FA5270-12-R-0011 EXHIBIT A

B-1

B-2 Place of Performance for Air Force:

a.

b.

c.

d.

B-3 Place of Performance for Army:

a.

b.

c.

B-4 Pricing Schedule:

B-5 Period of Performance: One Year from Date of Award

ELIN Description Estimated Quantity Unit Unit Price

Estimated Amount

REMOVAL WORK

A001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

A002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

A003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)

85% of all delivery orders are estimated to be performed in these areas: Air Force Installation: All of Kadena Air Base and 18MUNS Area. In addition this contract covers the following MFH Areas outside of Kadena Air Base: Chibana, Camp Shields, Camp Lester, Camp Foster (Futenma, Chatan, Sada, and Kishaba Terrace) and Plaza.

REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,

VARIOUS LOCATIONS, OKINAWA, JAPAN

Project Description: Project LXEZ 12-2667, Sampling, Testing, and Removal of Asbestos and Lead Base Paint, Various Bldgs., Various Locations, Okinawa, Japan.

PRICING SCHEDULE

(BASE YEAR)

5% of all delivery orders issued are estimated to be performed in the following MFH areas:

Camp McTureous and Camp Courtney.

5% of all delivery orders issued are estimated to be performed in the following MFH area:

Camp Kinser.

5% of all delivery orders issued are estimated to be performed in the following area:

Okuma Recreation Center.

5% of all delivery orders issued are estimated to be performed in the areas: Chimwan Area, Tengan and White Beach

For Okuma Recreation Center, Yaedake and Hill 450, the unit prices for work accomplished at these locations, the Government will pay 103 % of the price, that is add 3 % to the price, for work ordered and accomplished at those locations. No other adjustments to unit pricing shall be made on account of the comparative remoteness of these locations.

90% of all delivery orders issued are estimated to be performed in the areas: Naha Port, Fort Buckner and Torii Station.

5% of all delivery orders issued are estimated to be performed in the areas: Yaedake and Hill 450.

LXEZ 12-2667 (18 Apr 2012) Page 1 of 26

ELIN Description Estimated Quantity Unit Unit Price

Estimated Amount

A004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)

A005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)

A006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)

A007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)

A008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)

A009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)

A010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)

A011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)

A012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)

A013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)

A014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)

A015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)

A016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)

A017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)

A018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)

LXEZ 12-2667 (18 Apr 2012) Page 2 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

A019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)

A020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)

A021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)

A022 Removal of Lighting Fixture 50 EA ¥ ¥

A023 Removal of Wall and Base Cabinet 100 LF ¥ ¥

A024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation

A025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation

A026 Removal of Duct 1,500 SF ¥ ¥

A027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)

A028 Removal of Steel Pipe or Stack 500 LF ¥ ¥ (2-1/2" ø or Above)

A029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥

A030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring

A031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud

A032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System

A033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

A034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

A035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)

LXEZ 12-2667 (18 Apr 2012) Page 3 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

A036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)

A037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area

A038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥

A039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥

A040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥

A041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos

A042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint

A043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint

A044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint

A045 Air Sampling & Testing with Transmission 50 EA ¥ ¥ Election Microscopy (TEM)

A046 Air Sampling & Testing with Phase 300 EA ¥ ¥ Contrast Microscopy (PCM)

A047 Wipe Sampling 30 EA ¥ ¥

A048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit

A049 Decontamination Unit 50 EA ¥ ¥

A050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

A051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

A052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

A053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

LXEZ 12-2667 (18 Apr 2012) Page 4 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

A054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥

A055 Shipping by Container (Half Full Size) 20 EA ¥ ¥

A056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)

A057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)

A058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)

A059 Removal and Dispose A/C Equipment 2 EA ¥ ¥

NEW WORK

A060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥

A061 Vinyl Cove Base 200 LF ¥ ¥

A062 Carpet 1,000 SF ¥ ¥

ESTIMATED BASIC YEAR TOTAL FOR

ELINS A001 THRU A062 ¥

LXEZ 12-2667 (18 Apr 2012) Page 5 of 26

FA5270-12-R-0011 EXHIBIT B

Period of Performance: One Year from Expiration of the Base Year.

