Amend Atch 1 PWS.pdf

PDF 3 MB Posted

Attached to
FY22 Sidetrack Roadbed Maintenance at Yokota Air Base
Solicitation number
FA520921Q0096
Issued by

About this file

This performance work statement solicits maintenance services for a sidetrack roadbed at Yokota Air Base in Japan. The contractor shall provide personnel, equipment, materials, and supervision to perform maintenance and repairs to the sidetrack, including repair of trackage, switching devices, cleaning of railroad crossings, weeding, and emergency repairs. Work shall be conducted in accordance with Japan Freight Railway Company rules and regulations. The performance period is from contract award through September 2022. The solicitation includes appendices outlining estimated workloads, inspection schedules, drawings, replacement part lists, and herbicide approvals. Offerors must be licensed to work in Japan and site visits are scheduled. The offer due date is in Japan Standard Time and any emails must reference the solicitation number.

View the file

Other files

File Type Posted
Question and Answer.pdf PDF
QA Atch Switching Device List.pdf PDF
FA520921Q00960001.pdf PDF
Atch 1_PWS Roadbed FY22 Beta SAM.pdf PDF
Policies Procedures with U.S. Government.pdf PDF
FA520921Q0096.pdf PDF
Notice To Offeror.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

FY22 SIDETRACK ROADBED MAINTENANCE

AT

U.S. GOVERNMENT SIDETRACK NO. 328

YOKOTA AIR BASE

16 September 2021

The attached PWS is being provided in accordance with (IAW) Section 801, 10 USC 2330. Any contract or task order resulting from this request is to be acquired using performance-based principles.

Attachment 1 to Solicitation No. FA520921Q00960001

1. DESCRIPTION OF SERVICES/GENERAL INFORMATION. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and services necessary to perform maintenance and repairs to the sidetrack roadbed portion of U.S. Government Sidetrack No. 328, Yokota Air Base, in a manner that will ensure continuous and reliable railroad operational condition. The performance period shall be from the effective date in block 3 of Standard Form (SF) 1449 through 30 September 2022.

1.1. MAINTENANCE AND REPAIR SERVICES. The maintenance and repair services shall be in accordance with (IAW) the Japan Freight Railway Company’s (JFRC) rules and regulations as specified in the Agreement between the United States of America and JFRC for handling military sidetracks, dated

01 Apr 1987, paragraphs 2, 4, 6 and its first Supplementary Agreement dated 13 July 1987, paragraph 5 entitled “Maintenance”, and the second Supplementary Agreement dated 16 March 1988, subparagraphs

5.e and 5.f. All construction debris or waste generated from this Purchase Order shall be removed IAW all Japanese laws and regulations, Japan Environmental Governing Standards (JEGS), commercial practices, and local standards.

1.2. The Contractor shall perform maintenance and repairs to the sidetrack roadbed portion of U.S.

Government Sidetrack No. 328, Yokota Air Base, as identified in Appendices A through H to ensure reliable and continuous operation. The work shall include but is not limited to:

(a) Contract Line Item Number (CLIN) 0001: Repair of Track age IAW Appendices.

(b) CLIN 0002: Repair of Switching Device IAW Appendices.

(c) CLIN 0003: Cleaning of Railroad Crossing IAW Appendices.

(d) CLIN 0004: Weeding IAW Appendices.

(e) CLIN 0005: Others IAW Appendices.

(f) CLIN 0006: Emergency Repair IAW Paragraph 1.3.

1.3. EMERGENCY REPAIR. In the event that action is required to correct a safety issue or protect lives and properties, the Contracting Officer (KO) or Subject Matter Expert (SME) with concurrence of KO may verbally instruct the Contractor to proceed with emergency repairs by issuance of a supplemental agreement pursuant to FAR 52.212-4, Contract Terms and Conditions - Commercial

Items in this contract. All repair work shall be IAW the JFRC’s rules and regulations.

1.4. JFRC’S INITIAL INSPECTION. After completion of the Contractor’s scheduled work cited in the contract, initial inspection shall be performed by JFRC prior to inspection by the Government IAW paragraph 5.c. and 5.d. of the Agreement between the United States of America and JFRC for Handling

Military Sidetracks. Inspection of services will be accomplished by the designated SME based on the

JFRC’s certification of inspection.

