Intel_Vault_Solicitation.pdf

PDF 352 KB Posted

Attached to
Alter STS Intel Vault
Solicitation number
FA5270-13-T-0108
Issued by

About this file

SF 1442 Solicitation

View the file

Other files

File Type Posted
Amendment.pdf PDF
Ref_Dwgs.zip ZIP file
Experience_Template.pdf PDF
Attachments.pdf PDF
520001_vol3.pdf PDF
Cost-B3523_Contractor.xlsx XLSX spreadsheet
AF_Form_3064.xfd —
Mil_HDBK1013_1a.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2H2B93175A001

1. Project No. LXEZ 14-1067, SOF Alter 320th STS Intel Vault

2. The magnitude for this project is betw een $100,000 and $250,000. The general statement of the magnitude of this project is furnished for the convenience of the prospective offerors. The actual extent of w ork required w ill be governed by the contract specufucatuins and draw ings.

BURTON, BEAU J 634-1853

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

09-Aug-2013

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______5 calendar days and complete it w ithin ________300 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________27 Aug 2013 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______162 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

18 CONS/INFRASTRUCTURE ACQUISITION

POC: BURTON, BEAU

UNIT 5199, BLDG 95 KADENA AB

APO AP 96368

FA5270

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

634-7626FAX:TEL: 634-1853 TEL: FAX:

FA5270-13-T-0108 44

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA5270-13-T-0108

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot SOF Alter 320th STS Intel Vault

FFP

Project LXEZ 14-1067, SOF Alter 320th STS Intel Vault (B3523).

The Contractor shall furnish all tools, equipment, materials, testing, labor and personnel necessary to plan, design, manage and supervise the project which shall consist of, but not be limited to repair room 105 and 106 in B3523. These rooms should meet classified open storage (secure room) secret level requirements. The contractor shall develop and provide the best solution and provide recommendations not specifically stated elsewhere in this statement of work. A complete and usable product shall be furnished to the Government upon completion of this delivery order.

Exchange rate: $1.00 = Y82.4035 FOB: Destination

PURCHASE REQUEST NUMBER: F2H2B93175A001

SIGNAL CODE: A

NET AMT

NOTE

NOTICE to Offerors: Funds are not presently available for this project. No award will be made under this solicitation until funds are available. The government reserves the right to cancel this request, either before or after the US Government receives your reply, with no obligation. The Qoutation will be valid until 31 Dec 2013.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

CLAUSES INCORPORATED BY FULL TEXT

52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

CONST-E-7140B PRE-FINAL AND FINAL INSPECTION

In accordance with FAR 52.211-10 the contractor is required to complete this project, ready for use, within the number of calendar days specified in the solicitation and resulting contract. To ensure adequate time to correct any deficiencies noted by the government during the final inspection, it is highly recommended that the contractor schedules such final inspection through the contract administrator at least seven (7) calendar days prior to the scheduled project completion date. The contractor is solely responsible for scheduling this inspection and is reminded that failure to complete the project ready for use in accordance with the contract terms and conditions may result in the assessment of liquidated damages as described in FAR 52.211-12, Liquidated Damages - Construction. Occasionally, minor discrepancies may be detected during the final inspection that may be considered “punchlist” items. If only minor “punchlist” items are found, another inspection may not be required.

However, all punchlist items must be corrected by the contractor, and verified by the project inspector, prior to expiration of the contract period unless otherwise authorized in writing by the contracting officer. The determination as to what constitutes a minor discrepancy rests solely with the contracting officer and nothing in this paragraph shall be construed as a waiver of the government’s rights under any clause in this contract, including the right to assess liquidated damages as may be appropriate for failure to complete the project in accordance with the terms and conditions contained therein.

