SUMMARY
| | | OMB No. 0704-0193 |
| CONSTRUCTION COST ESTIMATE BREAKDOWN | (Contractor) | Expires 31 October 1989 |
| CONTRACTOR | | ADDRESS | |
| CONTRACT FOR | | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | |
| SOF Alter 320th STS Intel Vault | | | | | | | | | | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | | WORK LOCATION | | | |
| | | LXEZ 14-1067 | | | | Kadena AB, Okinawa Japan | | | |
| | | | MATERIAL COST | | | LABOR COSTS | | | |
| | UNIT | | | | | | | OTHER | |
| LINE | ITEM | OF | QUANTITY | | | MANHOURS | AVERAGE | | DIRECT | LINE |
| NO. | | MEASURE | | UNIT | TOTAL | MANDAYS | RATE | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| SUMMARY | | | | | | | | | |
| 1 | ARCHITECTURAL | LS | 1 | | | | | | | |
| 2 | ELECTRICAL | LS | 1 | | | | | | | |
| 3 | MECHANICAL | LS | 1 | | | | | | | |
| 4 | Design Fee W/ ACM and LBP Testing | LS | 1 | | | | | | | |
| 5 | ACM/LBP Removal | LS | 1 | | | | | | | |
| Total Direct Cost | ¥ |
| Overhead ( %) | ¥ |
| Subtotal | ¥ |
| Profit ( %) | ¥ |
| Total Price | ¥ |
Exchange Rate $1.00=¥ 82.4035 $ 0.00
| PREVIOUS EDITION IS OBSOLETE. | | Page 1 of 5 |
| AF FORM 3052, JAN 88 | | | |
| | | Page of |
| | | Page of |
| | | Page of |
| | ` | |
ARCH
| | | OMB No. 0704-0193 |
| CONSTRUCTION COST ESTIMATE BREAKDOWN | (Contractor) | Expires 31 October 1989 |
| CONTRACTOR | | ADDRESS | |
| CONTRACT FOR | | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | | |
| SOF Alter 320th STS Intel Vault | | | | | | | | | | | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | | WORK LOCATION | | | | |
| | | LXEZ 14-1067 | | | | Kadena AB, Okinawa Japan | | | | |
| | | | MATERIAL COST | | | LABOR COSTS | | | | |
| | UNIT | | | | | | | OTHER | | |
| LINE | ITEM | OF | QUANTITY | | | MANHOURS | AVERAGE | | DIRECT | LINE | |
| NO. | | MEASURE | | UNIT | TOTAL | MANDAYS | RATE | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ARCHITECTURAL | | | | | | | | | | |
| A | Removal work | | | | | | | | | | |
| 1 | Remove ACM | LS | | | | | | | | | |
| 2 | Remove LBP | LS | | | | | | | | | |
| 3 | Remove doors, carpet, wall base, ceiling and steel grill | LS | | | | | | | | | |
| 4 | Remove/Cut exiting conc. Wall | SF | | | | | | | | | |
| Subtotal for Removal work | | | | | | | | | | 0 |
| B | New Work | |
| 1 | Block off exist opening w/ finishes | SF |
| 2 | Paint | SF |
| 3 | Repair/fill exist walls | LS |
| 4 | 45 mm thic Steel Single door/Frame with hardware | EA |
| 5 | Steel door frame (W3'-4" x H7'-2") | EA |
| 6 | Lock (X-09), Cipher lock, exit device and etc. | LS |
| 7 | 2' x 2' x 3/4" thick Lay-in ceiling tile w/ suspension system | SF |
| 8 | Carpet w/ surface preparation | SF |
| 9 | Wall base | |
hitomi.ginama.jp: hitomi.ginama.jp:
| LF | | | |
| AF FORM 3052, JAN 88 | | PREVIOUS EDITION IS OBSOLETE. | Page 2 of 5 |
| 10 | Wall covering exist communication panel | | |
| a. | 5/8" thick gypsum board and metal stud w/ paint fin. | SF | |
| b. | Door with hardware (lock, hinges, door closure & etc.) | SET | |
Subtotal for New work 0
| AF FORM 3052, JAN 88 | PREVIOUS EDITION IS OBSOLETE. | Page 3 of 5 |
| | Page of |
| | Page of |
ELEC
| | | OMB No. 0704-0193 |
| CONSTRUCTION COST ESTIMATE BREAKDOWN | (Contractor) | Expires 31 October 1989 |
| CONTRACTOR | | ADDRESS | |
| CONTRACT FOR | | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | |
| SOF Alter 320th STS Intel Vault | | | | | | | | | | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | | WORK LOCATION | | | |
| | | LXEZ 14-1067 | | | | Kadena AB, Okinawa Japan | | | |
| | | | MATERIAL COST | | | LABOR COSTS | | | |
| | UNIT | | | | | | | OTHER | |
| LINE | ITEM | OF | QUANTITY | | | MANHOURS | AVERAGE | | DIRECT | LINE |
| NO. | | MEASURE | | UNIT | TOTAL | MANDAYS | RATE | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| ELECTRICAL | | | | | | | | | |
| 1 | Removal and Reinstallation Work | LS | | | | | | | | |
| 2 | Receptacle, 2P, 125V, 20A Duplex | EA | | | | | | | | |
| 3 | IDS | SET | | | | | | | | |
| 4 | Circuit Breaker, 1P 100AF/20AT | EA | | | | | | | | |
| 5 | Conduit | LM | | | | | | | | |
| 6 | Wire | LM | | | | | | | | |
| 7 | Misc Materials and Labor | LS | | | | | | | | |
| Total Electrical | | | | | | | | | |
| AF FORM 3052, JAN 88 | PREVIOUS EDITION IS OBSOLETE. | Page 4 of 5 |
| | Page of |
MECH
| | | OMB No. 0704-0193 |
| CONSTRUCTION COST ESTIMATE BREAKDOWN | (Contractor) | Expires 31 October 1989 |
| CONTRACTOR | | ADDRESS | |
| CONTRACT FOR | | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | |
| SOF Alter 320th STS Intel Vault | | | | | | | | | | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | | WORK LOCATION | | | |
| | | LXEZ 14-1067 | | | | Kadena AB, Okinawa Japan | | | |
| | | | MATERIAL COST | | | LABOR COSTS | | | |
| | UNIT | | | | | | | OTHER | |
| LINE | ITEM | OF | QUANTITY | | | MANHOURS | AVERAGE | | DIRECT | LINE |
| NO. | | MEASURE | | UNIT | TOTAL | MANDAYS | RATE | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| MECHANICAL WORK | | | | | | | | | |
| 1 | Remove Window Type A/C Unit w/Security Bars | LS | | | | | | | | |
| 2 | Security Bars with Access Doors | EA | | | | | | | | |
| 3 | Remove and reinstall supply ceiling diffusers and | | | | | | | | | |
| return air registers and provide its cleaning | EA | | | | | | | | |
| 4 | Testing, Adjusting, and Balancing of Supply Ceiling | | | | | | | | | |
| Diffusers and Return Air Registers | EA | | | | | | | | |
SUBTOTAL FOR MECHANICAL WORK
AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. Page 5 of 5