1.5. INTERFERENCE WITH GOVERNMENT OPERATIONS. The Contractor shall make every effort to schedule its maintenance activities so as not to interfere with U.S. Government operations. In the event such interference is necessary, the Contractor shall provide the SME with a minimum of five (5) working days advance notification of the proposed work

1.6. WASTE DISPOSAL

1.6.1. Every effort shall be made to use recycling and/or reuse (diversion) measures to reduce the amount of waste generated under the Purchase Order. Waste minimization and disposal plan shall be included in the Environmental Protection Plan (EPP), which can be prepared by the Contractor in their format as long as it satisfies the applicable requirements at Environmental Protection (Appendix J) and submitted to the

Environmental Office through 374 CES/CEIE prior to performance of the scheduled work. In addition, a copy of contract(s) for waste transportation and disposal, and permits issued from local governments shall be submitted with the AF Form 3000 to CE Environmental (374 CES/CEIE) separate from the EPP. The plan also needs to list waste that will be generated from the Purchase Order and how they are treated

(recycled/incinerated/landfilled). After the disposal, waste manifests shall be submitted to 374 CES/CEIE along with recycling report that shows the amount of waste recycled/incinerated/landfilled.

1.6.2. Solid and Construction/Maintenance Waste: Solid waste shall be placed in containers which are emptied on a regular schedule. Likewise, debris will be placed in appropriate containers or vehicle equipment for proper handling and disposal. Handling and disposal shall be conducted to prevent contamination. Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste. The Contractor shall transport solid waste to include debris off government property and dispose of it in compliance with applicable federal and local requirements for solid or construction waste disposal. In addition, the Contractor shall comply with Japanese local laws and regulations pertaining to the use of landfill areas. At a minimum, the following items will be recycled:

scrap metal, cardboard, concrete, asphalt, scrap wood, wooden pallets, glass, and plastic. Green wastes such as leaves, trees, and branches should be mulched or composted. With the 374 CES’s or KO’s approval, green waste may be transported and dropped off to the Civil Engineer yard near Building 4072 to be processed for mulching. Note: Green waste does not include wooden railroad ties.

1.6.3. Hazardous Waste (HW): All HW generated by the Contractor shall be disposed/recycled off base IAW Japanese regulation, Article 3 of “Law of Disposal and Cleansing of Waste (Haikibutsu no shori oyobi seisou ni kansuru horitsu)” and local regulations. Polychlorinated Biphenyl (PCB) containing items, fluorescent light bulbs, and any hazardous waste that meets criteria of JEGS Chapter 6 generating from existing U.S. properties must be turned in to 374 CES/CEIE for disposal or recycled. The

Contractor shall not leave any hazardous waste at work site areas at the end of duty hours. If temporary hazardous waste storage is needed to accumulate hazardous waste on base, the Contractor shall submit spill response plan with site map, the list of all hazardous waste to be stored on-base and estimated quantities to 374 CES/CEIE, CE Fire Inspection (374 CES/CEF), Bioenvironmental (374 AMDS/SGPB), and Safety (374 AW/SE) for approval.

1.6.4. Burning: Open burning is prohibited for the purpose of reducing waste.

1.7. HAZARDOUS MATERIALS

1.7.1. Approval is required before bringing any hazardous materials (HAZMAT, refer to AFI 32-7086) onto the installation. The Contractor seeking approval to bring HAZMAT onto the installation must submit the AF Form 3000 along with Safety Data Sheet/Material Safety Data Sheet (SDS/MSDS) in

English and Japanese. The Contractor is also required to provide the estimated amount of HAZMAT to be used during the project. If the HAZMAT is suspected to contain lead or asbestos, such as paint, primer, and caulking, a certificate from the manufacturer shall be provided to prove that the HAZMAT is free of asbestos/lead. The AF Form 3000 package will be reviewed by 374 AMDS/SGPB, 374 AW/SE, and 374 CES/CEIE. The Contractor shall use non-hazardous chemicals when available. All excess materials and empty containers are the responsibility of the Contractor and shall be removed at the end of the contract. When the occupants of the facility request the Contractor leave the excess HAZMAT, the

Contractor shall coordinate with and be approved by 374 CES/CEIE.

1.7.2. Approval of Herbicide. A PACAF-approved listing of approved herbicide is located within

Appendix G. If the Contractor wishes to utilize herbicide other than the approved herbicide, the

Contractor shall coordinate with the SME first. All herbicides must be reviewed and approved by 374

CES/CEIE, 374 AMDS/SGPB, 374 AW/SE, and the Civil Engineer Entomology Shop (374

CES/CEOIE).