(End of Clause)

CONST-E-7141 DESIGNATION OF GOVERNMENT INSPECTOR

The Base Civil Engineer or his authorized representative is designated as the representative of the contracting officer for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract. This designation in no way authorizes anyone other than the contracting officer to commit the Government to changes in the terms of the contract.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 300 dys. ADC 1 718 CES

HITOMI GINAMA

UNIT5261

APO AP 96368

632-7065 FOB: Destination

F2H2B9

CLAUSES INCORPORATED BY REFERENCE

52.211-13 Time Extensions SEP 2000 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $289.35 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

CONST-F-7160 ISSUANCE OF NOTICE TO PROCEED

The United States Government will issue Notice to Proceed within 20 calendar days after contract award.

Section G - Contract Administration Data

CONST-G-7180 POST AWARD ADMINISTRATIVE INFORMATION

The contracting officer will provide to the contractor, a listing of the names of the Administrative Contracting Officer, Contract Administrator, and Construction Inspector (also referred to as the Contracting Officer’s Representative (COR) or Technical Representative of the Contracting Officer (TRCO), their organizational codes and telephone numbers at the time of award or at the pre-construction conference. This provision in no way authorizes any person other than the contracting officer to commit the United States Government to changes in the terms or conditions of this contract. Reference Section I, DFARS 252.201-7000 entitled Contracting Officer’s Representative (DEC 1991).

PAYING OFFICE: Accounting and Finance

DFAS-BVNF/JA

Yokota Air Force Base Fussa-shi Tokyo, Japan 197-0001

GEN-G-0001

SUBMIT INVOICES ELECTRONICALLY

Wide Area Work Flow Clause

This contract contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests. This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow (WAWF) system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://wawf.eb.mil/.

Before using WAWF, ensure your company’s Electronic Business POCs listed in your System for Award Management (SAM) are the same individuals that will invoice through WAWF. If they aren't, changes can be made to your company’s SAM profile at https://www.sam.gov/portal/public/SAM/. Click on "Update” or “Renew” using “TPIN". SAM customer support can be reached at 1-866-606-8220.

If your company’s electronic businesses POCs are correct, contact the WAWF helpdesk at 1-866-618-5988 or by e-mail at cscassig@ogden.disa.mil and ask to establish a group for your company’s CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, your company will be able to create a combination invoice/receiving report using the codes below and instructions available from our contract administrator/buyer.

Questions concerning payment should be directed to the Defense Finance Accounting Services (DFAS) Air Force Pacific at 011-81-3117-55-3068. Please have the order number and invoice number ready when calling about payment status. The accounts payable mailing address can be located in Block 18a of the order. Payment information can be easily accessed using the DFAS web site at http://www.dfas.mil. The purchase order/contract number or invoice will be required to inquire status of payment. Go to DFAS on the web at:

www/dfas.mil/money/vendor.

The contractor shall create one of the following:

[ ] “2-n-1 format” for services only [ ] “Receiving report combo” for supplies or combination of supplies & services [ ] “Invoice ” for medical supplies [X] “Construction Invoice” for construction

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES THROUGH WAWF

ISSUE BY DODAAC: FA5270

ADMIN DODAAC: FA5270

INSPECT BY DODAAC: F2H2B9

SERVICE ACCEPTOR: F2H2B9

“SHIP TO” DODAAC: F2H2B9

PAY OFFICE DODAAC: F68800

Please send additional emails to all listed:

EMAIL POINT OF CONTACT LISTING: 18 CONS.WAWF@US.AF.MIL

SERVICE ACCEPTOR/INSPECTOR: hitomi.ginama.jp@kadena.af.mil CONTRACT ADMINISTRATOR: beau.burton@us.af.mil

Section H - Special Contract Requirements

STATEMENT OF WORK

STATEMENT OF WORK

Project No.: LXEZ 14-1067 Project Title: SOF Alter 320th STS Intel Vault CE Project Manager: Hitomi Ginama Telephone: 632-7065 Location: Bldg 3523, Kadena Air Base, Okinawa, Japan

1.0 General Scope: The contractor shall furnish all tools, equipment, materials, testing, labor and personnel necessary to plan, design, manage and supervise the project which shall consist of, but not be limited to repair room 105 and 106 in B3523. These rooms should be meet classified open storage (secure room) secret level requirements. The contractor shall develop and provide the best solution and provide recommendations not specifically stated elsewhere in this statement of work. A complete and usable product shall be furnished to the Government upon completion of this delivery order.

