Attachment 2 Schedule of Material Submittals.pdf
PDF 757 KB Posted
- Attached to
- Sampling, Testing, and Removal of Asbestos & Lead-Based Paint Federal contract opportunity
- Solicitation number
- FA5270-12-R-0011
About this file
Attachment 2 Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| FA5270-12-R-0011 Amendment 01.pdf | ||
| Attachment 6 ACM LBP Past Performance Questionnaire.pdf | ||
| Attachment 1 Specifications.pdf | ||
| FA5270-12-R-0011 | — | |
| Exhibits A thru E.pdf | ||
| Attachment 5 Seed Project.pdf | ||
| Attachment 4 Asbestos Abatement Guideline EP1110-1-11 .pdf | ||
| Attachment 3 Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2 Page 1 of 10
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
SECTION 01 56 00 - ENVIRONMENTAL PROTECTION
01 56 00 - 3.02A1.b.Chap.1 1 Applicable Regulations, 4
01 56 00 - 3.02A1.b.Chap.2 7 days after 2 4 NTP of each D.O 01 56 00 - 3.02A1.b.Chap.3 7 days after
3 Water Resources 4 NTP of (if applicable) each D O
LXEZ 12-2667
Air Emissions & Ozone Depleting Substances
Training Program & Env Representative
14 days before site work
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
(if applicable) each D.O 01 56 00 - 3.02A1.b.Chap.4 7 days after
4 Hazardous Materials 4 NTP of (if applicable) each D.O 01 56 00 - 3.02A1.b.Chap.5 7 days after
5 Hazardous Waste 4 NTP of (if applicable) each D.O 01 56 00 - 3.02A1.b.Chap.6 7 days after
6 Solid Waste 4 NTP of each D.O
01 56 00 - 3.02A1.b.Chap.7 7 days after 7 Fuel Storage Tank 4 NTP of
(if applicable) each D.O 01 56 00 - 3.02A1.b.Chap.8 7 days after
8 Natural Resources 4 NTP of (if applicable) each D.O 01 56 00 - 3.02A1.b.Chap.9 7 days after
9 Polychlorinated Biphenyls (PCB) 4 NTP of (if applicable) each D.O 01 56 00 - 3.02A1.b.Chap.10 7 days after
10 Asbestos 4 NTP of (if applicable) each D.O
AF Form 66, Sep 86 1 Nov 2011
FA5270-12-R-0011
ATTACHMENT 2 Page 2 of 10
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
LXEZ 12-2667
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
01 56 00 - 3.02A1.b.Chap.11 7 days after 11 Radon 4 NTP of
(if applicable) each D.O 01 56 00 - 3.02A1.b.Chap.12 7 days after
12 Lead-Based Paint 4 NTP of (if applicable) each D.O 01 56 00 - 3.02A1.b.Chap.13 7 days after
13 4 NTP of each D.O
01 56 00 - 3.02B1 14 Applicable Regulations, 4
Spill Preventionand Response
14 days before site workTraining Program & Env Representative 01 56 00 - 3.02B3
15 Hazardous Materials 4 (if applicable) 01 56 00 - 3.02B4
16 Hazardous Waste 4 (if applicable) 01 56 00 - 3.02B5
17 Solid Waste 4 (if applicable) 01 56 00 - 3.02B6
18 Fuel Storage Tank 4 (if applicable) 01 56 00 - 3.02B7
19 Histrical and Calutural Resources 4 (if applicable) 01 56 00 - 3.02B9
20 Polychlorinated Biphenyls (PCB) 4 (if applicable) 01 56 00 - 3.02B10
21 Asbestos 4 (if applicable)
During site work
During site work
During site work
During site work
During site work
During site work
During site work workTraining Program & Env Representative
ATTACHMENT 2 Page 3 of 10
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
LXEZ 12-2667
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
01 56 00 - 3.02B11 22 Radon 4
(if applicable) 01 56 00 - 3.02B12
23 Lead-Based Paint 4 (if applicable) 01 56 00 - 3.02B13
24 4
01 56 00 - 3.02C4 25 Hazardous Waste 4
(if applicable)
3days after inspection
Spill Preventionand Response
During site work
During site work
During site work
(if applicable) 01 56 00 - 3.02C6
26 Fuel Storage Tank 4 (if applicable) 01 56 00 - 3.02C10
27 Asbestos 4
SECTION 02 41 00 - DEMOLITION AND REMOVAL
02 41 00 - 1.02 7 days after 28 Demolition and Removal 4 NTP of
Procedures each D.O.
