About this file

This is a response to an inquiry as well as an important notice regarding the outstanding water line drawings.

View the file

Other files

File Type Posted
FA5240-09-R-0018 Amendment 3.doc DOC document
FA5240-09-R-0018 Amendment 2.doc DOC document
Water Tank Repair Clarification.doc DOC document
IMPORTANT NOTICE.doc DOC document
RFI Responses.doc DOC document
FA5240-09-R-0018 Amendment 1.doc DOC document
Pricing Schedule.xls XLS spreadsheet
Pre-proposal Mins.doc DOC document
FA5240-09-R-0018 - Specifications.zip ZIP file
FA5240-09-R-0018.pdf PDF
FA5240-09-R-0018 - Drawings.zip ZIP file
FA5240-09-R-0018 - Pricing Schedule.zip ZIP file
Attachment J-1 - Statement of Work- AJJW 07-1144-47 Rpr Water System —
Attachment J-7 - Guam Labor Rates Effective 7-2008.pdf PDF
Attachment 5 - Questionnaire Cover Ltr.pdf PDF
Attachment J-6 - 2007 Annual Precipitation Report.pdf PDF
Attachment J-7 - Guam Labor Rates Effective 7-2008.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPORTANT NOTICE

We request clarification regarding the Performance period for the four Recovery projects. Are these projects will be issued NTPs simultaneously? If so, then the maximum contract time will be 300 days, right? If this is the case are we required to assign four teams for the site supervision, safety and QC for each location or just 1 team for the whole contract? Please advise as this will be a price factor in the proposal.

Response: Maximum period of performance for all four projects combined will be 300 calendar days, therefore, all 4 projects will be worked on simultaneously. Note: The contractor will have to complete the by-pass before work is iniated on the Santa Rosa water tank. Only 1 team for site supervision, safety, and QC will be required for this contract.

ATTENTION:

CD's with as-built drawings of existing water line from Wells 5-9 to Booster Pump Station No. 3 and from Booster Pump Station No. 3 to Santa Rosa Water Tank are now available. Please stop by the 36th Contracting Squadron, Unit 14040, APO-AP 96543-4040 to get a copy (limit 1 per contractor). Your POC for this request will be A1C Jason C. Kimpel @ 366-1709.

File details come from the government source that posted it. Updated .