FA5270-12-R-0011 EXHIBIT A
B-1
B-2 Place of Performance for Air Force:
a.
b.
c.
d.
B-3 Place of Performance for Army:
a.
b.
c.
B-4 Pricing Schedule:
B-5 Period of Performance: One Year from Date of Award
ELIN Description Estimated Quantity Unit Unit Price
Estimated Amount
REMOVAL WORK
A001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
A002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
A003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)
85% of all delivery orders are estimated to be performed in these areas: Air Force Installation: All of Kadena Air Base and 18MUNS Area. In addition this contract covers the following MFH Areas outside of Kadena Air Base: Chibana, Camp Shields, Camp Lester, Camp Foster (Futenma, Chatan, Sada, and Kishaba Terrace) and Plaza.
REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,
VARIOUS LOCATIONS, OKINAWA, JAPAN
Project Description: Project LXEZ 12-2667, Sampling, Testing, and Removal of Asbestos and Lead Base Paint, Various Bldgs., Various Locations, Okinawa, Japan.
PRICING SCHEDULE
(BASE YEAR)
5% of all delivery orders issued are estimated to be performed in the following MFH areas:
Camp McTureous and Camp Courtney.
5% of all delivery orders issued are estimated to be performed in the following MFH area:
Camp Kinser.
5% of all delivery orders issued are estimated to be performed in the following area:
Okuma Recreation Center.
5% of all delivery orders issued are estimated to be performed in the areas: Chimwan Area, Tengan and White Beach
For Okuma Recreation Center, Yaedake and Hill 450, the unit prices for work accomplished at these locations, the Government will pay 103 % of the price, that is add 3 % to the price, for work ordered and accomplished at those locations. No other adjustments to unit pricing shall be made on account of the comparative remoteness of these locations.
90% of all delivery orders issued are estimated to be performed in the areas: Naha Port, Fort Buckner and Torii Station.
5% of all delivery orders issued are estimated to be performed in the areas: Yaedake and Hill 450.
LXEZ 12-2667 (18 Apr 2012) Page 1 of 26
ELIN Description Estimated Quantity Unit Unit Price
Estimated Amount
A004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)
A005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)
A006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)
A007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)
A008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)
A009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)
A010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)
A011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)
A012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)
A013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)
A014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)
A015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)
A016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)
A017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)
A018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)
LXEZ 12-2667 (18 Apr 2012) Page 2 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
A019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)
A020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)
A021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)
A022 Removal of Lighting Fixture 50 EA ¥ ¥
A023 Removal of Wall and Base Cabinet 100 LF ¥ ¥
A024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation
A025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation
A026 Removal of Duct 1,500 SF ¥ ¥
A027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)
A028 Removal of Steel Pipe or Stack 500 LF ¥ ¥ (2-1/2" ø or Above)
A029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥
A030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring
A031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud
A032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System
A033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
A034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
A035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)
LXEZ 12-2667 (18 Apr 2012) Page 3 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
A036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)
A037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area
A038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥
A039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥
A040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥
A041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos
A042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint
A043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint
A044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint
A045 Air Sampling & Testing with Transmission 50 EA ¥ ¥ Election Microscopy (TEM)
A046 Air Sampling & Testing with Phase 300 EA ¥ ¥ Contrast Microscopy (PCM)
A047 Wipe Sampling 30 EA ¥ ¥
A048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit
A049 Decontamination Unit 50 EA ¥ ¥
A050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
A051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
A052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
A053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
LXEZ 12-2667 (18 Apr 2012) Page 4 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
A054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥
A055 Shipping by Container (Half Full Size) 20 EA ¥ ¥
A056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)
A057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)
A058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)
A059 Removal and Dispose A/C Equipment 2 EA ¥ ¥
NEW WORK
A060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥
A061 Vinyl Cove Base 200 LF ¥ ¥
A062 Carpet 1,000 SF ¥ ¥
ESTIMATED BASIC YEAR TOTAL FOR
ELINS A001 THRU A062 ¥
LXEZ 12-2667 (18 Apr 2012) Page 5 of 26
FA5270-12-R-0011 EXHIBIT B
Period of Performance: One Year from Expiration of the Base Year.