SECTION 02 82 14.00 10 - ASBESTOS HAZARD CONTROL ACTIVITIES
02 82 14.00 10-1.03.A 29 4 30
02 82 14.00 10-1.03B 7 days after 30 4 NTP of each D.O.
3days after inspection
3days after inspection
Asbestos hazard Abatement Plan
Environmental Representative
ATTACHMENT 2 Page 4 of 10
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
LXEZ 12-2667
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
02 82 14.00 10-1.03C 7 days after 31 4 NTP of each D.O.
02 82 14.00 10-1.03D
32 4 30
02 82 14.00 10-1.03E.1 7 days after 33 4 NTP of each D.O.
02 82 14.00 10-1.03E.2.a 7 days after
34 HEPA Local Exhaust 4 NTP of Equipment each D O
Permit/ licenses/ notifications
Respitatory Protection Program
Shop Drawings
Equipment each D.O.
02 82 14.00 10-1.03E.2.b 7 days after
35 Vacuum Cleaning 4 NTP of Equipment each D.O.
02 82 14.00 10-1.03E.2.c 7 days after
36 Pressure Differential 4 NTP of Monitor each D.O.
02 82 14.00 10-1.03E.2.d 7 days after
37 Air Monitoring 4 NTP of Equipment each D.O.
02 82 14.00 10-1.03E.2.e 7 days after
38 Respirators 4 NTP of each D.O.
02 82 14.00 10-1.03E.2.f 7 days after 39 Personal Protective 4 NTP of
Clothing & Equipment each D.O.
02 82 14.00 10-1.03E.2g 7 days after
40 Glovebags 4 NTP of each D.O.
02 82 14.00 10-1.03E.2.h 7 days after 41 Duct Tape 4 NTP of each D.O.
ATTACHMENT 2 Page 5 of 10
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
LXEZ 12-2667
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
02 82 14.00 10-1.03E.2.i 7 days after 42 Disposal Containers 4 NTP of each D.O.
02 82 14.00 10-1.03E.2.j 7 days after
43 Sheet Plastic 4 NTP of each D.O.
02 82 14.00 10-1.03E.2.k 7 days after 44 Wetting Agent 4 NTP of each D.O.
02 82 14.00 10-1.03E.2.l 7 days after
45 Strippable Coating 4 NTP of each D Oeach D.O.
02 82 14.00 10-1.03E.2.m 7 days after 46 Prefabricated 4 NTP of
Decontamination Unit each D.O.
02 82 14.00 10-1.03E.2.n 7 days after
47 Material Safety Data 4 NTP of Sheets each D.O.
02 82 14.00 10-1.03E.3 7 days after
48 4 NTP of each D.O.
02 82 14.00 10-1.03E.4 7 days after 49 4 NTP of each D.O.
02 82 14.00 10-1.03F.1 3 days after
50 Exposure Assessment 4 inspection and Air Monitoring 02 82 14.00 10-1.03.F.2 3 days after
51 Local Exhaust System 4 inspection
02 82 14.00 10-1.03.F.3 3 days after 52 4 inspectionRecords of all waste sampling and test data
Qualifications
Training Program
ATTACHMENT 2 Page 6 of 10
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
LXEZ 12-2667
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
02 82 14.00 10- 1.03.G.1 7 days after 53 Vacuums 4 NTP of each D.O.
02 82 14.00 10-1.03.G.2 7 days after
54 Water Filtration 4 NTP of Equipment each D.O.
02 82 14.00 10-1.03.G.3 7 days after
55 Ventilation Equipment 4 NTP of each D.O.
02 82 14.00 10-1.03.G.4 7 days after 56 Other Equipment 4 NTP of
Required to Contain Airborne Asbestos Fibers each D ORequired to Contain Airborne Asbestos Fibers each D.O.
02 82 14.00 10- 1.03.H.1 within 60
57 4 days after issuance
02 82 14.00 10- 1.03.H.2 within 60 58 Waste Analysis 4 days after issuance 02 82 14.00 10- 1.03.H.3 within 60
59 4 days after issuance
02 82 14.00 10- 1.03.H.4 within 60 60 4 days after issuance 02 82 14.00 10- 1.24 Before each
61 4 DO const.
close
SECTION 02 82 33.13.20 - REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
02 82 33.13.20- 1.04.A.1 7 days after 62 Vacuum Filters 4 NTP of each D.O.
Manifest/Asbestos Waste Shipment Records
Weight Bill and Delivery Ticket
Scale Weight Measurement
Asbestos Survey or Sampling reports
ATTACHMENT 2 Page 7 of 10
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
LXEZ 12-2667
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
02 82 33.13.20- 1.04.A.2 7 days after 63 Respirators 4 NTP of each D.O.
