This is a Questions and Answers document providing clarifications on design flexibility and performance requirements for deployable shelter systems solicited under Air Force Solicitation FA521526Q0039.

The Government confirms acceptance of alternative designs provided they meet specified performance outcomes. External frame designs with rope-and-pulley hoisting systems are preferred but not mandatory; alternative frame designs are acceptable if they enable deployment and strike by a 5-6 person crew without ladders, scaffolding, or specialized tools, and allow independent frame erection without simultaneously lifting combined frame and fabric weight. The integrated triple-tap electrical harness (120/208 VAC three-phase 60Hz) may be provided as a compatible add-on kit rather than factory-integrated, provided it meets all power specifications and remains housed within the shelter during pack-out. Alternative deployment mechanisms are acceptable when meeting or exceeding stated performance metrics. Minor variations in shelter footprint dimensions are permissible if the system maintains minimum 60.4 square meters (650 sq ft) of unobstructed usable floor space, eave height of 2.06 meters (6 ft 9 in), peak height of 2.77 meters (9 ft 1 in), maximum width of 6.5 meters (21.3 ft), and minimum length of 9.5 meters (31.1 ft), allowing wider but slightly shorter configurations that exceed usable floor space requirements. Offers are due September 14, 2026 at 1700 HST with delivery FOB Destination to JBPH-Hickam, Hawaii. Funds are subject to availability per Federal clause 52.232-18.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional Questions from Industry for Tents:

1. The salient characteristics call for "a rugged, external frame design that allows the fabric to be hoisted into place via an integrated rope and pulley system, without needing to lift the frame and fabric simultaneously." Is this external-frame/rope-and-pulley method a mandatory design requirement, or would the Government consider an alternate frame design that achieves the same functional outcome — a shelter deployable/strikeable by a 5-6 person team without special tools or ladders, and without requiring frame and fabric to be lifted together — to be an acceptable equivalent?

- Yes. While the external-frame and rope-and-pulley hoist design represents the preferred standard, the Government will consider alternative frame designs as technically acceptable equivalents. To be considered an acceptable equivalent, any alternate design must strictly meet the following performance outcomes: (1) The entire system must be deployable and strikable by a crew of 5–6 personnel without the use of ladders, scaffolding, or specialized tools. (2) The design must allow the frame to be safely erected independently of the fabric skin, ensuring the setup crew does not have to lift the combined weight of the frame and fabric simultaneously.

2. The salient characteristics require the shelter to "come standard with an integrated interior electrical wiring harness featuring a triple-tap outlet," supporting 120/208 VAC three-phase 60Hz power, and specify it must remain inside the shelter during takedown and pack-out. Would the Government accept a shelter system where this electrical capability is provided as a compatible add-on kit (rather than factory-integrated into the shelter itself), provided it meets the same functional requirements (voltage/phase support, ECU compatibility, and remaining housed with the shelter during pack-out)?

- Yes. A compatible add-on electrical harness kit is an acceptable equivalent, provided it meets all specified power requirements (120/208 VAC, three-phase, 60Hz with a triple-tap outlet) and is physically capable of being semi-permanently installed inside the shelter frame.

3. Could you also confirm whether an alternative deployment mechanism is acceptable when it meets or exceeds the stated deployment performance, or whether the rope-and-pulley design is a mandatory requirement?

- Yes. Alternative deployment mechanisms are acceptable, provided they meet or exceed the stated deployment metrics. The system must be capable of a complete, safe deployment and strike by a standard 5–6 person crew without ladders, scaffolding, or specialized hand tools.

4. Will Government consider alternatives that provide additional width, and slightly less length, even if they exceed the usable floor space?

- Yes. The Government will consider minor variations in width and length to maximize competition, provided that: (1) The system provides a minimum of 60.4 square meters [650 sq ft] of unobstructed, usable floor space. (2) Clearance heights meet or exceed the minimum eave height of 2.06 meters [6 ft 9 in] and peak height of 2.77 meters [9 ft 1 in]. (3) The altered footprint remains within a maximum width of 6.5 meters [21.3 ft] and a minimum length of 9.5 meters [31.1 ft] to ensure the shelters fit within our designated training footprint.