ELIN Description Estimated Quantity Unit Unit Price
Estimated Amount
REMOVAL WORK
B001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
B002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
B003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)
B004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)
B005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)
B006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)
B007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)
B008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)
B009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)
B010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)
B011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)
B012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)
(FIRST OPTION YEAR)
REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,
VARIOUS LOCATIONS, OKINAWA, JAPAN
PRICING SCHEDULE
LXEZ 12-2667 (18 Apr 2012) Page 6 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
B013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)
B014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)
B015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)
B016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)
B017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)
B018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)
B019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)
B020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)
B021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)
B022 Removal of Lighting Fixture 50 EA ¥ ¥
B023 Removal of Wall and Base Cabinet 100 LF ¥ ¥
B024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation
B025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation
B026 Removal of Duct 1,500 SF ¥ ¥
B027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)
B028 Removal of Steel Pipe or Stack 500 LF ¥ ¥ (2-1/2" ø or Above)
LXEZ 12-2667 (18 Apr 2012) Page 7 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
B029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥
B030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring
B031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud
B032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System
B033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
B034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
B035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)
B036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)
B037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area
B038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥
B039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥
B040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥
B041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos
B042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint
B043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint
B044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint
B045 Air Sampling & Testing with Transmission 50 EA ¥ ¥ Election Microscopy (TEM)
LXEZ 12-2667 (18 Apr 2012) Page 8 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
B046 Air Sampling & Testing with Phase 300 EA ¥ ¥ Contrast Microscopy (PCM)
B047 Wipe Sampling 30 EA ¥ ¥
B048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit
B049 Decontamination Unit 50 EA ¥ ¥
B050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
B051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
B052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
B053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
B054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥
B055 Shipping by Container (Half Full Size) 20 EA ¥ ¥
B056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)
B057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)
B058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)
B059 Removal and Dispose A/C Equipment 2 EA ¥ ¥
NEW WORK
B060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥
B061 Vinyl Cove Base 200 LF ¥ ¥
B062 Carpet 1,000 SF ¥ ¥
ESTIMATED FIRST OPTION YEAR TOTAL FOR
ELINS B001 THRU B062 ¥
LXEZ 12-2667 (18 Apr 2012) Page 9 of 26
FA5270-12-R-0011 EXHIBIT C
Period of Performance: One Year from Expiration of Option Year One
ELIN Description Estimated Quantity Unit Unit Price
Estimated Amount
REMOVAL WORK
C001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
C002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
C003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)
C004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)
C005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)
C006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)
C007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)
C008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)
C009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)
C010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)
C011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)
C012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)
(SECOND OPTION YEAR)
REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,
VARIOUS LOCATIONS, OKINAWA, JAPAN
LXEZ 12-2667 (18 Apr 2012) Page 11 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
C013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)
C014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)
C015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)
C016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)
C017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)
C018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)
C019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)
C020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)
C021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)
C022 Removal of Lighting Fixture 50 EA ¥ ¥
C023 Removal of Wall and Base Cabinet 100 LF ¥ ¥
C024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation
