Appendix A1 2.pdf
PDF 656 KB Posted
- Solicitation number
- FA520922Q0043
About this file
This document includes an appendix and a pre-solicitation notice for a federal contract opportunity. The appendix provides details on inspection and repair work required for indoor swimming pools at Camp Zama in Japan, including locations and sizes of cracks and swelling in pool surfaces to be repaired using fiberglass reinforced plastic lamination. It also specifies replacement of 30 circulation outlets in the main pool and 3 in the baby pool due to deterioration. The pre-solicitation notice seeks offers to provide inspection, maintenance, and repair of the indoor pools at Camp Zama from July 15th to August 31st, 2022. Offerors must be licensed to work in Japan. The agency is the Department of the Air Force Pacific Air Forces. The solicitation number is FA520922Q0043.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice to Offeror LF SIgned.pdf | ||
| Appendix B1 2.ppt | PPT presentation | |
| PWS 2 May 22.pdf | ||
| Gate Pass Form.xlsx | XLSX spreadsheet | |
| Notice to Offeror.pdf | ||
| Appendix A3.pdf | ||
| Solicitation - FA520922Q0043.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A1. Required Maintenance Locations (Points) and Items of Swimming Pool al oG)
01_1
·G) o I I o G)
25000
I 0 0
0 I� 0
0 0 I I 01
I I I
7 I I
I
·i -8_1_ ( )� G) I
- f�) t� -
I I I I
0 0 I I 01
0 0 0 0 0
I
I
I
G)�
I I I
0 o lo 0
. 0
I .Ll.
I -I[ G) -n
I[ u n u
I[ n
_I[ t�
IL u n
G) : +�T I[ , -
�I[ u n
I[ n
I I
�I I u
IL:
0 I TT
0 0 0
0 0 cl 0 0 0
I
.n...p 1..I
.n...l:J 1..I
.n... □- 1..I
.n... Cl_ 1..I
.n... l:J 1..I
1..I Cl -
.n... l:J 1..I
.n...p 1..I
:;,....J
2 5 m Mo.in Pool Inspection Deto.
Do. te : 4-Aug, 2021
Loco. tlon : CAMP ZAMA BLDG205 YAN□ FITNESS CENTER
Inspection : Cro.ck/Swelllng
Loco.tlon Size (MM) Proposed Repc,lr
1 15600•250 Method I
" 400•500 Method 2
., 200•200 Method 2
A 250•300 Method 2 .. 2100•150 Method I
,:_ 700•300 Method I
"7 100•100 Method 2
" 250•100 Method 2 " 100•100 Method 2
1n 100•100 Method 2
•For details on repair Methods, see '4,Proposo.l of repair Method', Loco.o. tlon Descrlotlon
AllE30 Clrculo.tlon outlet Deterloro.tlon:
Po.eking Surfo.ce Coo. ting
Proposed Repo.lr
Clrculo.tlon outlet replo.ceMent
Caulking o.ppllco. tlon
Baby Pool Inspection Deto.
Do. te : 4-Aug, 2021
Loco. tion : CAMP ZAMA BLDG205 YAN□ FITNESS CENTER Inspection : Cro.ck/Swelllng
Loco.tlon Slze(MM) Proposed RepQII
3600X1000 Method 3
•For deto.lls on repair Methods, see '4,Proposo.l of repo.lr Methool', Inspection Dlfects, Location Description
AllE3 Clrculo.tlon outlet Deterloro.tlon:
Po.eking Surfo.ce Coo. ting Clrculo. tlon outlet replo.ceMent
Caulking o.pplico. tion
Construction procedure: 1.Sanding →2.Degreasing → 3.Resin coating, glass mat first layer
→4.Resin coating, glass mat 2nd layer →5.Sanding before application
→6.Color paste application
Repair method ② 25m pool (repair locations 2~4、7~10)
Construction procedure: 1.Sanding →2.Degreasing → 3.Resin coating, glass mat product
(the number of glass mat layers determined to reduce surface finish irregularities)
→4.Sanding before application →5.Color paste application
Repair method ③ Baby pool: Side unit (repair part 1)
Construction procedure: 1.Sanding →2.Degreasing → 3.Resin coating, glass mat first layer
→4.Resin coating, glass mat 2nd layer →5.Sanding before application
→6.Color paste application →7.Sharpening → 8.Gel coat spraying
→9.After spraying water sharpening →10.Repair surface buffing
Because of the structure of the pipes, valve sockets, valves, etc. are inserted in the existing pipes& they cannot be reused. Replacement of the entire PVC pipes and heat insulating material is required.
Appendix A2 Proposed Maintenance & Repair Work
.1. SWIMMING POOL TANK SWELLING etc. REPAIR (25m pool & Pool for Infants):FRP lamination repair method
Repair method ① 25m pool (repair locations 1,5,6)
2. CIRCULATION OUTLET REPLACEMENT
Filtering circulation outlets need to be replaced due to deterioration.
Existing Circulation Outlet Deterioration:Surface protective coating・Packing
Replacement :SUS circulation outlets・Packing
Main Pool: 30 ea.・IBaby Pool 3 ea.
The circulation outlets are fixed to the pool body and are integrated with PVC drainage pipes.
Therefore, replacement of circulation outlets and packing only is not possible. To perform the repair, PVC drainage pipes need to be cut, removed, and reconnected in the pool pit.
Lining pipes are installed up to the filtration system, and then replaced by PVC penetrating pipes.
The repair involves replacement of PVC pipes.
kazuhiro.fukui Cross-Out