This document contains questions and answers from an industry day held to discuss a corrosion control services contract opportunity. The opportunity will provide corrosion control, prevention, and repair services for aerospace ground equipment and munitions material handling equipment for the 18th Maintenance Group. The contractor will be required to furnish all labor, supplies, equipment, and facilities to perform the work, including setting up and maintaining a 22,500 square foot on-site paint facility. The Department of the Air Force Pacific Air Forces is the contracting agency. The period of performance is expected to be five years, with the potential for additional follow-on contracts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS Rev 3 (11 Feb 21).docx | DOCX document | |
| AGE equipment.pptx | PPTX presentation | |
| Industry Day Slides.pptx | PPTX presentation | |
| Industry Day Flyer.pdf | ||
| Sources Sought Notice 29 Jan.docx | DOCX document | |
| Sources Sought Notice - EngJP version updated.docx | DOCX document | |
| Sources Sought Notice - EngJP version.docx | DOCX document | |
| PWS.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answers from Corrosion Control Industry day on 4 February.
1. Is this the same procurement that has had several market research notifications over the last several months We did post a sources sought on beta.sam.gov approximately 3 weeks ago
2. Will the government provide an onsite paint facility?
No, that is going to be provided by the Contractor for this contract
3. Could you elaborate on Structural Repairs. Does this refer to metal paneling?
Everything that is listed out within the technical orders. TO 35-10-3. This will ensure that there is no confusion on what work the contractors will need to provide.
4. Will the government approve LOAs in SPOT for contractor employees IAW USFJI 64-100?
The Government is looking into providing SOFA status and will amend the PWS to reflect that SOFA status is available for this contract.
5. Can the contractor provide a temporary on-site paint facility to fulfill this requirement?
Yes a contractor can provide on-site paint facilities.
6. We just want to be sure that frames are not included for structural repairs, as this requires special certification before it could be used on roads.
Minor surface corrosion on aero frames, but not repair and replacement.
7. How large of space would be provided to allow setup of a mobile unit?
22,500 Sq. Ft.
8. Does contractor equipment include blast equipment/facilities or will the Government provide?
No facilities will be provided by the Government. It is up to the contractor to set up and maintain all facilities.
9. Will government provide manuals on tactical equipment in case disassembly/assembly is required?
Yes, the Government will provide all manuals on tactical equipment.
10. What is the proximity of the space provided to 18th Maintenance Squadron and are there any utilities on site (power, water, oil/water separator, etc.)
No utilities will be provided. The space is right next to the fire station near Gate 3.
11. Does the government have an anticipated solicitation release date?
Currently we are still in the market research phase of this requirement. There is no anticipated release date of the solicitation at this time.
12. If the contractor has their own facility, are we able to transport all equipment off-base to perform the work, rather than setting up a mobile facility?
Yes, contractors may work on this equipment off-base.
13. Does the Government have a contingency for COVID travel restrictions?
The Government currently does not have a contingency for COVID travel, as they are constantly changing. Contractors shall work with the contracting office to understand the most-up-to-date restrictions. As of right now contractors may travel to Japan, if they are under SOFA status, but will still have to meet quarantine procedures in both mainland and on Okinawa.
14. Can you provide to T.O. 35-1-3 prior to contract award, to allow research when providing a quote.
Yes, this will be provided to all contractors on beta.sam.gov.
15. Scope of work state this is a 5-year contract. Is there intent to have additional contracts after the initial 5 years?
The Government will evaluate the status of their corrosion needs and make a decision through the life of this contract to determine if a follow-on contract is necessary.
16. Will government support disposal or is this up to the contractor?
No, all disposal is at the expense of the Contractor. The Government will not support any disposal on this contract.
17. Does contractor need provide MSDS sheet to government and get approved first for any work?
The contractor does not need to provide the government an MSDS if they are using the products outlined in the PWS. They will need them on hand for the workers and the fire department in case of fire or disaster.
Sources Sought Questions and Answers
PWS
Paragraph
Clarification Required
Impact Answer
| 2.2 |
| The contractor will be required for providing all transportation required of SE |
| Clarify. |
Will there be an 18th Wing COR-designated pick-up/drop-off location regardless of On-Site or Off-Site operations? Only mention of designated area is for Off-Site operations (ref paragraph 6.6)
| Not reasonable expectation for contractor to drive around Northside and Southside flight line, back shops, hangars, and the Munitions Storage Area to locate and transport equipment daily. |
| Pickup and drop off points will be the North Side and South Side shops |
| 4.1.1 (a) |
| Steel structured SE requiring complete removal of the protective coating will be primed with zinc-rich primer (MIL-PRF-26915), followed by intermediate primer (MIL-PRF-53030 |
or MIL-PRF-53022) Correct MIL SPEC.
TO 35-1-3, Table 3-1 (1) lists MIL-DTL-53030 or MIL-DTL-53022 as the intermediate (Tie-Coat)
| Confusion on types of materials to use. |
| Will change verbiage to match 35-1-3 in PWS |
| 4.1.1 (b) |
| If complete coating removal is not required, a scuff sanding and overcoating process will be conducted based on the severity of corrosion and paint condition. This is provided that bare metal spots are primed with MIL-PRF-53030 or MIL- PRF-53022 primer. |
| Correct Primer/MIL SPEC. |
TO 35-1-3, Table 3-1 (4) and paragraph 3.3.2.3 lists MIL-DTL-53022 as the primer or MIL-PRF- 23377 as an alternate primer. MIL-PRF-53030 is NOT listed as an approved primer for this process.
| Confusion on types of materials to use. |
| Will change verbiage to match 35-1-3 in PWS |
| 4.1.1 (c) |
| a top coat (MIL-PRF-53030 or MIL- PRF-53022) is used on the entire piece of SE, followed by the required top coat as prescribed by the applicable technical order. |
| Correct process. Process should be “intermediate/tie coat” not “top coat”. |
Correct MIL SPEC. Should be DTL vs PRF for both materials listed IAW TO 35-1-3, para 3.3.2.3.2
| Confusion on types of material and processes. |
| Will change verbiage to match 35-1-3 in PWS |
| 4.2 |
| General: The Contractor shall furnish all labor, supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS. |
Validate that this requirement will need a contractor furnished facility.
Contractor will have to furnish everything required to complete the job.