1.7.3. Application and Control of Herbicide. The application of herbicide shall be conducted IAW the manufacturer’s instructions. The Contractor shall possess the spill control materials on hand at all times to contain/absorb worst case spill, both by volume and hazard level. The Government will inspect each application. The Contractor shall not store or dispose any herbicide including its empty containers on the

Government’s installation.

1.7.4. Monthly Reports. The Contractor shall submit a report to the KO within ten (10) working days with AF Form 3000 following each month listing all pesticide and herbicide applications. Include pesticide/herbicide name, use concentration, amount applied, date, and detailed location of use. A DD

Form 1532 will be provided on request to facilitate record keeping.

1.7.5. For the pesticide/herbicide management, the personnel certified as a Pesticide Management

Instructor (Nouyaku Kanri Shidoushi 農薬管理指導士) or equivalent shall be on site to supervise the workers. The Contractor is subject to inspection by DOD certified applicators/inspectors as well as State

Department of Agriculture Pesticides Division or equivalent agency.

1.7.6. Hazardous Materials Inventory. The Contractor shall maintain an up-to-date hazardous material inventory with copies of SDS(s)/MSDS(s) for all materials used on the job site. The Contractor shall maintain a complete copy of all approved SDS(s)/MSDS(s).

1.7.7. Hazardous Materials Management. The Contractor shall remove all hazardous materials by the end of each workday. The Contractor shall not conduct process treatments (e.g., paint thinner solvent recycling) on base.

1.7.8. Storage. All containers of HAZMAT in the work place should be labeled, tagged, or marked in both English and Japanese with the identity of the products. The Contractor shall ensure adequate handling and storage IAW JEGS where the HAZMAT is stored. Storage of oils, greases, chemicals, fuels, or other liquids will require spill prevention and security. The Contractor is not allowed to store

HAZMAT on base for over 24 hours without authorization. If on-base HAZMAT storage areas are needed, the Contractor shall submit the list of all items that are to be stored on-base and estimated quantities to 374 CES/CEIE, 374 CES/CEF, and 374 AW/SE for approval. Hazardous materials storage areas may be inspected by 374 CES/CEIE, 374 CES/CEF, and 374 AW/SE. SDS(s)/MSDS(s) must be available at storage and on site at all times.

1.7.9. Final Report. The Contractor shall submit a final inventory, not later than ten (10) working days following termination/completion of this Purchase Order, of all hazardous materials used since the last hazardous usage report to the KO or SME. The final inventory will list all hazardous materials used, total amount of each used, and a description of the disposition of any remaining hazardous materials.

1.8. HUMANITARIAN ASSISTANCE AND DISASTER RELIEF (HADR). The scope of this

Purchase Order includes services to respond to requirements in an emergency environment including humanitarian assistance and disaster relief.

1.9. GENERAL INFORMATION.

1.9.1. Quality Assurance. The Government will evaluate all of the Contractor’s performance IAW the

Quality Assurance Surveillance Plan (QASP) by appointing SME to monitor performance to ensure services are received.

1.9.2. Government Remedies. The KO will follow FAR 52.212-4, Contract Terms and Conditions -

Commercial Items for the Contractor’s failure to perform satisfactory services or failure to correct non- conforming services.

1.9.3. Contractor Personnel.

1.9.3.1. Contract Manager (CM). The Contractor shall provide a CM who shall be responsible for the performance of the work. The name of this person, and an alternate or alternates who shall act for the

Contractor when the manager is absent, shall be designated in writing to the KO within ten (10) days after award. The CM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this Purchase Order and shall be individuals who are capable of conversing in, and comprehending English.

1.9.3.2. Contract Employees. Contractor personnel shall be easily recognizable as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the Contractor’s company name and the employee’s name.

1.9.3.3. Removal of Contractor’s Employees. The Contractor shall utilize only experienced, responsible, and capable employees in the performance of this contract. The KO may require that the

Contractor remove from the Government job any of his/her employees who endanger persons or properties, or whose continued employment under this contract is inconsistent with the interests of military security.

1.9.3.4. Other Country Nationals (OCN). The Security Forces on each base controls entry to the base.

Under certain circumstances, the OCN might be denied entry. It is the Contractor’s responsibility to coordinate with the Security Forces at each base when there is a question about particular circumstances.

1.9.4. Subcontracting. The subcontractors shall meet the standards required by this contract to perform the service. The prime Contractor is responsible for the performance of the subcontractors.

