Attachment 1 - Statement of Work (Giant Voice Cable Relocation).pdf
PDF 188 KB Posted
- Attached to
- RFQ - 36 WG Giant Voice System - Cable Relocation (GUAM) Federal contract opportunity
- Solicitation number
- FA524025Q0011
About this file
This Statement of Work outlines requirements for relocating Giant Voice RF antenna connection cables at the Installation Control Center (Building 21007) at Andersen Air Force Base, Guam, under solicitation FA524025Q0011.
The contractor must reroute existing cables from the weather cubby through a new conduit pipe, verify/relocate the roof-mounted Giant Voice RF Antenna and lightning protection system as needed, and ensure proper grounding. Key requirements include: Federal Signal certification, ability to perform VSWR checks, verification of GPS antenna functionality (must poll 3+ satellites), maintaining 10-foot separation from other roof antennas, providing a bucket truck for 44-foot roof access, installing cable trays if needed, and sealing the original cable entry point. The period of performance is one base month (30 calendar days) with work hours Monday-Friday 0730-1630, with possible weekend accommodation. The government will provide the Giant Voice Antenna while the contractor must supply all other equipment, materials, transportation and personnel needed for completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 - Site Visit Sign In Sheet_Redacted.pdf | ||
| Attachment 5 - Site Visit Details and Instructions.pdf | ||
| RFQ - 36 WG Giant Voice System - Cable Relocation.pdf | ||
| Attachment 1 - Statement of Work (Giant Voice Cable Relocation).pdf | ||
| Attachment 6 - Site Visit Sign In Sheet_Redacted.pdf | ||
| Attachment 4 - Provisions and Clauses.pdf | ||
| Attachment 5 - Site Visit Details and Instructions.pdf | ||
| RFQ - 36 WG Giant Voice System - Cable Relocation.pdf | ||
| Attachment 3 - Wage Determination (WD) 2015-5693 Rev 23.pdf | ||
| Attachment 1 - Statement of Work (Giant Voice Cable Relocation).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS, 36TH WING (PACAF)
ANDERSEN AIR FORCE BASE, GUAM
FA524024Q0011 36 WG ICC Giant Voice Cable Relocation Page 1 of 4
STATEMENT OF WORK
For
FA524025Q0011
36 Wing Installation Control Center Giant Voice Cable Relocation
Revised: 13 February 2025
TABLE OF CONTENTS
1. DESCRIPTION OF SERVICES
2. REQUIREMENTS:
3. PERFORMANCE:
4. LIABILITY:
5. GOVERNMENT FURNISHED SERVICES:
6. SECURITY:
FA524024Q0011 36 WG ICC Giant Voice Cable Relocation Page 2 of 4
1. DESCRIPTION OF SERVICES:
1.1. This is a contract to provide the rerouting of the Giant Voice RF (Radio Frequency) antenna connection cables in the Installation Control Center, building 21007. They are currently run through the weather cubby and need to be rerouted through a conduit pipe as a permanent solution. In addition, the Giant Voice RF Antenna and lightning protection located on the roof of the facility and below the antenna are to be checked and moved if placed incorrectly or if necessary for new placement of antenna, while ensuring grounding cables are placed correctly. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
2. REQUIREMENTS:
The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, supplies, antenna cables, grounding cables, and other items and services necessary to perform the rerouting of the Giant Voice antenna connection cables, placement of the antenna and lightning protection, to include the ground cables in accordance with (IAW) the manufacturer’s specifications, and any government, safety, or local regulations and laws.
The government will provide the Giant Voice Antenna.
The Contractor must:
- Be Federal Signal certified
- Be capable of performing XMT/RCV (Transmit/Receive) Voltage Standing Wave Ratio
(VSWR) checks to ensure the RF (Radio Frequency) cabling has minimal RF transmit and receive level losses.
- Ensure RF Giant Voice antenna is grounded, if antenna is moved, the contractor will ensure it is grounded correctly.
- Capable of verifying that the GPS (Global Positioning System) antenna is properly installed and is polling at least three (3) or more satellites ensuring proper GPS time sync and the base station clock time is correct.
- Ensure the RF antenna mount has at least 10 feet of separation from other antennas on the roof.