2.0 Project Schedule and Time Constraints:

2.1 Completion of Work: The Contractor shall be required to complete the entire work, ready for use, not later than 192 calendar days after the date of Notice to Proceed (NTP) for design start. This includes 52 calendar days for design and 140 calendar days for performance time. The time for completion shall include final clean-up of the premises.

2.2 Design Schedule: The schedule of the pre-design conference will be held by the Contracting Officer. This project shall, thereafter, be completed in accordance with the following sequence. Contractor shall attend review meetings as scheduled.

Schedule Shall Be Completed Within

Submit 95% Design Drawings 25 calendar days after 65% design approval Government 95% Design Review 20 calendar days after submission Submit 100% design documents 7 calendar days after 95% design approval Design Subtotal: 52 calendar days

2.3 Construction Schedule: The Contractor can begin on-site work and demolish work with approval from the government upon satisfactory response actions at the 100% design. The contractor shall be allowed to work 0730 to 1800hours, Monday through Friday, excluding U.S. legal holidays. Calendar days includes Saturdays, Sundays, holidays and unfavorable weather days.

2.4 Performance Time: The contractor shall be completed within 140 calendar days. This includes material submittals, government material submittal review, material procurement and construction time.

a) Material Submittals: 30 calendar days

b) Government Material Review: 20 calendar days

c) Procurement of Materials: 60 calendar days

d) Construction Time: 30 calendar days

Performance Subtotal: 140 calendar days

3.0 Design and Construction Requirements:

3.1 The design for this project shall provide for the completion of the work identified on this Statement of Work within the contract price and schedule. The design shall fully accommodate usage requirements of the government facility and minimize interference with existing work. All design work shall be in accordance with applicable criteria. The government shall not be responsible for any additional costs which could have been avoided through an appropriate contractor’s design.

3.2 A detailed code analysis shall be included with the 95% design submittal. Design and work shall be conform to applicable Unified Facilities Criteria (UFC), Engineering Technical Letter (ETL), National Fire Protection Association (NFPA), Illuminating Engineering Society (IES) and all other applicable publications.

Design and work regarding the Secret/US level shall conform to requirements in DoDM 5200.01-V3, Enclosure 3 (Secret Classification Open Storage), and Physical Security Standards and Military Handbook 1013/1A.

3.3 Designer certification requirement for design engineers: When the government indicates minimum requirement of design engineers, they shall be as indicated in the Qualification Matrix below. All design professionals shall have current registration to practice in the United States or Japan; however, there may be particular Task Order(s) involving unique design that specifically requires U.S. Professional Registration.

Approval shall be indicated on all documents by having the professional signature or stamp/seal of the architect or engineer with personal signature over same appearing on all sheets as applicable to their specialties. (Use the table below).

Experience Matrix

Area Qualifications

Architectural/ Structural

Graduate Architect with professional registration or 1st Class Kenchikushi and 5 yrs experience

Mechanical Graduate Mechanical Engineer with professional registration and or 1st Class Setubi Sekkei Kenchikushi or Kankouji Sekou Kannrigishi 5 yrs experience

Electrical Graduate Electrical Engineer with professional registration or 1st Class Electrician or 1st Class Setubi Sekkei Kenchikushi and 5 yrs experience

3.4 As-built drawings depicting Site/building floor plan and details will be provided to the contractor for reference only in their present form. The government bears no responsibility for the accuracy of these drawings.

Actual field investigation and survey of the facility must be conducted by the contractor to ascertain existing conditions before start of construction. The Contractor shall visit each construction site before attempting to design.