1.9.5. Installation Base Passes. For access to U.S. Installations, the U.S. Government will issue all required Gate Passes/Vehicle Passes to contractor personnel at no cost to the Contractor. To obtain passes, the Contractor is required to submit documents IAW each installation instruction. The prime

Contractor shall be responsible for all passes issued to his/her own or his/her subcontractor’s employees under this contract. The Contractor shall return all applicable passes upon termination of employment or completion of this contract to the Installation Pass Office.

1.9.5.1. Gate Passes. In order to obtain Gate Passes, the Contractor may be required to (i) submit certificates of residence, abstracts of family registers and an ID photo, in addition to application forms which could vary depending on each installation, and (ii) make appointments at the Installation Pass

Offices to take ID photos and pick up issued passes. The Contractor is responsible for the expenses and costs that they would incur in order to obtain Gate Passes.

1.9.5.2. Vehicle Passes. In order to obtain Vehicle Passes, the Contractor shall submit the proof of valid liability insurance that must cover the automobile liability insurance in the types and minimum amounts of (i) Bodily Injury - ¥30,000,000 per person per occurrence, in addition to the Japanese Compulsory

Insurance (JCI), and (ii) Property Damage - ¥3,000,000 per occurrence.

1.9.6. Hours of Operation.

1.9.6.1. Work Hours. Contractor work hours are from 0730 to 1630 Monday through Friday including

Japanese holidays, but excluding U.S. legal holidays. Note: The U.S. Government may require night time work off base. The Contractor shall notify the KO or SME in advance of the night time work.

1.9.6.2. U.S. Legal Holidays. Recognized U.S. legal holidays are listed below. Holiday falling on a

Saturday may be observed on the preceding Friday. Holidays falling on a Sunday may be observed on the following Monday.

DATE HOLIDAY

1st January New Year’s Day 3rd Monday in January Martin Luther King’s Birthday

3rd Monday in February President’s Day

Last Monday in May Memorial Day

19th June Juneteenth Day

4th July Independence Day

1st Monday in September Labor Day 2nd Monday in October Columbus Day

11th November Veteran’s Day

4th Thursday in November Thanksgiving Day 25th December Christmas Day

1.9.7. Reports of Damages, Destruction, Injury, or Death.

1.9.7.1. The Contractor shall report all incidents of damage or destruction to property, or personal injury or death to any person, arising out of and during the performance of this contract. For the purposes of this clause, the term “property” includes equipment or property of any type, whether Government owned or not. The term “Contractor” includes the Contractor, its agents, servants, or employees.

1.9.7.2. The Contractor shall submit these reports to the KO through the SME as follows:

1.9.7.2.1. A preliminary report to the KO shall be made as soon as practicable after the time the incident occurs. Report may be either verbal, facsimile or other electrical means.

1.9.7.2.2. A complete written report shall be submitted within 96 hours after occurrence of the incident.

A copy of this report shall be furnished to the KO.

2. SERVICES SUMMARY (SS).

The following SS identifies the performance objectives and performance thresholds for critical tasks associated with providing support services for this requirement. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

PWS

Para

Performance

Threshold

Method of

Assessment

SS# 1: Repair and Maintain Sidetrack

Roadbed Portion

a. Repair of Trackage

b. Repair of Switching Device

c. Cleaning of work

d. Weeding

e. Others f.

IAW the JFRC’s rules and regulations.

1.1. – 1.2.

Zero (0) defect

100% Inspection

SS# 2: Emergency Repair

Ensure reliable and continuous condition

IAW the JFRC’s rules and regulations.

1.3.

Zero (0) defect

100% Inspection

3. GOVERNMENT-FURNISHED PROPERTIES AND SERVICES.

3.1. Utilities. Water, electricity, and sewage, where available from existing work sites, will be provided to the Contractor without cost.

3.2. Security Forces and Emergency Contact Numbers. Upon request for assistance, the following units will provide services on a contractor refundable bases as necessary: the Base Security Forces, the

Base Fire Department, and the Base Emergency Phone Number.