02 82 33.13.20- 1.04.B.1 7 days after
64 Sampling Result 4 sampling
02 82 33.13.20- 1.04.B.2 7 days after 65 Occupational and Envi- 4 sampling ronmental Assessment 02 82 33.13.20- 1.04.B.3 7 days after
66 Toxicity Analysis (TCLP) 4 sampling
02 82 33.13.20- 1.04.C.1 7 days after 67 Qualifications of CP 4 NTP of each D.O.
02 82 33.13.20- 1.04.C.2 7 days after
68 4 NTP of each D.O.
02 82 33.13.20- 1.04.C.3 7 days after 69 Occupant Notification 4 NTP of each D.O.
02 82 33.13.20- 1.04.C.4 7 days after
70 Testing Certification of 4 NTP of Workers and Supervisors each D.O.
02 82 33.13.20- 1.04.C.5 7 days after
71 Notification of the 4 NTP of Commencement of LBP Hazard Abatement each D.O.
02 82 33.13.20- 1.04.C.6 7 days after
72 Third Party Consultant 4 NTP of Qualifications each D.O.
02 82 33.13.20- 1.04.C.7 7 days after
73 Lead-based Paint/ 4 NTP of Removal Control Plan Incl. CP approval each D.O.
Testing Laboratory Qualifications
ATTACHMENT 2 Page 8 of 10
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
LXEZ 12-2667
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
02 82 33.13.20- 1.04.C.8 7 days after 74 Rental Equipment 4 NTP of
Notification each D.O.
02 82 33.13.20- 1.04.C.9 7 days after
75 Respoiratory Protection 4 NTP of Program each D.O.
02 82 33.13.20- 1.04.C.10 7 days after
76 Hazard Communication 4 NTP of Program each D.O.
02 82 33.13.20- 1.04.C.11 7 days after
77 Vacuum Filters 4 NTP of each D Oeach D.O.
02 82 33.13.20- 1.04.C.12 7 days after 78 Clearance Certification 4 NTP of each D.O.
02 82 33.13.20- 1.04.D.1 7 days after
79 Chemicals and 4 NTP of Equipment each D.O.
02 82 33.13.20- 1.04.D.2 7 days after
80 Materials 4 NTP of each D.O.
02 82 33.13.20- 1.04.D.3 7 days after 81 MSDS for all 4 NTP of
Chemicals each D.O.
02 82 33.13.20- 1.04.E.1 3 days
82 Drawings inducating locations for 4 after LBP abatement conducted inspection 02 82 33.13.20- 1.04.E.2 3 days
83 Drawings inducating sampling 4 after locations conducted inspection 02 82 33.13.20- 1.08 Before each
84 4 DO const.
close
Lead Base Paint Survey or Sampling reports
ATTACHMENT 2 Page 9 of 10
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
LXEZ 12-2667
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
SECTION 09 65 00 - RESILIENT TILE FLOORING
09 65 00 - 1.02A.1 85 Resilient Flooring, Base 4 30 and Accessories 09 65 00 - 1.02A.2
86 Adhesives 4 30
09 65 00 - 1.02B 87 Resilient Flooring, Base 4 30 and Accessoriesand Accessories 09 65 00 - 1.02C
88 Manufactures' Instruction 4 30
SECTION 09 68 00 - CARPET
09 68 00- 1.02A 89 Shop drawing for insallation 4 30
09 68 00- 1.02B.1 90 carpet 4 30
09 68 00- 1.02B.2 91 Moldings 4 30
09 68 00- 1.02C.1 92 Carpet 4 30
09 68 00- 1.02C.2 93 Molding 4 30
ATTACHMENT 2 Page 10 of 10
(LOCAL MATERIAL)
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN CONTRACTOR
OF ITEM, CONTRACT SUB- RECEIVED CIVIL SUSPENSE FOLLOW-UP NOTIFIED CONTRACTOR FINAL REMARKS
REFERENCE, TYPE OF MISSION IN CON- ENGINEER- DATE RESUBMITTAL APPROVAL
SUBMITTAL DATE TRACTING ING
DIS-
APPROVED APPROVED
LXEZ 12-2667
R E
C O
R D
S
Remove Asbestos and Lead Base Paint, Various Bldgs, Various Locations, Okinawa, Japan
After NTP
SCHEDULE OF MATERIAL SUBMITTALS
09 68 00- 1.02D.
94 Moisture & Alkalinity 4 30
Tests 09 68 00- 1.02E
95 Carpet Certificates 4 30
09 68 00- 1.02F 96 Operation and 4 30
Maintenance Data