water Slide | 1 | RP | Option Year 3 |
| 45 | 348 | HHC Motor Pool | 3/4" | RP | Option Year 3 |
| Chimuwan Area | |||||
| No. | BLDG NO. | LOCATION NAME | SIZE | TYPE | Overhaul Execution Period |
| 47 | 111 | Pump House | 1-1/2" | RP | Option Year 4 |
| 48 | 201 | Pump House | 1-1/2" | RP | Option Year 4 |
| White Beach Area | |||||
| No. | BLDG NO. | LOCATION NAME | SIZE | TYPE | Overhaul Execution Period |
| 49 | 730 | Admin Bldg | 1 | RP | Option Year 4 |
| 50 | WSS#A | Ship Water Point | 3 | RP | Option Year 4 |
| 51 | WSS#B | Ship Water Point | 2-1/2" | RP | Option Year 4 |
| Naha Port Area | |||||
| No. | BLDG NO. | LOCATION NAME | SIZE | TYPE | Overhaul Execution Period |
| 52 | T-110 | Seamen's Club Mech room | 2 | RP | Option Year 4 |
| 53 | WSS#3 | Ship Water Point | 2 | RP | Option Year 4 |
| 54 | WSS#4 | Ship Water Point | 2 | RP | Option Year 4 |
| 55 | WSS#5 | Ship Water Point | 2 | RP | Option Year 4 |
| 56 | WSS#7 | Ship Water Point | 2 | RP | Option Year 4 |
| 57 | WSS#8 | Ship Water Point | 2 | RP | Option Year 4 |
| *RP = Reduced Pressure | |||||
| *DC=Double Check-valve |