Base Security Forces Telephone 911 (042-507-6560)

Base Fire Department Telephone 911 (042-507-6560)

Base Emergency Telephone 911 (042-507-6560)

4. APPENDICES.

A. Estimated Workload

B. Estimated Schedule of Inspection by JFRC

C. List of Repair and Maintenance Work

D. U.S. Military Sidetrack Drawings

E. Replacement List of Ties

F. Weeding Area

G. Approved Herbicide

H. Replacement Plan of Derailment Prevention Guard

I. AF IMT 3000

J. Environmental Protection 2019

APPENDIX A: ESTIMATED WORKLOAD

Unit Quantities

A. Repair of Trackage

a. Replacement of Steel Tie Job 34

b. Remove and Restore of Fuel Pan c

Place 1

c. Replacement of Regular Tie Job 21

d. Replacement of brace Job 2

e. Replacement of ballast

Square Meters (m²) 31

B. Repair of Switching Device

a. Replacement of Switching Device Tie (Day time) Job 3

b. Replacement of Switching Device Tie (Night time) Job 3

c. Replacement of Switching Device rail (Night time) Set 1

d. Replacement of Switching Device ballast Set 1

e. Lubrication of switching device Set 7

C. Cleaning Work

a. Cleaning of precast restressed crossing (Night Shift) Place 3

b. Cleaning of Switching Device Set 5

D. Weeding

a. Chemical Weed Control m² 34,496

b. Weeding m² 5,224.8 (870.8 m2 x 6 times)

E. Others

a. Tree pruning

b. Cutting of Trees

Job Job

APPENDIX B: ESTIMATED SCHEDULE OF INSPECTION BY JFRC

施設関係 2022年度分 米軍横田・年間検査計画表

Service 数 量 単 位 2021 2022 記 事

Qty Unit Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Articl

1 軌 道 変 位 検 査(一般区間)

Job

1unit per job TRACK IRREGULARITY

2 軌 道 変 位 検 査(分岐器)

Set

1set per job TRACK IRREGULARITY

SWITCH DEVICE

3 分 岐 器 一 般 ・ 機 能 検 査

1set per job FUNCTION INSPECTION OF

4 分 岐 器 細 密 検 査

DETAIL INSPECTION OF

5 レール 検 査

1unit per job RAIL

6 道 床 検 査

1unit per job BALLAST

7 ま く ら ぎ 検 査(一般区間)

1unit per job REGULAR TIE

8 ま く ら ぎ 検 査(分岐器)

1set per job SWITCH DEVICE TIE

9 そ の 他 材 料 検 査

1unit per job OTHER MATERIALS

10 巡 回 検 査

1unit per job SAFETY PATROLLING SERVICE

11 し ゅ ん 功 検 査

CONPLETION

12 調 査 ( 次 年 度 査 定 )

1unit per job INVESTIGATION

★=軌道会社(No.1~9) Track company(No.1~9) ★=東京メンテナンスステーション(No.10~12) Tokyo Maintenance station(No.10~12)

*在日米軍との契約上の関係、及び、JR貨物側、及び、軌道会社の作業上の都合により、予定を変更すること

もある。

The inspection schedule will be subject to change,depending on the contructual relationships made by US military and Japan Freight

Railway, or process of works of track company.

*請負業者は検査終了毎に東京メンテナンスステーションに連絡し、近日中にデータを入力すること.(又は、OA送信でも可とする.)

Contractors must inform Tokyo Maintenance station about the results every inspection,and enter data in a few days.(or carry data)

*大工事終了時、及び、工事進行状況により、竣工検査を追加、削除したり、検査予定月を変更する場合もある。

It may well be that the completion inspection perform or cancel,and due month reschedules, depending on the construction progress and on completion of large scale work.

APPENDIX C: LIST OF REPAIR AND MAINTENANCE WORK

2022年度 在日米軍横田基地専用線(No.328)

US Military Siding Yokota (No.328), 2022

【 保守工事数量表 】 No.1

List of Repair and Maintenance Work No.1

番号 工 事 種 別 単位 数 量 摘 要

No. Description Unit Quantity Remarks

Repair o f trackage

鉄まくらぎ交換 本 ※別紙略図参照 【設計確認必要】

Replacement of steel tie Job ※ Refer to sketch on the attached sheet. 【Design validation is needed】

燃料漏油処理板仮撤去復旧 箇所 7番線1箇所(鉄まくらぎ交換) ※別紙略図参照

Remove and restore of fuel pan Place Track No.7 = 1 place. (Replacement of steel tie)

※ Refer to sketch on the attached sheet.

並まくらぎ交換 本 ※別紙略図参照

Replacement of regular tie Job ※ Refer to sketch on the attached sheet.

チョック交換 個 ※別紙略図参照

Replacement of brace Job ※ Refer to sketch on the attached sheet.

道床交換 m 17番線 0k929m~0k960m

まくらぎ端部から 400mm(全幅2900mm) , まくらぎ下面から150mm(全高290mm)

Replacement of ballast m Track No.17 0k929m~0k960m

400 mm from the edge of tie (Width 2900 mm), 150 mm from the bottom surface (Height 290 mm).

