Attachment 4 - Section L.pdf

PDF 146 KB Posted

Attached to
AJJY 23-1024 Renovate Aircraft Equipment MX Facilities B18004 and B18009
Solicitation number
FA524023R0028
Issued by

About this file

This document provides instructions to prospective offerors responding to solicitation number FA524023R0028 for renovations to aircraft equipment maintenance facilities B18004 and B18009. Offerors must submit proposals electronically through the Procurement Integrated Enterprise Environment by the date and time specified in the solicitation. Proposals must be organized into three volumes including a completed SF-1442, a minimum of three past performance fact sheets with corresponding past performance questionnaires, and proof of bonding capacity for 100% of the proposed price from an approved surety. The scope of work involves renovations to support aircraft equipment maintenance at specified facilities for the Department of the Air Force Pacific Air Forces.

View the file

Other files

File Type Posted
RFI_QandA FA524023R00280003_01Sept23.pdf PDF
RFI_QandA FA524023R00280003_31Aug23.pdf PDF
Attachment 13 - B18004 Electrical Lighting Plan.pdf PDF
Attachment 15 - B18009 Interior Picture 02.pdf PDF
Solicitation Amendment - FA524023R00280003 SF1442.pdf PDF
Attachment 12 -B18004 Electrical As-Built Sector B.pdf PDF
Attachment 24 - B18009 Interior Picture 11.pdf PDF
Attachment 21 - B18009 Interior Picture 08.pdf PDF
Attachment 25 - B18009 Interior Picture 12.pdf PDF
Attachment 14 - B18009 Interior Picture 01.pdf PDF
Attachment 11 -B18004 Electrical As-Built Sector A.pdf PDF
Attachment 20 - B18009 Interior Picture 07.pdf PDF
Solicitation Amendment FA524023R00280003 SF30.pdf PDF
Attachment 17 - B18009 Interior Picture 04.pdf PDF
Attachment 10 - B18004 Enlarged Floor Plan of SOW Attachment 3.pdf PDF
Attachment 22 - B18009 Interior Picture 09.pdf PDF
Attachment 19 - B18009 Interior Picture 06.pdf PDF
Attachment 18 - B18009 Interior Picture 05.pdf PDF
Attachment 23 - B18009 Interior Picture 10.pdf PDF
Attachment 16 - B18009 Interior Picture 03.pdf PDF
Solicitation Amendment FA524023R00280002 SF30.pdf PDF
Solicitation Amendment - FA524023R00280002 SF1442.pdf PDF
Solicitation Amendment FA524023R00280001 SF1442.pdf PDF
Solicitation Amendment FA524023R00280001 SF30.pdf PDF
Attachment 5 - Section M.pdf PDF
Attachment 7 - Past Performance Questionnaire.docx DOCX document
Attachment 1 - Statement of Work 09 June 2023.pdf PDF
Attachment 2 - ACBDS.pdf PDF
Attachment 8 - Site Visit Instructions.pdf PDF
Attachment 6 - Past Performance Fact Sheet.docx DOCX document
Attachment 9 - PIEE Proposal Manager Guide.pdf PDF
Attachment 3 - Wage Determination (GU20220001).pdf PDF
Solicitation - FA524023R0028 SF1442.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SSP Attachment 3 Section L - Instructions, Conditions, and Notices to Offerors

1. PROPOSAL DELIVERY INSTRUCTIONS

1.1 Offerors must follow the instructions contained herein. Offerors are cautioned that noncompliance with any of the terms and conditions of the solicitation may result in their proposal being deemed ineligible for consideration or award. Offerors shall submit only one proposal and the Government will review only one proposal per offeror. Proposals must be received by 36 CONS/PKA no later than the date and time specified in Block 13 of the solicitation. Proposals delivered after the exact date and time for receipt of proposals will not be considered.

1.2 Electronic bidding will be utilized for this acquisition. Prospective offerors SHALL deliver proposals through the Procurement Integrated Enterprise Environment (PIEE). The web link is posted in the solicitation.

