This document contains questions and answers regarding a solicitation for repair work on War Reserve Materiel Storage Building 51104 at Andersen Air Force Base in Guam. The solicitation number is FA524023B0001 and is issued by the Department of the Air Force Pacific Air Forces. The questions and answers clarify details of the scope of work, which involves replacing exterior roll-up doors, installing column and wall bumpers, sealing exterior wall and column joints, concrete infill of roof openings with fluid applied silicone waterproofing, replacing the direct digital control system for new air conditioning units, and connecting it to the base-wide control system. The document specifies that only affected areas should be painted or waterproofed, and a damaged stair is outside the scope of work and should not be replaced.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR WAR RESERVE MATERIEL
STORAGE BUILDING 51104
ANDERSEN AIR FORCE BASE, GUAM
PROJECT NO. AJJY 3-2009
1. Replace existing exterior roll-up doors.
- The material of Roll-up Doors as per Door Schedule sheet A-601 is showing
Aluminum material and details A of Sheet A-601 and B4, C4 & D4 of sheet A- 701 are showing Stainless steel material. Please clarify regarding the roll-up door material and finishes.
- Roll-up door material is aluminum. The detail call-out is a typo error.
2 In sheet A-101 Keyed construction notes no. 4 & 6 says provide column and wall protection bumpers
- Please confirm the required specification of the bumper.
- Check product data A-safe iflexRail column guard+ and single traffic guardrail+ or equivalent.
3 In SOW of architectural no. 9 indicates Sawcut exterior wall and column joints then provide sealant. Paint to match adjacent surface.
- Please confirm if the whole exterior wall should be painted after repairing or only, we should paint the repaired portion.
- Affected or repaired portion only.
4 In SOW of Structural no. 2 says provide concrete infill on roof openings located at warehouse/storage area. Apply 60 mils DFT fluid applied silicone roofing waterproofing.
- During the site visit, we noticed that the existing waterproofing was deteriorated. Please confirm whether we should apply silicone waterproofing only on concrete infilled area or on whole roof area after repairing the cracks.
- Concrete infilled area only.
5 In sheet M-601, the new Direct Digital Control (DDC) system for the new air-conditioning system is connected to the existing JCI DDC control panel.
- Do we need to change the new JCI DDC system for new air-conditioning systems?
- Replace DDC system for new AC units and establish connection with HVAC shop central UMCS station.
6 During the site visit, we noticed that a stair which has access from roof of storage area 1 to roof of storage area 2 is damaged.
- Do we need to change that Stair which is not included in SOW?
- Do not include damage stair/ladder.