Repair o f switching device

分岐まくらぎ交換(昼間) 本

Replacement of switching Job ヨ5号 220×1本 ヨ11号 220×1本 370×1本 device tie (Day time) YO5 = 220 × 1 Job. YO11 = 220 × 1 Job, 370 × 1 Job.

分岐まくらぎ交換(夜間) 本

Replacement of switching Job 310ロ号 400×1本 312イ号 250×2本 device tie (Night time) 310RO = 400 × 1 Job, 312I = 250 × 2 Jobs.

312イ号 左基本レール・左トングレール・左リードレール交換(付属品含む)

分岐器部分交換(夜間) 分岐器転換調整含む ※別紙略図参照

Replacement of switching 組 312I Basic rail (left), Tongue rail (left), Lead rail (left) replacement device rail (Night time) Set (Including accessories) Including branching adjustment

※ Refer to sketch on the attached sheet.

分岐器道床交換

Replacement of switching 組 ヨ11号 device ballast Set YO11

ポイント部注油作業 組 2回/年=310ロ、312イ、ヨ5、ヨ8、ヨ9、ヨ15、ヨ16

Lubrication of switching device Set Twice a year = 310RO, 312I, YO5, YO8, YO9, YO15, YO16

Cleaning work

横田5号踏切=4回/年、横田1号踏切=2回/年、横田2号踏切=2回/年

輪縁路清掃(夜間) ※踏切清掃時に、周囲に投棄された廃棄物も処分すること。

Cleaning of precast prestressed 箇所 Yo ko ta No .5 R.C. = fo ur times a year, Yo ko ta No .1 R.C. = twice a year, crossing (Night time) Place Yokota No.2 R.C. = twice a year

※ At the time of crossing cleaning, also to dispose of the refuse abandoned around.

ポイント部枯葉除去 組 1回/年=ヨ5号、ヨ6号、ヨ7号、ヨ8号、ヨ9号(12月~3月頃の間にて実施)

Cleaning of switching device Set Annual = YO5、YO6、YO7、YO8、YO9

(Carried out between December and March)

2022年度 在日米軍横田基地専用線(No.328)

US Military Siding Yokota (No.328), 2022

【 保守工事数量表 】 No.2-止

List of Repair and Maintenance Work No.2 last

番号 工 事 種 別 単位 数 量 摘 要

No. Description Unit Quantity Remarks

4 除草作業

Weeding

34,496

引込3番線 0k300m~0k908m(レールゲート)まで(3,648㎡)

燃料基地内及び7番線、8番線、9番線の終点方含む(13,600㎡)

17,248 × 2回/年 幅6mにて施工

※別紙求積表参照

Industrial track No.3 between 0k300m and 0k908m (Rail gate) (3,648 )

On base and the terminal point of No.7, No.8, and No.9 (13,600 )

除草薬散布 17,248 × Twice a year Construct width 6m

Chemical weed control ※ Refer to breakdown list on the quadrature table.

5,224.8

燃料基地内:年6回 9番線(左側)=870.8㎡ × 6 = 5,224.8㎡

除草作業 ※別紙求積表参照

Weeding On fuel base: six times a year Track No.9 (Left side)

=870.8㎡ × 6 = 5,224.8㎡

※ Refer to breakdown list on the quadrature table.

5 その他

Others

樹木伐採作業 本

横田引上線付近(西武線側)=1本

Cutting of trees Job Yokota lead track (Seibu rail way side) =1job

樹木剪定作業 式

横田5号RC付近(右側)=1式

Tree pruning Set Yokota No.5 R.C. (Right side) =1set

APPENDIX D: US MILITARY SIDETRACK DRAWINGS

Replacement of steel tie 4jobs (B= 4)

Replacement of steel tie 3jobs (B= 3)

Replacement of regular tie 3jobs

Replacement of switching device tie 1job (220×1 ,370×1)

Replacement of switching device tie 1job (220×1)

Replacement of switching device device ballast 1set

13号RC

ヨ16

9番 No.9 12号RC

8番 No.8 ヨ15

ヨ9

18番 No.18 7番 No.7

9号RC ヨ8

ヨ24 17番 No.17 ヨ11 ヨ5 ヨ6 ヨ7 6番 No.6 ヨ14 11号RC

16番 No.16 5番 No.5 ヨ12

ヨ23 8号RC ヨ10 ヨ13

4番 No.4 10号RC

7号RC

Replacement of regular tie 7jobs

Replacement of brace 2jobs 横田6号RC

Yokota No.6 RC

Tree pruning 1set.