ELIN Description Estimated Quantity Unit Unit Price

Estimated Amount

REMOVAL WORK

B001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

B002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

B003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)

B004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)

B005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)

B006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)

B007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)

B008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)

B009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)

B010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)

B011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)

B012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)

(FIRST OPTION YEAR)

REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,

VARIOUS LOCATIONS, OKINAWA, JAPAN

PRICING SCHEDULE

LXEZ 12-2667 (18 Apr 2012) Page 6 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

B013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)

B014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)

B015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)

B016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)

B017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)

B018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)

B019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)

B020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)

B021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)

B022 Removal of Lighting Fixture 50 EA ¥ ¥

B023 Removal of Wall and Base Cabinet 100 LF ¥ ¥

B024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation

B025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation

B026 Removal of Duct 1,500 SF ¥ ¥

B027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)

B028 Removal of Steel Pipe or Stack 500 LF ¥ ¥ (2-1/2" ø or Above)

LXEZ 12-2667 (18 Apr 2012) Page 7 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

B029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥

B030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring

B031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud

B032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System

B033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

B034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

B035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)

B036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)

B037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area

B038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥

B039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥

B040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥

B041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos

B042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint

B043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint

B044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint

B045 Air Sampling & Testing with Transmission 50 EA ¥ ¥ Election Microscopy (TEM)

LXEZ 12-2667 (18 Apr 2012) Page 8 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

B046 Air Sampling & Testing with Phase 300 EA ¥ ¥ Contrast Microscopy (PCM)

B047 Wipe Sampling 30 EA ¥ ¥

B048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit

B049 Decontamination Unit 50 EA ¥ ¥

B050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

B051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

B052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

B053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

B054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥

B055 Shipping by Container (Half Full Size) 20 EA ¥ ¥

B056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)

B057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)

B058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)

B059 Removal and Dispose A/C Equipment 2 EA ¥ ¥

NEW WORK

B060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥

B061 Vinyl Cove Base 200 LF ¥ ¥

B062 Carpet 1,000 SF ¥ ¥

ESTIMATED FIRST OPTION YEAR TOTAL FOR

ELINS B001 THRU B062 ¥

LXEZ 12-2667 (18 Apr 2012) Page 9 of 26

FA5270-12-R-0011 EXHIBIT C

Period of Performance: One Year from Expiration of Option Year One

ELIN Description Estimated Quantity Unit Unit Price

Estimated Amount

REMOVAL WORK

C001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

C002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

C003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)

C004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)

C005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)

C006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)

C007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)

C008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)

C009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)

C010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)

C011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)

C012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)

(SECOND OPTION YEAR)

REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,

VARIOUS LOCATIONS, OKINAWA, JAPAN

LXEZ 12-2667 (18 Apr 2012) Page 11 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

C013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)

C014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)

C015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)

C016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)

C017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)

C018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)

C019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)

C020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)

C021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)

C022 Removal of Lighting Fixture 50 EA ¥ ¥

C023 Removal of Wall and Base Cabinet 100 LF ¥ ¥

C024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation

C025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation

C026 Removal of Duct 1,500 SF ¥ ¥

C027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)

C028 Removal of Steel Pipe or Stack 500 LF ¥ ¥

LXEZ 12-2667 (18 Apr 2012) Page 12 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

C029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥

C030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring

C031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud

C032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System

C033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

C034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

C035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)

C036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)

C037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area

C038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥

C039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥

C040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥

C041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos

C042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint

C043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint

C044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint

C045 Air Sampling & Testing with Transmission 50 EA ¥ ¥

LXEZ 12-2667 (18 Apr 2012) Page 13 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

C046 Air Sampling & Testing with Phase 300 EA ¥ ¥ Contrast Microscopy (PCM)

C047 Wipe Sampling 30 EA ¥ ¥

C048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit

C049 Decontamination Unit 50 EA ¥ ¥

C050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

C051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

C052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

C053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

C054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥

C055 Shipping by Container (Half Full Size) 20 EA ¥ ¥

C056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)

C057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)

C058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)

C059 Removal and Dispose A/C Equipment 2 EA ¥ ¥

NEW WORK

C060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥

C061 Vinyl Cove Base 200 LF ¥ ¥

C062 Carpet 1,000 SF ¥ ¥

ESTIMATED SECOND OPTION YEAR TOTAL FOR

ELINS C001 THRU C062 ¥

LXEZ 12-2667 (18 Apr 2012) Page 14 of 26

FA5270-12-R-0011 EXHIBIT D

Period of Performance: One Year from Expiration of Option Year Two

ELIN Description Estimated Quantity Unit Unit Price

Estimated Amount

REMOVAL WORK

D001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

D002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

D003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)

D004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)

D005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)

D006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)

D007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)

D008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)

D009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)

D010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)

D011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)

D012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)

(THIRD OPTION YEAR)

REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,

VARIOUS LOCATIONS, OKINAWA, JAPAN

LXEZ 12-2667 FOR OFFICIAL USE ONLY (18 Apr 2012) Page 16 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