3.5 The materials submittal must be coordinated and approved with 718CES/CEPMB. Required Submittals shall be identified on an AF Form 66, Material Submittal Log by the Government based upon the contractor’s design proposal, submittals shall be transmitted provided an AF Form 3000.

3.6 All material and constructions shall meet or exceed DoD manual 5200.1 Vol 3, FED-STD 832, UFC construction standards and other US Government and Japanese construction standards.

3.7 No asbestos and lead based paint material shall be used for this project.

3.8 No Poly-Chlorinated Biphenyl (PCB) material shall be used for this project.

3.9 Daily Report: Contractor shall provide progress photos and reports if requested by the government.

3.10 Any interruption of utility services or building access shall be coordinated with USING AGENCY through the 718CES/CEPM.

3.11 Submittals: Project documents to be submitted for each design stage are as follows.

a. 95% Design:

(1) Full size (B1) drawings 1 sets

(2) Half size (B2) drawings 15 sets

(3) Specifications with AF Form 66 8 sets

(4) Design Calculations 8 sets

(5) CDs (all contract documents) 2 sets

b. 100% Design:

(1) Full size drawings 1 sets

(2) Half size drawings 6 sets

(3) Specifications with AF Form 66 5 sets

(4) Design Calculations 3 sets

(5) CDs (all contract documents) 2 sets

c. As-built Design:

(1) Full size (B1) drawings 1 set

(2) CDs (all contract documents) 2 sets

*Submit one set (half size drawings, specifications and design calculations) to 18 CONS/LGCC and the rest to 718 CES/CEPMB directly at each design stage.

3.12 As-built Documents: The Contractor shall provide the corrected contract drawings in CD containing all drawings in electronic CADD and PDF and all documents in WORD or EXCEL and PDF.

4.0 Special Requirements:

4.1 Asbestos containing materials (ACM) and Lead base paint (LBP) survey:

a. Building must be visually surveyed for existing finish, to include materials used; painted exterior and interior surfaces of the rooms. Check ceiling, walls, insulations, pipes/ducts/equipment insulation which is suspected of containing asbestos and lead base paint. Sampling Plan must be submitted to Mr.

Kinjo/18AMDS/SGPB (Bioenvironmental Engineering) & 718CES/CEAN (Environmental) for review and approval.

b. Floor plan (small scale) of the building shall be submitted at the completion of the survey and test, the floor plan shall indicate specific locations where samples were taken; i.e., ceiling, wall, floor, pipe, duct, etc.

c. Actual ACM & LBP material sampling shall be done by a certified building inspector and testing shall be done by local industrial hygienist approved by Kadena Environmental & Bio-Environmental office.

Determination of ACM & LBP shall follow the Japanese Environmental Government Standards (JEGS). At least 15 sampling/testing for ACM and 6 each for LBP is required.

d. Destructive Sampling shall be taken from areas that are not easily visible and shall be patched with a match finish.

e. Where LBP/ACM is found after testing, drilling work shall be done with HEPA vacuum cleaner and dust generated by drilling work shall be disposed in accordance with all applicable Federal, FEGS, GOJ, JEGS, Prefectural and local regulations. The drilling work area shall be protected by the temporary vinyl sheet to collect possible debris/dust. Prepare portable HEPA vacuum to clean-up visible debris and dust.

f. The contractor shall apply the HEPA vacuum cleaner for drilling work of walls, floor and ceiling to avoid escape of the drilling waste media into the surrounding environment which may contain asbestos material or lead base paint in accordance with JEGS and Federal, Prefectural and local regulations.

4.2 Cost Estimate: The contractor is required to submit a detailed cost estimate as shown on the AF Form 3052. The contractor shall display the following items.

1. Cost proposal of Abatement of Asbestos containing materials (ACM) and Lead based paint (LBP):

Basic bid shall include sampling and testing of ACM and LBP. Cost for removal and disposal of such materials shall be shown separately. Pending the results of the testing, the contractor shall remove and dispose of these materials, or, if test results are negative, the estimated cost of removal/disposal will be deducted from the cost of the contract.