Replacement of ballast 31m 横田5号RC(砂川街道)

Yokota No.5 RC (Sunagawa HW) Replacement of steel tie 4jobs (A= 3、B= 1) Replacement of steel tie 7jobs (A= 7)

Replacement of regular tie 10jobs.

Replacement of regular tie 1jobs

Replacement of steel tie 16jobs (A= 10, B= 6)

横田4号RC Remove and restore of fuel pan 1place

Yokota No.4 RC Newly established tie-plate (type F) 12sets (0k304m ~ 0k415m) Derailment prevention guard installation location regular tie 6 jobs.

横田3号RC

Yokota No.3 RC

Replacement of switching device tie 2jobs (250×2)

(ヨ5号、ヨ6号、ヨ7号、ヨ8号、ヨ9号)

横田2号RC (YO5GO, YO6GO, YO7GO, YO8GO, YO9GO)

Yokota No.2 RC

Replacement of switching device tie 1job (400×1)

横田1号RC (310ロ、312イ、ヨ5、ヨ8、ヨ9、ヨ15、ヨ16)

Yokota No.1 RC (310RO, 312I, YO5, YO8, YO9, YO15, YO16)

DC

道床交換 31m

2022年度 米軍横田専用線保守工事指示書位置略図 US Military Siding at Yokota Base Maintenance Instruction, 2022

2022年度 交換まくらぎ塗色(白色) 2022 Replacement of tie paint (White)

線ばねA

Spring clip A A

線ばねB

Spring clip B B 燃料基地内除草作業(処分含む) 5,224.8㎡ (年6回)

鉄まくらぎ交換

Replacement of steel tie

(No.9 left side = 870.8㎡) ※Refer to breakdown list on the quadrature table.

鉄まくらぎ交換 4本(B= 4本)

並まくらぎ交換

Replacement of regular tie

分岐まくらぎ交換

Replacement of switching device tie

現地にてまくらぎ寸法記載

Dimensioning of tie

木 Wood

Cleaning of precast prestressed crossing (Night time) , Twice a year

横田2号 Yokota No.2 RC

輪縁路清掃(夜間) 年2回

※踏切清掃時に、周囲に投棄された廃棄物も処分すること。

並まくらぎ交換 7本

チョック交換 2個

ヨ11号 YO11

分岐まくらぎ交換 1本(220×1、370×1【内10、後1】)

分岐器道床交換 1組

レールゲート

Rail gate

17番線 No.17

ヨ22

横田5号 Yokota No.5 RC

輪縁路清掃(夜間) 年4回

※踏切清掃時に、周囲に投棄された廃棄物も処分すること。

Cleaniing of precast prestressed crossing (Night time) , Four times a year

※ At the time of crossing cleaning, also to dispose of the refuse abandoned around.

分岐まくらぎ交換 1本(400×1【後8】)

その他作業 Other works

鉄まくらぎ交換 16本(A=10本、B=6本)

分岐まくらぎ交換 2本(250×2【内21、22】)

310ロ号 310RO

・ポイント部枯葉除去 5組 【年1回=12月から3月の間】 ・Cleaning of switching device 5sets (Annual = Carried out between January and March)

F型タイプレート新設 12組(0k304m~0k415m)脱線防止ガード設置箇所の並まくらぎ交換6本分

・ポイント部注油作業 7組 (年2回) ・Lubrication of switching device 7sets (Twice a year)

312イ号 312I

燃料漏油処理板撤去復旧 1箇所

鉄まくらぎ交換 7本(A= 7本)

7番線 No.7

並まくらぎ交換 10本

引込3番線(ゲート外) Industrial track No.3 (Off base)

樹木剪定作業 1式

引込3番線(ゲート内) Industrial track No.3 (On base)

8番線 No.8

並まくらぎ交換 1本

並まくらぎ交換 3本

鉄まくらぎ交換 3本(B= 3本)

9番線 No.9 (9番線左側付近 = 870.8㎡) ※別紙求積略図参照

ヨ5号 YO5

Weeding on fuel base (Disposal is included) 5,224.8㎡ (Six times a year)

分岐まくらぎ交換 1本(220×1【内11】)

鉄まくらぎ交換 4本 (A=3本,B=1本)

・除草薬散布 34,496㎡ 【17,248㎡x年2回】 ・Chemical weed control 34,496(17,248㎡ × Twice a year)

(燃料基地内、及び、7番線、8番線、9番線の終点方を含む 13,600㎡) (On base and the terminal point of No.7, No.8, and No.9 13,600㎡)

輪縁路清掃 年2回

※踏切清掃時に、周囲に投棄された廃棄物も処分すること。

452 312 I 310 I

JR貨物 JR東日本

(Industrial track No.3 between 0k300m and 0k908m construct width 6m 3,648㎡)

樹木伐採 1本

(引込3番線 0k300m~0k908m 幅6m 3,648㎡ )

Cutting of tree 1job.

