This document is a Questions and Answers (Q&A) attachment for a federal solicitation for a pool canopy installation project. The Q&A provides critical details about the project, including that it is a first-time request with no existing structure to remove. The proposed canopy will be 20' wide, 40' long, with a peak height of 15 feet, and will be installed near a pool on ground surface. The contractor is required to obtain a dig permit from CE (Civil Engineering). Key specifications include no sidewalls, installation location near a cement walkway and pool, and an unknown status regarding water pipe locations. The project is part of a Department of the Air Force Pacific Air Forces solicitation (Solicitation Number: FA524025QM140) for a pool canopy at 36 FSS, with offers originally due on 17 July 2025 and later extended to 22 July 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Is there any incumbent/recompete or this is a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past.
- No, this is the first request
2. Is there an existing awning or structure to remove?
- No
3. The structure is specified as 40’ x 20’; can you provide the required height?
- 10-15 ft
4. Can you provide photographs of the area where the canopy is to be installed including the surface?
- Please see other attachments
5. Is the installation surface concrete, asphalt, pavers, or ground?
- Ground
6. If the surface is concrete, can you provide details?
- N/A
7. Will the canopy be installed over the pool or near the pool?
- Near the pool
8. Are there any water pipes to the pool in the area where the canopy is to be installed?
- Unknown
9. If so, how deep below the concrete are the water pipes?
- Unknown
10. Attachment #2 of the RFQ states, “The contractor shall provide…permit and clearances…” What permits and clearances are required?
- Dig permit, acquired from CE
11. What is the required peak height, and the required sidewall height?
- Peak height: 15 ft, No sidewall
12. Can you please confirm whether the canopy is 40’ wide & 20’ long, or 20’ wide & 40’ long?
- 20’
Cement walkway 40’
Pool