5.0 Description of Work (BASIC): The work consists of the following elements in addition to the drawings and specifications. All work shall comply with the requirements shown in DoDM 5200.01-V3, Enclosure 3, and rooms shall meet the requirements for an Open Storage Area (Secure Room), Secret Classification Level.

5.1 ARCHITECTURAL:

A. Removal work:

1. Abate all asbestos containing materials (ACM) and lead based paint (LBP).

2. Remove existing carpet, wall base, ceiling, A/C unit and steel grill of A/C unit.

3. Remove/Cut existing concrete walls and interior finish to make the doorway (opening size: W3’-

4” x H7’- 2”) between room and rooms105/106.

4. Remove the existing a single and double doors.

New work:

1. Block off existing openings for door, (106) and A/C unit including finishes matching as existing.

2. Paint rooms 105 and 106.

3. Repair /fill existing holes and damaged existing walls.

4. Provide 45mm thick fire rated single steel doors/frame with hardware in accordance with NFPA

101.

5. Install GSA approved lock (X-09) with single motion egress (push handle) to room 105 and 106.

6. Install cipher lock to rooms 105 and 106, and install exit device (panic hardware) to room 105.

7. Install steel door frame to new doorway between rooms 105 and 106, and repair the threshold of the doorway.

8. Provide new carpet and wall base including surface preparation of existing concrete floor slab.

9. Provide 2’ x 2’x 5/8” thick lay-in acoustic ceiling tile and suspension system.

10. Construct L60” x H96” x W11” wall covering the existing communication panel with 5/8” thick fire resistance gypsum board and metal stud including wall base and paint finish. Conforming to NFAP 101. Install the door and hardware (lock, hinges, door closure and etc.).

5.2 ELECTRICAL WORK:

A. Removal Work:

1. Remove existing Advantor alarm system including control panel and sensors.

2. Remove and reinstall all existing electrical fixtures on the ceiling in room 105 and 106 such as light, occupancy sensor and fire alarm detector.

B. New Work:

1. Provide 5 additional wall mounted duplex receptacle, 2P, 125V, 20A in room 105.

2. Provide 2 additional wall mounted duplex receptacle, 2P, 125V, 20A in room 106.

3. Provide a complete Intrusion Detection System (IDS) with passive infrared/microwave sensors, wall mounted motion detector(s), balanced magnetic switches and key pad for room 105 and 106 in accordance with DoDM 5200.01-Volume 3 and MIL-HDBK 1013/1A. System shall transmit alarm signal to Kadena Security Force (B705) via communication line.

4. Relocate existing receptacle(s) and communication outlet(s) which are affected by providing an opening between rooms.

5.2.1 ELECTRICAL NOTES:

1. All new conduits shall be rigid steel galvanize (thick wall).

2. All exposed conduits including existing ones where they traverse an uncontrolled area shall be PVC

(approximate 4” long) on the border with controlled area and uncontrolled area.

3. Take electrical power for additional receptacles from an adjacent circuit breaker panel by providing new circuit breaker(s).

4. New wiring shall be installed in accordance with National Electrical Code Handbook (2011), UFC 3-501-

01, UFC 3-520-01.

5. Insulation for power cable shall be EM-IE.

6. Exposed conduits shall be painted to match adjacent wall/ceiling color.

5.3 MECHANICAL WORK:

A. Removal Work:

1. Remove window type A/C unit with security bars.

2. Remove supply ceiling diffusers and return air registers.

B. New Work:

1. Reinstall supply ceiling diffusers, and return air registers and provide its cleaning.

2. Provide new security bars with access doors around rooms 105/106 in all A/C duct wall penetrations greater than 96 square inches. Remove and reinstall A/C ductworks with hangars and supports if required.