- Provide a bucket truck to gain access to forty-four (44) foot roof.
- Provide cable trays if current cable trays are full or unsatisfactory.
- Close the hole for the original cable point of entry.
3. PERFORMANCE:
The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, supplies, antenna cables, grounding cables, and other items and services necessary to perform the rerouting of the Giant Voice antenna connection cables, placement of the antenna and lightning protection, to include the ground cables in accordance with (IAW)
FA524024Q0011 36 WG ICC Giant Voice Cable Relocation Page 3 of 4 the manufacturer’s specifications, and any government, safety, or local regulations and laws.
The contractor shall disconnect and reroute the Giant Voice RF antenna connection cables, so they no longer run through the weather cubby, and instead are fed through the conduit pipe and once more reconnected to the Giant Voice equipment located in the Command Post Emergency Actions Cell. An initial diagram of where the RF cables and antenna are located and where the cables are to be rerouted through will be provided by the Government, and may be modified or changed during a site visit between the Command Post and Contractor. In addition, the Contractor must ensure the GPS antenna is properly installed and polling at least 3 or more satellites, ensuring proper GPS time sync and the Giant Voice base station clock time is correct. Furthermore, the Contractor must ensure the antenna and antenna cables are properly grounded, to include in the case the antenna is moved. The Contractor must provide cable trays for the antenna cables in the case that the current cable trays are full or unsatisfactory. Moreover, the contractor must ensure the hole left from the original point of entry for the cables is properly sealed. The RF antenna mount must have at least 10 feet of separation from other antennas on the roof. To gain access to the antennas located on the facility’s roof, the Contractor is required to provide a bucket truck capable of reaching heights of approximately forty-four (44) feet, as the facility does not have any roof access points.
Period of performance shall be for one (1) Base Month of 30 calendar days. Work hours are Monday through Friday 0730-1630. Weekends may be accommodated as needed by contractor request.
4. LIABILITY:
The contractor shall be liable for any damages resulting from any carelessness or failure to follow proper safety, installation, engineering, or maintenance procedures and standards.
5. GOVERNMENT FURNISHED SERVICES:
The government will provide emergency medical transportation and treatment if required. The contractor shall reimburse the Government for the cost of these medical services at current rates.
6. SECURITY:
6.1. PASS AND IDENTIFICATION ITEMS: The contractor shall ensure the pass and identification items required for contract performance are obtained for employees.
6.2. RETRIEVING IDENTIFICATION MEDIA: The contractor shall return all identification media and/or visitor passes from employees who depart for any reason before the contract expires; i.e. terminated for cause, reassignment, retirement, etc.
6.3. TRAFFIC LAWS: The contractor and its employees shall comply with base traffic regulations. Traffic regulations include, but are not limited to:
FA524024Q0011 36 WG ICC Giant Voice Cable Relocation Page 4 of 4
6.3.1. Employees shall wear seatbelts when operating or riding in any vehicle (military, company or private owned) while on installation.
6.3.2. Speed limits on Andersen AFB are 25 MPH unless otherwise posted. Be aware of reduced speed limits and exercise caution when driving in base housing and school zones.
6.3.3. All vehicle operators on the installation shall not use cell phones unless the vehicle is safely parked or they are using a 100% hands free device. The wearing of any other portable headphones, earphones or other listening devices while operating a motor vehicle is prohibited.
6.4. WEAPONS, FIREARMS, AND AMMUNITION: Employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within vehicles (military, contractor-owned, or privately owned) while on Andersen AFB.
6.5. FOR OFFICIAL USE ONLY (FOUO): The contractor shall comply with DoD 5400.7-
R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
6.6. REPORTING REQUIREMENTS: Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified/unclassified defense information. Employees shall be briefed by their immediate supervisor upon initial on-base assignment.
6.7. PHYSICAL SECURITY: The contractor shall be responsible for safeguarding all
Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.
| 1. DESCRIPTION OF SERVICES: |
| 2. REQUIREMENTS: |
| 3. PERFORMANCE: |
| 4. LIABILITY: |
| 5. GOVERNMENT FURNISHED SERVICES: |
| 6. SECURITY: |
File details come from the government source that posted it. Updated .