This document contains questions and answers related to federal solicitation number FA524023R0028 for renovations to Aircraft Equipment Maintenance Facilities B18004 and B18009 located at Andersen Air Force Base in Guam. The scope of work includes painting interior and exterior surfaces, replacing roll-up doors and door hardware, installing new electrical panels, outlets, wires, and conduits, and adding a new 480V disconnect. Clarification was provided that seismic remediation is not required, and that power outages for equipment replacement would be limited to weekends and after-hours.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question # Question/Comment Government Response
Statement of Work 09 (SOW) June 2023 - Attachment 3 Floor Plan B18004 with notes.
The floor plan drawing of B18004 is not clear. Please provide the clear copy of drawings.
Refer to Solicitation Amendment FA524023R00280003.
2 During the site visit, we could not access B18009.
Please provide required pictures of B18009.
Refer to Solicitation Amendment FA524023R00280003.
3 During the site visit, we noticed that there is a diesel tank behind B18009, please confirm if it is connected to B18009.
It is not connected.
4 Please provide the existing electrical As Built drawings of B18004. Refer to Solicitation Amendment FA524023R00280003.
During the site visit, we found that all roll-up doors in B18004 are motorized roll up doors. But in scope of work under (SOW) 2.3.3 REPAIR AND CONSTRUCTION WORK, there are 2 different scopes as follows:
a. Provide and install new roll up doors, door frames and hardware’s
b. Provide and install new motorized roll up doors, sensors, controls with manual chain, metal covers and seals Please confirm all roll-up doors will be motorized roll-up doors, or if there are non-motorized roll up doors, please indicate which are not motorized roll-up doors.
All roll up doors are motorized.
During site visit, Panel-X in B18004 was closed with screws and we could not get the information about the breaker used for that panel.
On the Panel-X, it indicated “JUNCTION BOX ONLY, NO CB” and
“120/240 VOLTS SINGLE PHASE 3W”.
Please provide the proper requirements and information for the panel-X.
Panel X is no longer being used as a “panel”. It is currently a junction box with electrical wires going through it. The request was to replace the panel next to it and eliminate the panel X by removing it and relocating the electrical wires going through it.
FA524023R00280003 - AJJY 23-1024 Renovate Aircraft Equipment Maintenance Facilities B18004 and B18009 Questions & Answers
As per (SOW) “2.3.3 REPAIR AND CONSTRUCTION WORK”:
• Paint wall surfaces inside of B18009; inside and outside B18004 as per Andersen AC&BDS and as needed.
Please clarify if any existing wall mounted electrical equip and existing conduits will need to be temporarily removed to give way to the painting work, and then reinstalled to match existing.
No, we do not need to remove/replace conduits to paint.
B18004 - As per (SOW) “2.3.3 REPAIR AND CONSTRUCTION WORK":
• Provide and install new conduits.
Please clarify if this requirement applies to the work required on the new roll-up doors only.
New conduits as needed, if corroded, broken, or requires replacement for all electrical equipment, not just roll-up doors.
B18004 - As per (SOW) “2.3.3 REPAIR AND CONSTRUCTION WORK”:
• Provide required utilities: power if it affects the facilities and needs to be isolated. Coordinate with the facility manager, 36 Civil Engineering shops, Project manager and Engineering Tech and provide a updated schedule on how long it will be out. So that it does not impact the User.
On replacing panelboards with new, please advise what is the maximum allowed downtime (power outage) of any equipment.
Weekend only and after hours to maximize allowed downtime of any equipment. Provide a three week look ahead and a construction schedule that is approved by the user and the shop; so that the user and shop will know when the outage will occur.
B18004 - As per (SOW) “2.3.3 REPAIR AND CONSTRUCTION WORK”:
• Provide and install new Amps, 120-volt, single phase branch circuit to support new electrical panels - ie,.. lights, switches and others.
Inclusive conduits, wires and accessories to complete the system that support the new electrical panels.
1) Please clarify what is the new “Amps” rating.
2) Please advise what type of load the new “Amps” rating will serve.
3) Please clarify if the intent of the “inclusive conduits, wires, and accessories.
Discuss with the Designer of Record (DOR).
B18004 - As per (SOW) “2.3.3 REPAIR AND CONSTRUCTION WORK”:
• Provide and install new branch electrical panel - see attachments for location.
1) Please clarify if the intent is to replace the panelboards in kind (same main Amps rating; branch breakers to be replaced with same rating).
2) If the existing Panel has no spare breaker, or no space provisions for future breakers; please advise if these will not be provided. If to be provided, please provide minimum quantities.
3) If there are existing panelboard branch circuit wiring installed but are not working, this project will identify these circuits, but will not repair/replace these circuit wiring. Please clarify.
The panel board should be a 1 for 1 replacement for the out of date panels being old and parts are no longer available
B18004 - As per (SOW) “2.3.3 REPAIR AND CONSTRUCTION WORK”:
• Provide fuse boxes as needed.
1) There are existing fuse boxes installed. Please advise if the intent is to replace these in kind.
2) If existing equipment requires “fuse protection” as required by the equipment manufacturer, but this is not installed; this project will provide fuse protection. Please clarify.
Provide a new disconnect 480v next to already existing disconnect. The intent is not to replace existing but to add additional disconnect. Some of the electrical panelboards have a fuse box that powers it, they should be replaced by panelboard with main breaker powering it to eliminate the fuse box.
B18004 - As per (SOW) “2.3.3 REPAIR AND CONSTRUCTION WORK”:
• Ensure there is adequate sizing of equipment (panels, circuit breakers, fuses, conduits , cables and other hardware. Ensure that the electrical system is complete and usable. Also that all accessories are stainless steel as per standards. - Please clarify if the intent of this scope is to check and verify all circuits from existing panelboards that are to be replaced; so that it ensures these circuits meet NFPA 70 and manufacturer’s requirements. This scope could entail a complete rewiring work, please clarify.
Discuss with the Designer of Record (DOR).
B18004 - As per (SOW) “2.3.3 REPAIR AND CONSTRUCTION WORK”:
• Provide and install electrical outlets, wires, conduits, boxes and accessories Please clarify if the intent is to provide new electrical outlets. If yes, please advise where are these outlets required and what are their electrical ratings.
Discuss with the Designer of Record (DOR).
15 B18009 - Site visit on 9-Aug 2023 was not able to access the interior.
Please advise if a site re-visit can be scheduled.
No. Refer to the attachments of interior pictures included in Solicitation Amendment FA524023R00280003.
B18009 - Painting of interior of building is required.
Please advise if any wall mounted electrical equipment (Panelboard, safety switches, control panels, devices/conduits) will need to be removed and reinstalled to give way to the painting work.
No, we do not need to remove/replace conduits, panels, etc. to paint.
17 Is Seismic Rehab required for this project as stated on paragraph 2.4?
Seismic rehab is not required for this project because we are only painting, preparing wall surfaces to receive new paint, changing roll up doors, roll up door hardwares; accessories to include but not limited to sensors, control panels, manual chain for override when power is not available and electrical items like panels, outlets wires, conduits, boxes, step down transformer that are old or parts no longer available and bring up electrical items needed in order to make it complete and usable.