3. Provide the testing, adjusting, and balancing of supply ceiling diffusers and return air registers.

4. Install sound baffling in the HVAC ducts.

6.0 Attachments:

1. Reference Drawings

2. Attachment

3. Data/Information

CONST-H-7200 U.S. DOLLAR VERSUS YEN EQUIVALENT SEP 2007

CONST-H-7201 REQUIRED INSURANCE (In addition to that required by Japanese Law)

a. The contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance on each vehicle used by the contractor at the work site.

Type: Automobile Property Damage and Bodily Injuries Amount: JPY3,000,000 or Dollar equivalent for automobile property damage JPY30,000,000 or Dollar equivalent for bodily injuries

b. Prior to the commencement of work hereunder, the contractor shall furnish to the contracting officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the US Government in such insurance shall not be effective for such period as may be prescribed by the laws of the country of Japan in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the contracting officer.

c. The contractor agrees to insert the substance of this clause, including this paragraph (c) in all subcontracts hereunder.

CONST-H-7202 CONCILIATION

Except as otherwise provided in this contract, any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the United States - Japan Joint Committee for Conciliation in accordance with Paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of this Treaty of Mutual Cooperation and Security between Japan and the United States of America. Requests by the contractor for conciliation shall be made in accordance with the following procedures:

a. In the event the contractor desires conciliation after the decision of the contracting officer has been served upon him, he will first file his appeal from such findings of facts with the appropriate authority in accordance with the clause of this contract entitled “DISPUTES”, and within the time limits described therein before filing request for conciliation with the Joint Committee and then request the appellate authority under the clause of this contract entitled “DISPUTES”, to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.

b. The request for conciliation will be submitted by the contractor through the nearest Defense Facilities Administration Bureau, to the Contract Conciliation Panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the contractor will immediately notify the contracting officer in writing that the request for conciliation has been filed.

c. In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the contractor to notify the appellate authority designated in the clause of this contract entitled “DISPUTES”, of the settlement of the dispute and to withdraw his appeal.

d. In the event the contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires; notwithstanding tendency of his request for conciliation, that action by the appropriate authority under the clause of this contract entitled “DISPUTES” be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the contractor of his action taken hereunder.

e. No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled “DISPUTES” has been rendered.

Pending the hearing of Conciliation Panel the contractor shall proceed diligently with the performance of the contract in accordance with the contracting officer’s decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file in a civil suit.

CONST-H-7207 BASE DEFENSE ACT/WORKMAN'S COMPENSATION/WORK ON AN

OVERSEAS INSTALLATION ( JUN 2004 )

This contract includes FAR 52.228-3, Workers’ Compensation Insurance (Defense Base Act) (Apr 1984), and FAR 52.228-4, Worker’s Compensation and War-Hazard Insurance Overseas (Apr 1984). FAR 52.228-3 applies only if the contractor has United States’ citizen or national employees, regardless of whether they have SOFA status or a status of residence in Japan. FAR 52.228-4 applies if the contractor has non-United States’ citizen or national employees. One or both clauses may apply to the contractor.

CONST-H-7250 EXEMPTION FROM JAPANESE CUSTOMS DUTIES AND TAXES PURSUANT

TO STATUS OF FORCES AGREEMENT

(a) Paragraph 2, Article XI of the Status of Forces Agreement between Japan and the United States, authorizes the United States entry into Japan free from Japanese customs duties and all other charges on materials, supplies, and equipment imported for the official use of the United States Armed Forces or for the exclusive use of such forces or ultimately to be incorporated into articles or facilities used by such forces.

(b) Paragraph 3, Article XII of said Status of Forces Agreement, authorizes the United States exemption from certain Japanese taxes for materials, supplies, equipment and services procured for official purpose in Japan by the United States Armed Forces or by authorized agencies of the United States Armed Forces. Currently, these taxes are: (1) Gasoline tax and local road tax on gasoline; (2) Diesel oil tax; (3) Liquefied petroleum tax, and (4) Consumption tax.

