Amendment to the Solicitation extending the proposal due date to 3 Sept 2013

View the file

Other files

File Type Posted
Ref_Dwgs.zip ZIP file
Experience_Template.pdf PDF
Attachments.pdf PDF
Intel_Vault_Solicitation.pdf PDF
520001_vol3.pdf PDF
Cost-B3523_Contractor.xlsx XLSX spreadsheet
AF_Form_3064.xfd —
Mil_HDBK1013_1a.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2H2B93175A001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Change the proposal due date from 27 August 2013 to 1500 local time on 3 Sep 2013

All Other Terms and Conditions Remain Unchanged

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Sep-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5270-13-T-0108

X 9B. DATED (SEE ITEM 11)

09-Aug-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Aug-2013

CODE

18 CONS/INFRASTRUCTURE ACQUISITION

POC: BURTON, BEAU

UNIT 5199, BLDG 95 KADENA AB

APO AP 96368

FA5270 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA5270-13-T-0108

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 27-Aug-2013 03:00 PM to 03-Sep-2013 03:00 PM.

SECTION E - INSPECTION AND ACCEPTANCE

The following were previously included by full text and are now included by reference:

52.246-12 Inspection of Construction AUG 1996

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

CONST-L-7300 PROPOSAL PREPARATION INSTRUCTIONS (JUN 2006)

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. The response shall consist of two (2) separately bound parts, Part I – Technical Requirements, and Part II – Pricing Submission.

B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer’s opinion, adequate price competition exists, no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.

C. Specific Instructions:

1. PART I — TECHNICAL REQUIREMENTS - Submit original plus one (1) copy.

a. Offeror’s understanding of the requirements of the Statement of Work and their ability to accomplish the work effectively as demonstrated by providing a proposed progress schedule using AF Form 3064 or similar. The schedule shall be detailed enough to demonstrate a clear understanding of the SOW, and all major work elements shall be defined.

b. Offeror’s understanding of the requirements of the Statement of Work as demonstrated by the Offeror’s proposal cost estimate breakdown submitted on AF Form 3052.

c. Complete and submit attachment 1, Submission of Recent/Relevant Experience. Describe in detail no more than 3 recent/relevant projects that the offeror’s proposed project team has completed (or that are nearing completion) for the past three years and are similar or greater in type, scope, size and complexity to this acquisition. Provide sufficient factual information to demonstrate the capability of the project team proposed for this project to successfully complete the current acquisition. Specifically address the role, degree of involvement and responsibility, and range of duties performed by the proposed key personnel for this acquisition in the projects selected to demonstrate the proposed team’s experience.

2. PART II – PRICING SUBMISSION – Submit original plus one (1) copy.

a. Complete blocks 14, 15, 16, 19 (as appropriate), 20A, 20B, and 20C of this solicitation, Section A, Standard Form 1442. In doing so, the offeror accedes to the contract terms and conditions as written in this solicitation, Sections A through K. These sections constitute the model contract.

b. Insert proposed Firm Fixed Price(s) on all individual items of the Pricing Schedule in Section B.

Indirect costs such as overhead, profit, etc, must be included on the pricing schedule.

c. Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For any other sections, the offeror shall only submit the pages, if any, that require a fill-in.

Note: Check your pricing submission very carefully for mathematical and clerical errors prior to submission.

D. Documents submitted in response to this solicitation must be fully responsive to and consistent with the following:

1. Requirements of the solicitation Contract Line Item Numbers (CLINs), specifications and drawings, and government standards and regulations pertaining to the specifications and drawings;

2. Evaluation Factors for Award in Section M of this solicitation;

3. Any limitation on the number of proposal pages as specified herein. Pages exceeding the page limitations set forth in this Section L will not be read or evaluated; and

4. The following format for proposal Part I and Part II:

a. A page is defined as one face of an 8 ½” x 11” sheet of paper containing information.

b. Typing shall not be less than 12 pitch.

E. Proposal Submission:

1. Submit your proposal to arrive NOT LATER THAN 3 September 2013 3:00 P.M., LOCAL TIME.

2. All proposals delivered in response to this solicitation shall reflect the following information on the address label:

a. Solicitation Number FA5270-13-T-0108.

b. The legend, "To be delivered unopened to the Contracting Officer", and

c. The volume and copy numbers contained in each box/envelope.

3. Submit your proposal to the following address:

Beau Burton 18 Contracting Squadron / LGCC Unit 5199, Bldg 95 APO, AP 96368 (Okinawa, Japan)

(End of Provision)

(End of Summary of Changes)