1.3 In order to submit proposals via PIEE, offerors must create an account, identify a Proposal Manager and be logged in. Instructions have been posted with the solicitation package.

2. VOLUME INSTRUCTIONS

2.1 General. Prospective offerors SHALL organize electronic proposals in the following volumes:

Volume Description Number of Copies I Completed SF 1442 (Solicitation) One (1) II Past Performance Fact Sheets One (1) for each effort III Bonding One (1)

2.1.1 Proposals shall be in the English language and all monies in US Dollars.

2.1.2 Volumes (i.e. files) shall be separated and easily identified (ex. Volumes I, II, & III).

2.1.3 Only the SF 1442, Past Performance Fact Sheet, Past Performance Questionnaires (PPQs) received from the applicable Points of Contact (POCs), and bonding information will be considered part of the offeror’s proposal. Additional proposal documentation will not be considered.

2.1.4 Each page containing proprietary information should be marked:

SOURCE SELECTION INFORMATION--SEE FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

2.2 Volume I – Completed SF 1442 (Solicitation)

The offeror shall submit the SF 1442 with all required fill-ins. Complete blocks #14, #15, #16 (if different than block #14), #17, #20a, #20b, #20c, and block #19, if amendments have been issued. An authorized official of the firm must sign block 20b of the SF 1442. Complete pricing information on all Contract Line Items (CLINs). Complete all appropriate and applicable Representations and Certifications.

2.3 Volume II – Past Performance Fact Sheet

The Offeror shall submit a minimum of three (3) Past Performance Fact Sheets. Information on each Past Performance Fact Sheet shall closely relate to the scope, size and complexity of the proposed work under this solicitation. To demonstrate relevancy, the offeror shall compare the past performance work completed with the work description in the Statement of Work (Attachment 1). In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems, such as cost overruns, extended performance periods, numerous warranty calls, etc. Provide the most current information for the Points of Contact (POCs) identified on the Past Performance Fact Sheets. At least two of the following (in descending order of availability) should be identified as current POCs:

(a) Procuring Contracting Officer/Contract Negotiator or equivalent

(b) Program/Project Manager, or equivalent

(c) Administrative Contracting Officer/Contract Administrator or equivalent

(d) Other (As specified in your Past Performance Fact Sheet)

The Past Performance Fact Sheet information is intended to assist in determining relevancy of a given project and will not, by itself, be evaluated for performance. Any past performance submitted by a subcontractor on behalf of the prime contractor must include a copy of a subcontractor agreement specific to the project.

2.4 Volume III – Bonding: The Offeror shall submit proof of bonding capacity for 100% of the proposal price. To be considered, the contractor must have a letter from an approved surety that states the contractor has a relationship with the company and required bonding capacity has been obtained or will be obtained upon award. Letters must be notarized and signed by someone who can represent the surety.

Letters signed by agents are unacceptable unless accompanied by a Power of Attorney granting proper authority to the agent.

The offeror shall submit the bid bond in this section of the proposal.

List of certified sureties: https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html

2.5 Past Performance Questionnaire (PPQ): The Past Performance Questionnaire (Attachment 7) is a key method used by the Government to obtain past performance information and validate the Past Performance Fact Sheet. Each Past Performance Fact Sheet should have a corresponding PPQ. The offeror shall send out and track the completion of the PPQ with the POCs identified. The responsibility to send out and track the completion of the PPQs rests solely with the offeror. Offerors shall exert their best effort to ensure a PPQ is returned for each Past Performance Fact Sheet submitted. A completed PPQ must be submitted directly to the Government not later than the date and time established in the solicitation for receipt of proposals. Completed PPQs submitted by the offeror will not be accepted nor evaluated.

POCs shall submit their completed PPQs electronically, via email, to:

adelino.cabanting@us.af.mil eddie.pelkey@us.af.mil katrina.pangelinan@us.af.mil

Past Performance evaluation is not limited to review of the information provided in Volume II or PPQs received. The Government reserves the right to review all available past performance information in the integrated assessment.

File details come from the government source that posted it. Updated .