C025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation
C026 Removal of Duct 1,500 SF ¥ ¥
C027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)
C028 Removal of Steel Pipe or Stack 500 LF ¥ ¥
LXEZ 12-2667 (18 Apr 2012) Page 12 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
C029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥
C030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring
C031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud
C032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System
C033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
C034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
C035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)
C036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)
C037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area
C038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥
C039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥
C040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥
C041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos
C042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint
C043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint
C044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint
C045 Air Sampling & Testing with Transmission 50 EA ¥ ¥
LXEZ 12-2667 (18 Apr 2012) Page 13 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
C046 Air Sampling & Testing with Phase 300 EA ¥ ¥ Contrast Microscopy (PCM)
C047 Wipe Sampling 30 EA ¥ ¥
C048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit
C049 Decontamination Unit 50 EA ¥ ¥
C050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
C051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
C052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
C053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
C054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥
C055 Shipping by Container (Half Full Size) 20 EA ¥ ¥
C056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)
C057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)
C058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)
C059 Removal and Dispose A/C Equipment 2 EA ¥ ¥
NEW WORK
C060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥
C061 Vinyl Cove Base 200 LF ¥ ¥
C062 Carpet 1,000 SF ¥ ¥
ESTIMATED SECOND OPTION YEAR TOTAL FOR
ELINS C001 THRU C062 ¥
LXEZ 12-2667 (18 Apr 2012) Page 14 of 26
FA5270-12-R-0011 EXHIBIT D
Period of Performance: One Year from Expiration of Option Year Two
ELIN Description Estimated Quantity Unit Unit Price
Estimated Amount
REMOVAL WORK
D001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
D002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
D003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)
D004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)
D005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)
D006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)
D007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)
D008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)
D009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)
D010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)
D011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)
D012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)
(THIRD OPTION YEAR)
REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,
VARIOUS LOCATIONS, OKINAWA, JAPAN
LXEZ 12-2667 FOR OFFICIAL USE ONLY (18 Apr 2012) Page 16 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
D013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)
D014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)
D015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)
D016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)
D017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)
D018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)
D019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)
D020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)
D021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)
D022 Removal of Lighting Fixture 50 EA ¥ ¥
D023 Removal of Wall and Base Cabinet 100 LF ¥ ¥
D024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation
D025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation
D026 Removal of Duct 1,500 SF ¥ ¥
D027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)
D028 Removal of Steel Pipe or Stack 500 LF ¥ ¥
LXEZ 12-2667 FOR OFFICIAL USE ONLY (18 Apr 2012) Page 17 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
D029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥
D030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring
D031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud
D032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System
D033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
D034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
D035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)
D036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)
D037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area
D038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥
D039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥
D040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥
D041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos
D042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint
D043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint
D044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint
D045 Air Sampling & Testing with Transmission 50 EA ¥ ¥
LXEZ 12-2667 FOR OFFICIAL USE ONLY (18 Apr 2012) Page 18 of 26
Estimated Quantity Unit Unit Price
Estimated Amount
D046 Air Sampling & Testing with Phase 300 EA ¥ ¥ Contrast Microscopy (PCM)
D047 Wipe Sampling 30 EA ¥ ¥
D048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit
D049 Decontamination Unit 50 EA ¥ ¥
D050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
D051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
D052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
D053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
D054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥
D055 Shipping by Container (Half Full Size) 20 EA ¥ ¥
D056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)
D057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)
D058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)
D059 Removal and Dispose A/C Equipment 2 EA ¥ ¥
NEW WORK
D060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥
D061 Vinyl Cove Base 200 LF ¥ ¥
D062 Carpet 1,000 SF ¥ ¥
ESTIMATED THIRD OPTION YEAR TOTAL FOR
ELINS D001 THRU D062 ¥
LXEZ 12-2667 FOR OFFICIAL USE ONLY (18 Apr 2012) Page 19 of 26
FA5270-12-R-0011 EXHIBIT E
LXEZ 12-2667 (18 Apr 2012) Page 21 of 26
Period of Performance: One Year from Expiration of Option Year Three
ELIN Description Estimated Quantity Unit Unit Price
Estimated Amount
REMOVAL WORK
E001 Removal of Asbestos Single Layer 10,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
E002 Removal of Asbestos Double layer 3,000 SF ¥ ¥ Resilient Flooring and Mastic (Non-Friable)
E003 Removal of Carpet with Asbestos Mastic 3,000 SF ¥ ¥ (Non-Friable)
E004 Removal of Asbestos Vinyl Cove Base and 2,000 LF ¥ ¥ Mastic, Using Containment Area (Non-Friable)
E005 Removal of Asbestos Vinyl Cove Base and 100 LF ¥ ¥ Mastic, Using Glove Bag (Non-Friable)
E006 Removal of Asbestos Containing Acoustic 3,000 SF ¥ ¥ Ceiling Tile (Non-Friable)
E007 Removal of Ceiling or Wall Sprayed 1,000 SF ¥ ¥ Asbestos Materials (Friable)
E008 Removal of Asbestos Ceiling or Wall 1,000 SF ¥ ¥ Insulation (Friable)
E009 Removal of Asbestos Duct, Tank and 3,000 SF ¥ ¥ Boiler Insulation (Friable)
E010 Removal of Asbestos Duct Flange Gasket 1,000 SF ¥ ¥ (Friable)
E011 Removal of Asbestos Pipe Fitting Gasket 30 EA ¥ ¥ (Friable)
E012 Removal of Asbestos Flexible Joint at Air 500 SF ¥ ¥ Handler Unit or Duct (Friable)
(FOURTH OPTION YEAR)
REMOVE ASBESTOS AND LEAD BASE PAINT, VARIOUS BLDGS,
VARIOUS LOCATIONS, OKINAWA, JAPAN
LXEZ 12-2667 (18 Apr 2012) Page 22 of 26
ELIN Description Estimated Quantity Unit Unit Price
Estimated Amount
E013 Removal of Asbestos Pipe Insulation by Using 2,000 LF ¥ ¥ Containment Area (1/2"ø to 2"ø), (Friable)
E014 Removal of Asbestos Pipe Insulation by 500 LF ¥ ¥ Using Glove Bag (1/2"ø to 2"ø), (Friable)
E015 Removal of Asbestos Pipe Insulation by Using 500 LF ¥ ¥ Containment Area (2-1/2"ø to 6"ø), (Friable)
E016 Removal of Asbestos Pipe Insulation by 200 LF ¥ ¥ Using Glove Bag (2-1/2"ø to 6"ø), (Friable)
E017 Removal of Asbestos Cement Board or 1,000 SF ¥ ¥ Gypsum Board Wall Partition with Stud (Non-Friable)
E018 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Wall Sheathing with Furring (Non-Friable)
E019 Removal of Asbestos Cement Board or 3,000 SF ¥ ¥ Gypsum Board Ceiling with Susoension System (Non-Friable)
E020 Removal of Asbestos Cement Plaster 1,000 SF ¥ ¥ (Non-Friable)
E021 Removal of Asbestos Tape with Electrical 300 LF ¥ ¥ Insulated Cable (Friable)
E022 Removal of Lighting Fixture 50 EA ¥ ¥
E023 Removal of Wall and Base Cabinet 100 LF ¥ ¥
B024 Removal of Non-Asbestos Duct or Pipe 500 SF ¥ ¥ Insulation
E025 Removal of Non-Asbestos Wall or 1,000 SF ¥ ¥ Ceiling Insulation
E026 Removal of Duct 1,500 SF ¥ ¥
E027 Removal of Steel Pipe or Stack 300 LF ¥ ¥ (1/2" ø to 2" ø)
E028 Removal of Steel Pipe or Stack 500 LF ¥ ¥
LXEZ 12-2667 (18 Apr 2012) Page 23 of 26
ELIN Description Estimated Quantity Unit Unit Price
Estimated Amount
E029 Removal of Non-Asbestos Carpet 1,000 SF ¥ ¥
E030 Removal of Non-Asbestos Gypsum 3,000 SF ¥ ¥ Wallboard with Furring
E031 Removal of Non-Asbestos Gypsum 1,000 SF ¥ ¥ Wallboard Partition with Stud
E032 Removal of Non-Asbestos Ceiling with 1,000 SF ¥ ¥ Suspension System
E033 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
E034 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Hazardous waste, Dispose through DRMO)
E035 Removal of Interior Lead Base Paint 2,000 SF ¥ ¥ (Non-Hazardous Waste)
E036 Removal of Exterior Lead Base Paint 1,000 SF ¥ ¥ (Non-Hazardous Waste)
E037 Emergency Enclosure of Suspected ACM 1,000 SF ¥ ¥ and Contaminated Area
E038 Site Survey for Asbestos and Lead Base Paint 50 PN/DAY ¥ ¥
E039 Emergency Site Survey for Asbestos 10 PN/DAY ¥ ¥
E040 Bulk Sampling and Testing for Asbestos 500 EA ¥ ¥
E041 Emergency Bulk Sampling and Testing for 20 EA ¥ ¥ Asbestos
E042 Bulk Sampling and Testing for Lead Base 300 EA ¥ ¥ Paint
E043 Core Sampling and Testing for Lead Base 30 EA ¥ ¥ Paint
E044 Toxicity Analysis (TCLP) for Lead Base 30 EA ¥ ¥ Paint
E045 Air Sampling & Testing with Transmission 50 EA ¥ ¥
E046 Air Sampling & Testing with Phase 300 EA ¥ ¥
LXEZ 12-2667 (18 Apr 2012) Page 24 of 26
ELIN Description Estimated Quantity Unit Unit Price
Estimated Amount
Contrast Microscopy (PCM)
E047 Wipe Sampling 30 EA ¥ ¥
E048 Prefabricated Independent Scaffold, 30,000 SF ¥ ¥ (4' W × 6' L × 6' H) Module Unit
E049 Decontamination Unit 50 EA ¥ ¥
E050 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
E051 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility or DRMO in Okinawa
E052 Transportation by 4-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
E053 Transportation by 10-Ton Truck to Disposal 20 EA ¥ ¥ Site TSD facility on Mainland Japan
E054 Shipping by Container (20' Length Full Size) 20 EA ¥ ¥
E055 Shipping by Container (Half Full Size) 20 EA ¥ ¥
E056 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Friable Asbestos Material)
E057 Disposal and Land Fill Fee 100 CY ¥ ¥ (for Non-Friable Asbestos Material)
E058 Disposal and Land Fill Fee 500 KG ¥ ¥ (for Non-Hazardous Waste Lead Base Paint)
E059 Removal and Dispose A/C Equipment 2 EA ¥ ¥
NEW WORK
E060 Vinyl Composition Floor Tile 2,000 SF ¥ ¥
E061 Vinyl Cove Base 200 LF ¥ ¥
E062 Carpet 1,000 SF ¥ ¥
ESTIMATED FOURTH OPTION YEAR TOTAL FOR
ELINS E001 THRU E062 ¥
ESTIMATED GRAND TOTAL FOR
ELINS A001 THRU E062 ¥