D013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)

D014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)

D015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)

D016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)

D017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)

D018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)

D019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)

D020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)

D021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)

D022 Removal of Lighting Fixture 50 EA ¥ ¥

D023 Removal of Wall and Base Cabinet 100 LF ¥ ¥

D024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation

D025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation

D026 Removal of Duct 1,500 SF ¥ ¥

D027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)

D028 Removal of Steel Pipe or Stack 500 LF ¥ ¥

LXEZ 12-2667 FOR OFFICIAL USE ONLY (18 Apr 2012) Page 17 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

D029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥

D030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring

D031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud

D032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System

D033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

D034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

D035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)

D036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)

D037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area

D038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥

D039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥

D040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥

D041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos

D042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint

D043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint

D044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint

D045 Air Sampling & Testing with Transmission 50 EA ¥ ¥

LXEZ 12-2667 FOR OFFICIAL USE ONLY (18 Apr 2012) Page 18 of 26

Estimated Quantity Unit Unit Price

Estimated Amount

D046 Air Sampling & Testing with Phase 300 EA ¥ ¥ Contrast Microscopy (PCM)

D047 Wipe Sampling 30 EA ¥ ¥

D048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit

D049 Decontamination Unit 50 EA ¥ ¥

D050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

D051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

D052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

D053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

D054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥

D055 Shipping by Container (Half Full Size) 20 EA ¥ ¥

D056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)

D057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)

D058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)

D059 Removal and Dispose A/C Equipment 2 EA ¥ ¥

NEW WORK

D060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥

D061 Vinyl Cove Base 200 LF ¥ ¥

D062 Carpet 1,000 SF ¥ ¥

ESTIMATED THIRD OPTION YEAR TOTAL FOR

ELINS D001 THRU D062 ¥

LXEZ 12-2667 FOR OFFICIAL USE ONLY (18 Apr 2012) Page 19 of 26

FA5270-12-R-0011 EXHIBIT E

LXEZ 12-2667 (18 Apr 2012) Page 21 of 26

Period of Performance: One Year from Expiration of Option Year Three

ELIN Description Estimated Quantity Unit Unit Price

Estimated Amount

REMOVAL WORK

E001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

E002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)

E003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)

E004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)

E005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)

E006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)

E007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)

E008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)

E009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)

E010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)

E011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)

E012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)

(FOURTH OPTION YEAR)

REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,

VARIOUS LOCATIONS, OKINAWA, JAPAN

LXEZ 12-2667 (18 Apr 2012) Page 22 of 26

ELIN Description Estimated Quantity Unit Unit Price

Estimated Amount

E013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)

E014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)

E015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)

E016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)

E017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)

E018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)

E019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)

E020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)

E021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)

E022 Removal of Lighting Fixture 50 EA ¥ ¥

E023 Removal of Wall and Base Cabinet 100 LF ¥ ¥

B024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation

E025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation

E026 Removal of Duct 1,500 SF ¥ ¥

E027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)

E028 Removal of Steel Pipe or Stack 500 LF ¥ ¥

LXEZ 12-2667 (18 Apr 2012) Page 23 of 26

ELIN Description Estimated Quantity Unit Unit Price

Estimated Amount

E029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥

E030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring

E031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud

E032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System

E033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

E034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)

E035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)

E036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)

E037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area

E038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥

E039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥

E040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥

E041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos

E042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint

E043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint

E044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint

E045 Air Sampling & Testing with Transmission 50 EA ¥ ¥

E046 Air Sampling & Testing with Phase 300 EA ¥ ¥

LXEZ 12-2667 (18 Apr 2012) Page 24 of 26

ELIN Description Estimated Quantity Unit Unit Price

Estimated Amount

Contrast Microscopy (PCM)

E047 Wipe Sampling 30 EA ¥ ¥

E048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit

E049 Decontamination Unit 50 EA ¥ ¥

E050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

E051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa

E052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

E053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan

E054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥

E055 Shipping by Container (Half Full Size) 20 EA ¥ ¥

E056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)

E057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)

E058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)

E059 Removal and Dispose A/C Equipment 2 EA ¥ ¥

NEW WORK

E060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥

E061 Vinyl Cove Base 200 LF ¥ ¥

E062 Carpet 1,000 SF ¥ ¥

ESTIMATED FOURTH OPTION YEAR TOTAL FOR

ELINS E001 THRU E062 ¥

ESTIMATED GRAND TOTAL FOR

ELINS A001 THRU E062 ¥