(c) If you are the successful offeror, the contracting officer or his authorized representative will issue customs or tax exemption certificate in accordance with procedures agreed upon between the Government of Japan and the United States of America. Tax exemption certificates for either a the end of each month or upon termination of the contract. These can be applied against future purchases of motor fuel. They will be issued only to you as the prime contractor, so, if you employ a subcontractor or supplier who uses motor fuel, you must purchase the motor fuel to secure the exemption.

(d) List below the customs duties or taxes which have been excluded from your proposal as required by the taxes clause. Contractor must claim all customs and tax exemptions to which the US Government is entitled.

Type of Commodity & Amount of Duty or Percentage of Tax Tax Excluded in Yen

(1) Customs Duties __________________ _________________

(2) Taxes __________________ _________________

(a) Gasoline tax and local road tax on gasoline __________________ _________________

(b) Diesel oil tax __________________ _________________

(c) Liquefied petroleum tax __________________ _________________

(d) Consumption tax __________________ _________________

(End of provision)

GEN-H-7951 TAX EXEMPTION CERTIFICATE (AUG 2001)

The Contractor will submit requests for gasoline or diesel oil tax exemption certificates to the Contracting Officer.

This request will show the actual amount of gasoline or diesel oil used exclusively for the performance of this contract, with documentary evidence and detailed item breakdown to certify the accurate consumption of gasoline or diesel oil, or other necessary information and data as may be required. The Contracting Officer will issue to the Contractor a Tax Exemption Certificate for the actual amount of gasoline or diesel oil used exclusively for the performance of this contract. The Contractor shall claim all tax and customs exemptions as listed in clause CONST-H-7250, entitled, “EXEMPTION FROM JAPANESE CUSTOMS DUTIES AND TAXES PURSUANT

TO STATUS OF FORCES AGREEMENT”.

GEN-H-7952 JAPANESE ROAD LAWS (AUG 2001)

The Contractor shall comply with Japanese Road Laws while on U.S. military installations to specifically include:

Article 43, The Road Law (Japan) (prohibitive acts relative to roads). No person shall commit the following described acts:

Damaging the road, causing roads to be littered with debris, polluting the roads with debris or fall out from motor vehicles or otherwise defacing roads unreasonably or without due cause.

Article 43-2 (Measures to be taken to prevent cargo or things loaded on motor vehicles from falling out)

The agency managing a road may, when there is reasonable cause for him to feel that items or cargo being carried in or on a motor vehicle may fall out and damage, pollute, or otherwise deface the road in such manner as to hinder or obstruct the traffic, order the operator of the vehicle in question to take steps or measures necessary to prevent occurrence of such hindrance by stopping operation of the vehicle, correcting the method of loading or traveling, or operation of the vehicle.

GEN-H-7953 REGISTRATION OF MOTOR VEHICLES (AUG 2001)

All company-owned and privately-owned motor vehicles required to be on U.S. Government facilities during the performance of this contract must be registered with Vehicle Registration, Camp Foster. Necessary decals and/or permits will be issued and displayed on the vehicles in the manner as directed by the Vehicle Registration Officer.

Vehicle decals shall be removed from vehicles and turned in to Vehicles Registration, Camp Foster, at the end of the contract period or sooner when vehicles are no longer used in the performance of the contract or as directed by the Contracting Officer.

Section I - Contract Clauses

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2013

52.204-13 Central Contractor Registration Maintenance DEC 2012 52.213-2 Invoices APR 1984 52.222-50 Combating Trafficking in Persons FEB 2009 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

JUL 2012

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-17 Affirmative Procurement of EPA-Designated Items in

Service and Construction Contracts

MAY 2008

52.223-18 Contractor Policy to Ban Text Messaging While Driving SEP 2010 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-14 Inconsistency Between English Version And Translation Of

