About this file
This document is a Solicitation Amendment for a federal construction contract. The amendment revises the Period of Performance (POP) from 540 calendar days to 640 calendar days, updates the performance period in the SF 1442 forms, and modifies the delivery schedule from September 2024 - April 2026 to September 2024 - July 2026. The contract is for a full depth runway repair approximately 150 feet wide by 8,500 feet long at Andersen Air Force Base in Guam. The project includes demolition, subgrade compaction, new base course and surface course, pavement markings, and grading. This is a Firm-Fixed-Price construction contract set aside for HUBZone small businesses under NAICS code 237310 (Highway, Street, and Bridge Construction). The Government intends to award to one responsible offeror whose proposal provides the best value.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification):
The purpose of this amendment is to:
1. Revise the Period of Performance (POP) stated in the Scope of Work (SOW) (Attachment 01) dated 23 August 2024 from 540 calendar days to 640 calendar days;
2. Revise the Performance Period in Block 10 of the SF 1442 from 550 calendar days to 640 calendar days;
3. Revise the Performance Period in Block 11 of the SF 1442 from 550 calendar days to 640 calendar days;
4. Revise the delivery schedule from 30 September 2024 - 03 April 2026 to 30 September 2024 - 02 July 2026; and
5. Revise FAR 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984).
All other terms and conditions remain unchanged.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Contract Description
This is a competitive HUBZone set-aside for a “Design- Build” Construction Contract to perform a full depth runway repair that is approximately 150 feet wide by 8,500 feet long. The project includes demolishing and removing all surface course and base course to existing subgrade in accordance with the Statement of Work and attachments herein (Section J). The mandatory Performance Period is 550 calendar days.
This is a solicitation for a Firm-Fixed-Price (FFP) construction contract for Project No. SAKW 23-5001 Repair Thunder Landing Zone on Northwest Field (NWF) Andersen Air Force Base (AAFB), Guam.
North American Industry Classification System Codes (NAICS): This acquisition is procured under NAICS code 237310 Highway, Street, and Bridge Construction with a size standard of $45M.
Please reference Section L, Instructions, Conditions and Notices to Offerors for proper preparation and submission of proposals. Proposals MUST BE submitted electronically through PIEE.
The Government intends to award to one (1) responsible offeror whose proposal conforms to all required terms and conditions, to include all required representations and certifications, meets all requirements set forth in the RFP, and provides the best value to the Government based on the results of the evaluation as described in Section M, Evaluation Factors for Award.
In accordance with FAR 36.204(h) and DFARS 236.204
(ii) the magnitude of this project is between $25,000,000.00 and $100,000,000.00.
A pre-proposal site visit is scheduled for this project. See instructions in Section L.
Information and instructions for Requests for Information (RFIs) will be provided and updated on SAM.gov posting.
This is a competitive HUBZone set-aside for a “Design- Build” Construction Contract to perform a full depth runway repair that is approximately 150 feet wide by 8,500 feet long. The project includes demolishing and removing all surface course and base course to existing subgrade in accordance with the Statement of Work and attachments herein (Section J). The mandatory Performance Period is 640 calendar days.
This is a solicitation for a Firm-Fixed-Price (FFP) construction contract for Project No. SAKW 23-5001 Repair Thunder Landing Zone on Northwest Field (NWF) Andersen Air Force Base (AAFB), Guam.
North American Industry Classification System Codes (NAICS): This acquisition is procured under NAICS code 237310 Highway, Street, and Bridge Construction with a size standard of $45M.
Please reference Section L, Instructions, Conditions and Notices to Offerors for proper preparation and submission of proposals. Proposals MUST BE submitted electronically through PIEE.
The Government intends to award to one (1) responsible offeror whose proposal conforms to all required terms and conditions, to include all required representations and certifications, meets all requirements set forth in the RFP, and provides the best value to the Government based on the results of the evaluation as described in Section M, Evaluation Factors for Award.
In accordance with FAR 36.204(h) and DFARS 236.204
(ii) the magnitude of this project is between $25,000,000.00 and $100,000,000.00.
A pre-proposal site visit is scheduled for this project. See instructions in Section L.
Information and instructions for Requests for Information (RFIs) will be provided and updated on SAM.gov posting.
FA524024R00070003
THIS ACQUISITION IS BEING ISSUED AS A
HISTORICALLY UNDERUTILIZED BUSINESS
ZONE PROGRAM SMALL BUSINESS SET-ASIDE.
OFFERORS NOT MEETING THIS CRITERIA WILL
BE DEEMED NON-RESPONSIVE AND INELIGIBLE
FOR AWARD.
THIS ACQUISITION IS BEING ISSUED AS A
HISTORICALLY UNDERUTILIZED BUSINESS
ZONE PROGRAM SMALL BUSINESS SET-ASIDE.
OFFERORS NOT MEETING THIS CRITERIA WILL
BE DEEMED NON-RESPONSIVE AND INELIGIBLE
FOR AWARD.
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO CHANGED
BY
Description SAKW 23-5001 Repair Thunder LZ, Northwest Field (NWF) Andersen Air Force Base (AAFB), Guam
SAKW 23-5001 Repair Thunder Landing Zone (LZ), Northwest Field (NWF) Andersen Air Force Base (AAFB), Guam
Section F - Deliveries or Performance
The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO
Period of Performance 30 Sep 2024 to 03 Apr 2026 30 Sep 2024 to 02 Jul 2026
Ship To - DoDAAC: F2CFLG
INFORMATION FROM TO
Delivery Delivery Period PeriodStart = 30 Sep 2024. PeriodEnd = 03 Apr 2026.
Delivery Period PeriodStart = 30 Sep 2024. PeriodEnd = 02 Jul 2026.
Section I - Contract Clauses
Additional Information/Notes
The following clauses were modified:
52.211-10Commencement, Prosecution, and Completion of Work.Mar 1984 hereby reads as follows:
As prescribed in , insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The 11.404(b) clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within calendar days after the date the Contractor one (1) calendar day receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than . * 640 calendar days The time stated for completion shall include final cleanup of the premises.
(End of clause)
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0003 |
| EffDate: 23 Aug 2024 |
| ReqNo: |
| ProjNo: SAKW 23-5001 |
| IssCode: FA5240 |
| AdmCode: |
| IssuedBy: FA5240 36 CONS LGC |
APO AP 96543-4040, UNIT 14040
APO, AP 96543-4040
UNITED STATES
Jennifer Taitague, Email: jennifer.taitague@us.af.mil Telephone: 671-366-5144 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA524024R0007 |
| SolDate: 02 Aug 2024 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Katrina Pangelinan |
| ContDate: |
| CODate: 23 Aug 2024 |