Attachment 2 - Statement of Work.pdf
PDF 291 KB Posted
- Attached to
- 36 FSS Pool Canopy
- Solicitation number
- FA524025QM140
About this file
This Statement of Work (SOW) details the requirements for installing a new pool canopy at Building 1621 on Andersen Air Force Base in Guam. The project requires the contractor to provide labor, materials, and equipment to install a 40 ft x 20 ft awning made of waterproof and fire-retardant metal or heavy-duty fabric, with a metal frame and steel anchors for ground securing. The contractor must coordinate closely with FSS representatives to minimize business operation disruptions, repair any damages during installation, and properly dispose of all debris at an approved off-base location.
Key contractual requirements include providing a point of contact who can respond on-site within 1 hour during normal duty hours, complying with base security protocols, obtaining necessary identification items, adhering to traffic regulations, and following physical security guidelines. The normal work hours are 0730 to 1630, Monday through Friday, excluding federal holidays. The point of contact for the project is MSgt Elizabeth Townsend, who can be reached at elizabeth.townsend_saeteros@us.af.mil or 671-366-6220.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
POOL CANOPY B1621
ON
ANDERSEN AFB, GUAM
Table of Contents
1. DESCRIPTION OF SERVICES
1.1 REQUIREMENTS:
1.2 LIABILITY:
1.3 GOVERNMENT FURNISHED SERVICES:
2. GENERAL INFORMATION
2.1 HOURS OF OPERATION:
2.2 CONTRACTOR PERSONNEL:
3. SECURITY
3.1 PASS AND IDENTIFICATION ITEMS:
3.2 RETRIEVING IDENTIFICATION MEDIA:
3.3 TRAFFIC LAWS:
3.4 WEAPONS, FIREARMS, AND AMMUNITION:
3.5 FOR OFFICIAL USE ONLY (FOUO):
3.6 REPORTING REQUIREMENTS:
3.7 PHYSICAL SECURITY:
3.8 CONTROLLED/RESTRICTED AREAS:
3.9 MILITARY EXERCISES:
1. DESCRIPTION OF SERVICES
1.1 REQUIREMENTS:
The contractor shall provide all labor, materials, equipment, permit and clearances, transportation, supervision, and other incidental work required for the project. Other incidental work required includes all items and considerations necessary to ensure a complete and usable final product, including. Complete and usable final product means that the completed final product is finished throughout and can be used to fully satisfy the requirements and the intended purpose of the requirement.
The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and perform the work in accordance with the minimum requirements identified below. This includes but is not limited to financial resources, overall oversight and management or other resources including subcontractors that may affect performance of the instant acquisition.
Building 1621: Provide labor, tools, and temporary equipment to install new pool canopy.
Details of work as follows:
a. Provide awning of 40 ft x 20 ft made of a metal or heavy duty fabric that is waterproof and fire retardant
b. Provide a metal frame of 40 ft x 20 ft with steel anchors which allow for securing to ground
c. Contractor shall coordinate closely with FSS representatives to form a work schedule to minimize time business operations will be closed.
d. Contractor shall repair or replace items damaged during the installation. All damaged work shall be replaced, repaired, and restored to its original conditions at no additional cost to the Government.
e. All debris shall be disposed of properly at an approved off base disposal site location at no additional cost to the government.
Point of Contact:
MSgt Elizabeth Townsend; elizabeth.townsend_saeteros@us.af.mil or 671-366-6220
1.2 LIABILITY:
The contractor shall be liable for any damages resulting from any carelessness or failure to follow proper safety, installation, or maintenance procedures and standards.
1.3 GOVERNMENT FURNISHED SERVICES:
The government will provide emergency medical transportation and treatment if required. The contractor shall reimburse the Government for the cost of these medical services at current rates.
2. GENERAL INFORMATION
2.1 HOURS OF OPERATION:
The normal hours of operation are from 0730 to 1630, Monday through Friday, excluding federal holidays and PACAF Family days.
2.2 CONTRACTOR PERSONNEL:
The contractor shall provide point of contact (POC) for all contractual matters during all hours of operation. The POC shall respond on-site within 1 hour during normal duty hours of operation and within 2 hours during non-duty hours to discuss concerns with government personnel designated by the Contracting Officer to discuss problem areas.
3. SECURITY
3.1 PASS AND IDENTIFICATION ITEMS:
The contractor shall ensure the pass and identification items required for contract performance are obtained for employees.
3.2 RETRIEVING IDENTIFICATION MEDIA:
The contractor shall return all identification media and/or visitor passes from employees who depart for any reason before the contract expires; i.e. terminated for cause, reassignment, retirement, etc.
3.3 TRAFFIC LAWS:
The contractor and its employees shall comply with base traffic regulations. Traffic regulations include, but are not limited to:
· Employees shall wear seatbelts when operating or riding in any vehicle (military, company or private owned) while on installation.
· Speed limits on Andersen AFB are 25 MPH unless otherwise posted. Be aware of reduced speed limits and exercise caution when driving in base housing and school zones.
· All vehicle operators on the installation shall not use cell phones unless the vehicle is safely parked or they are using a 100% hands free device. The wearing of any other portable headphones, earphones or other listening devices while operating a motor vehicle is prohibited.
3.4 WEAPONS, FIREARMS, AND AMMUNITION:
Employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within vehicles (military, contractor-owned, or privately owned) while on Andersen AFB.
3.5 FOR OFFICIAL USE ONLY (FOUO):
The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
3.6 REPORTING REQUIREMENTS:
Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified/unclassified defense information. Employees shall be briefed by their immediate supervisor upon initial on-base assignment.
3.7 PHYSICAL SECURITY:
The contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment and materials shall be secured.
3.8 CONTROLLED/RESTRICTED AREAS:
The contractor shall implement local base procedures for entry to AF Controlled/Restricted areas where contractor personnel will work. An AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by 36 FSS security manager before restricted area badges (RAB) will be issued. Employees must have a completed and favorable NACI investigation before receiving a RAB. Interim access can be granted in accordance with AFI 31- 501, Personnel Security Program Management.
3.9 MILITARY EXERCISES:
No compensation will be claimed for any delays resulting from re-entry procedures due to exercises.
| 1. DESCRIPTION OF SERVICES |
| 1.1 REQUIREMENTS: |
| 1.2 LIABILITY: |
| 1.3 GOVERNMENT FURNISHED SERVICES: |
| 2. GENERAL INFORMATION |
| 2.1 HOURS OF OPERATION: |
| 2.2 CONTRACTOR PERSONNEL: |
| 3. SECURITY |
| 3.1 PASS AND IDENTIFICATION ITEMS: |
| 3.2 RETRIEVING IDENTIFICATION MEDIA: |
| 3.3 TRAFFIC LAWS: |
| 3.4 WEAPONS, FIREARMS, AND AMMUNITION: |
| 3.5 FOR OFFICIAL USE ONLY (FOUO): |
| 3.6 REPORTING REQUIREMENTS: |
| 3.7 PHYSICAL SECURITY: |
| 3.8 CONTROLLED/RESTRICTED AREAS: |
| 3.9 MILITARY EXERCISES: |
File details come from the government source that posted it. Updated .