Pricing Schedule.xls
XLS spreadsheet 39 KB Posted
- Solicitation number
- FA524009R0018
About this file
Revised pricing schedule w/out quantities
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5240-09-R-0018 Amendment 3.doc | DOC document | |
| IMPORTANT NOTICE 2.doc | DOC document | |
| FA5240-09-R-0018 Amendment 2.doc | DOC document | |
| Water Tank Repair Clarification.doc | DOC document | |
| IMPORTANT NOTICE.doc | DOC document | |
| RFI Responses.doc | DOC document | |
| FA5240-09-R-0018 Amendment 1.doc | DOC document | |
| Pre-proposal Mins.doc | DOC document | |
| FA5240-09-R-0018 - Specifications.zip | ZIP file | |
| FA5240-09-R-0018.pdf | ||
| FA5240-09-R-0018 - Drawings.zip | ZIP file | |
| FA5240-09-R-0018 - Pricing Schedule.zip | ZIP file | |
| Attachment J-1 - Statement of Work- AJJW 07-1144-47 Rpr Water System | — | |
| Attachment J-7 - Guam Labor Rates Effective 7-2008.pdf | ||
| Attachment 5 - Questionnaire Cover Ltr.pdf | ||
| Attachment J-6 - 2007 Annual Precipitation Report.pdf | ||
| Attachment J-7 - Guam Labor Rates Effective 7-2008.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Waterline
| Project AJJW 07-1144 | DATE PREPARED | |||||||||
| COST ESTIMATE | 05/15/09 | SHEET OF | ||||||||
| ACTIVITY AND LOCATION | CONSTRUCTION CONTRACT NO. | IDENTIFICATION NUMBER | ||||||||
| Andersen Air Force Base | ESTIMATED BY: | CATEGORY CODE NUMBER | ||||||||
| PROJECT TITLE | ||||||||||
| Construct ByPass Waterline Sta. Rosa | STATUS OF DESIGN | JOB ORDER NUMBER | ||||||||
| 0 | ||||||||||
| QUANTITY | Material Cost | Labor Cost | Equipment Cost | |||||||
| ITEM DESCRIPTION | Quantity | UNIT | UNIT $ | AMOUNT | UNIT $ | AMOUNT | UNIT $ | AMOUNT | TOTAL | |
| 1. Clearing & Grubbing | $ - 0 | |||||||||
| 2. Excavation to include Bracing | $ - 0 | |||||||||
| 3. Pipe, sand bedding, detectible tape & Valves | $ - 0 | |||||||||
| 4. Backfill | $ - 0 | |||||||||
| 5. 16 x 30" Connection | $ - 0 | |||||||||
| 6. 16 x 16" Connection | $ - 0 | |||||||||
| 7. Chainlink Fence & Gate | $ - 0 | |||||||||
| 8. Connection to the existing transmission lines | $ - 0 | |||||||||
| 9. Disinfection | $ - 0 | |||||||||
| 10. Concrete Valve Box | $ - 0 | |||||||||
| 11. Thrust Block or EB Iron | $ - 0 | |||||||||
| Total Direct Cost | $0.00 | |||||||||
| Contingency | $0.00 | |||||||||
| Sub-Total | $0.00 | |||||||||
| Sub-Contractor's Overhead | $0.00 | |||||||||
| Sub-Total | $0.00 | |||||||||
| Sub-Contractor's Profit | $0.00 | |||||||||
| Sub-Total | $0.00 | |||||||||
| Tax | $0.00 | |||||||||
| TOTAL COST | $0.00 | |||||||||
| $0.00 |
&C&P
LIST ALL THE COST BREAKDOWN PER DISCIPLINE IN EACH LINE ITEM
LIST ALL THE COST BREAKDOWN PER DISCIPLINE IN EACH LINE ITEM
LIST ALL THE COST BREAKDOWN PER DISCIPLINE IN EACH LINE ITEM
LIST ALL THE COST BREAKDOWN PER DISCIPLINE IN EACH LINE ITEM
LIST ALL THE COST BREAKDOWN PER DISCIPLINE IN EACH LINE ITEM
LIST ALL THE COST BREAKDOWN PER DISCIPLINE IN EACH LINE ITEM
File details come from the government source that posted it. Updated .