Contract

FEB 2000

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-3 Worker's Compensation Insurance (Defense Base Act) APR 1984 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002 52.232-16 Progress Payments AUG 2010 52.232-23 Assignment Of Claims JAN 1986 52.232-33 Payment by Electronic Funds Transfer--Central Contractor

Registration

OCT 2003

52.233-1 Disputes JUL 2002 52.233-1 Alt I Disputes (Jul 2002) - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.242-14 Suspension of Work APR 1984

52.243-1 Changes--Fixed Price AUG 1987 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Items DEC 2010 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-10 Default (Fixed-Price Construction) APR 1984 52.249-14 Excusable Delays APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7000 Disclosure Of Information DEC 1991 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A SEP 2007 252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.223-7001 Hazard Warning Labels DEC 1991 252.223-7006 Prohibition On Storage And Disposal Of Toxic And

Hazardous Materials

APR 2012

252.225-7041 Correspondence in English JUN 1997 252.225-7043 Antiterrorism/Force Protection Policy for Defense

Contractors Outside the United States

MAR 2006

252.225-7045 Balance of Payments Program--Construction Material Under Trade Agreements

JUN 2011

252.229-7000 Invoices Exclusive of Taxes or Duties JUN 1997 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

MAR 2008

252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.247-7023 Alt III Transportation of Supplies by Sea (May 2002) Alternate III MAY 2002

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 5 days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use within the number of calendar days specificed in each notice to proceed. The time stated for completion shall include final cleanup of the premises.

52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL

ITEMS) (JULY 2013)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

(ii) 52.222-21, Prohibition of Segregated Facilities (Feb 1999) (E.O. 11246).

(iii) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(iv) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

(v) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2006) (E.o.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(vi) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(vii) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (Apr 1984).

(ii) 52.232-8, Discounts for Prompt Payment (Feb 2002).

(iii) 52.232-11, Extras (Apr 1984).

(iv) 52.232-25, Prompt Payment (July 2013).

(v) 52.233-1, Disputes (JUN 2008).

(vi) 52.244-6, Subcontracts for Commercial Items (July 2013).

(vii) 52.253-1, Computer Generated Forms (Jan 1991).

(viii) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (July 2013) (Pub. L. 109-

282) (31 U.S.C. 6101 note) (Applies to contracts valued at $25,000 or more).

(ii) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (MAR 2012) (E.O. 13126). (Applies to contracts for supplies exceeding the micro-purchase threshold.)

(iii) 52.222-20, Walsh-Healey Public Contracts Act (OCT 2010) (41 U.S.C. 35-45) (Applies to supply contracts over $15,000 in the United States, Puerto Rico, or the U.S. Virgin Islands).

(iv) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212) (applies to contracts of $100,000 or more).

(v) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 2010) (29 U.S.C. 793). (Applies to contracts over $15,000, unless the work is to be performed outside the United States by employees recruited outside the United States.) (For purposes of this clause, United States includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vi) 52.222-37, Employment Reports on Veterans (SEP 2010) (38 U.S.C. 4212) (applies to contracts of $100,000 or more).

(vii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.) (Applies to service contracts over $2,500 that are subject to the Service Contract Act and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer continental shelf lands.).

(viii) 52.223-5, Pollution Prevention and Right-to-Know Information (May 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(ix) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR Program or Federal Energy Management Program (FEMP) will be--

(A) Delivered;

(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;

(C) Furnished by the Contractor for use by the Government; or

(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance.)

(x) 52.225-1, Buy American Act--Supplies (FEB 2009) (41 U.S.C. 10a-10d) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold and the acquisition--

(A) Is set aside for small business concerns; or

(B) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $25,000.)

(xi) 52.232-33, Payment by Electronic Funds Transfer--System for Award Management (Jul 2013). (Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) database as its source of EFT information.)

(xii) 52.232-34, Payment by Electronic Funds Transfer--Other than System for Award Management (Jul 2013).

(Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information.)

(xiii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241). (Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d).)

(2) Listed below are additional clauses that may apply:

(i) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .