Attachment 5 Seed Project.pdf
PDF 1 MB Posted
- Attached to
- Sampling, Testing, and Removal of Asbestos & Lead-Based Paint Federal contract opportunity
- Solicitation number
- FA5270-12-R-0011
About this file
Attachment 5 Seed Project
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| FA5270-12-R-0011 Amendment 01.pdf | ||
| Attachment 4 Asbestos Abatement Guideline EP1110-1-11 .pdf | ||
| Attachment 3 Drawings.pdf | ||
| Attachment 6 ACM LBP Past Performance Questionnaire.pdf | ||
| Attachment 1 Specifications.pdf | ||
| FA5270-12-R-0011 | — | |
| Exhibits A thru E.pdf | ||
| Attachment 2 Schedule of Material Submittals.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
(6 March 2012)
PROJECT DESCRIPTION: Sampling, Testing, and Abating Asbestos Floor Tiles, B940, Kadena AB, Okinawa, Japan
PROJECT NO.: LXEZ 11-2667-20
PROJECT MANAGER: Mr. Kiminori Matsumoto
PROJECT REQUIREMENTS:
1. The contractor shall furnish all supervision, labor, materials, equipment, tools, transportation and any other items or services necessary to accomplish the following: Project No. LXEZ 11- 2667-20, Sampling, Testing, and Abating Asbestos Floor tiles, B940, Kadena AB, Okinawa, Japan.
2. Place of Performance: Building 940, Kadena AB, Okinawa, Japan
3. Period of Performance: Total performance period will be noted on the Notice to Proceed (NTP). Contractor shall coordinate with inspector and using activities at least 14 days before starting the work.
4. Notice To Proceed: In accordance with local clause CONST-F-7166 of the basic contract, Notice to Proceed (NTP) will be issued within 20 calendar days after delivery order issuance.
5. Workdays and Hours: The contractor shall work in accordance with the basic contract specification, General Requirements. The contractor shall be allowed to work from 0730 to 1800 hours, Mondays through Saturday, excluding U.S. legal holidays in designated areas.
6. Progress Schedules: The contractor shall provide a Contract Progress Schedule (AF Form 3064) in accordance with the basic contract specification, General Requirements for projects with performance period over 91 calendar days. Contract Progress Schedule shall be submitted to the Contracting Officer within 14 calendar days prior to start of on-site work.
7. Liquidated Damages: The contractor shall pay to the Government liquidated damages in accordance with Section F, FAR clause 52.211-12, Liquidated Damages—Construction (Sep 2000), of the basic contract, the sum of $418.24 for each calendar day of delay beyond the scheduled completion date.
8. Submittals: The contractor shall provide the Government with Material Approval Submittals (AF Form 3000) in accordance with basic contract specification, General Requirements and as stated in Schedule of Material Submittals (AF Form 66).
FA5270-12-R-0011, Attachment 5
1236771209C Typewritten Text
PRICING SCHEDULE:
Item No. Description Estimated Quantity Unit Unit Price
Estimated Amount
REMOVAL WORK
A001 Removal of Asbestos Single Layer SF ¥ ¥
Resilient Flooring and Mastic (Non-Friable)
A040 Bulk Sampling and Testing for Asbstos EA ¥ ¥
A046 Air Sampling & Testing with Phase EA ¥ ¥ Contrast Microscopy (PCM)
A048 Prefabricated Independent Scaffold SF ¥ ¥ ( 4'W x 6'L x 6'H ) Module unit
A049 Decontamination Unit EA ¥ ¥
A050 Transportation by 4-Ton Truck to Disposal Site TSD Facility or DRMO in Okinawa EA ¥ ¥
A057 Disposal and Land Fill Fee (for Non-Friable Asbestos Material) CY ¥ ¥
A059 Remove and Dispose A/C Equipment
TOTAL ¥
¥76.4800 $
REMOVE ASBESTOS AND LEAD BASE PAINT
OKINAWA, JAPAN
Project LXEZ 11-2667-20, Abate Asbestos Floor Tiles, B940, Kadena Air Base
$1.00 =
| Pricing Schedule (Rev 3, Cont).pdf |
| Price schedule (Cont) |
File details come from the government source that posted it. Updated .