※ At the time of crossing cleaning, also to dispose of the refuse abandoned around.

122イ,ロ

JR EAST

118RO

横田1号 Yokota No.1 RC

312RO

JR東日本 専用線 122 I ,RO

310イ

JR EAST Private siding 312ロ 310ロ

Private siding JR Freight

310RO

312イ

※ At the time of crossing cleaning, also to dispose of the refuse abandoned around.

専用線 JR貨物

Cleaning of precast prestressed crossing (Night time) , Twice a year

118ロ 453 JR Freight

拝島構内分岐在日米軍横田専用線 US Military Siding at Yokota Base, Siding

西武鉄道

Se ibu rail way

横田引上線

Yokota lead track

八高線 JR Hachikou line

八王子方 Hachiouji

横田専用1番

Exclusive Yokota No.1

横田専用2番

Exclusive Yokota No.2

No.7 RC

No.8 RCYO23

YO24

YO22 YO11

No.9 RC

YO5 YO6 YO7

YO10

YO8

YO9

YO13

YO12

YO14

YO15

YO16

No.10 RC

No.11 RC

No.12 RC

No.13 RC

APPENDIX E: REPLACEMENT LIST OF TIES

拝島駅構内 312イ号分岐器部分交換計画図 312I Replacement of switching device rail plan drawing

左基本レール・左トングレール・左リードレール交換(付属品含む) 分岐器種別 T40N振右共-1 8# (3:2) トングレール形式 PD40N 1-3 8#(3:2) 312I Basic rail (Left), Tongue rail (Left), Lead rail (Left) replacement Switching device type T40N "振右共-1" 8# (3:2) Tongue rail format PD40N 1-3 8# (3:2)

左基本レール Basic rail (left)

左トングレール 左リードレール Tongue rail (left) Lead rail (left)

APPENDIX F: WEEDING AREA

APPENDIX G: APPROVED HERBICIDES

ARMED FORCES PEST MANAGEMENT BOARD (AFPMB) STANDARD PESTICIDES

NSN 6840- Item Name (Alternative Trade Name) Unit Package UOI

01-360-4741 Fungicide, Methylisothiocyanate, 97%

(MITC-FUME)

***RESTRICTED USE PESTICIDE***

18 tubes CO

01-457-6588 Fungicide, Azoxystrobin, 50%

(Heritage)

(6) 1 lb cont. BX

01-643-0704 Herbicide Aminocyclopyrachlor, 39.5% and Chlorsulfuron, 15.8% (Perspective)

(12) 1.25 lb bt BX

01-643-0697 Herbicide Aminocyclopyrachlor, 39.5% and Metsulfuron methyl, 12.6%

(Streamline)

(8) 3 lb bt BX

01-643-0702 Herbicide Aminocyclopyrachlor, 22.8%;

Metsulfuron methyl, 7.3% and

Imazapyr 31.6% (Viewpoint)

(8) 5 lb bt BX

01-561-9603 Herbicide, Aminopyralid, 40.6%

(Milestone )

(2) 2.5 gal co BX

00-392-7593 Herbicide, Bromacil, 21.9% lithium salt of bromacil, liquid (Hyvar X-L)

(4) 1 gal co BX

01-408-9079 Herbicide, Bromacil, 80%, wettable powder (Hyvar-X)

(12) 4 lb bags BX

01-005-7523 Herbicide, Diquat, 37.3%, water soluble liquid (Reward)

1 gal co GL

00-815-2799 Herbicide, Diquat, 37.3%, water soluble liquid (Reward)

(2) 2.5 gal co BX

01-341-9346 Herbicide, Diuron, mínimum 80% diuron, granular

25 lb bag BG

00-001-7710 Herbicide, 40% bromacil, 40% diuron, granular (Krovar I DF)

6 lb bag BG

01-630-3501 Herbicide, 40% bromacil, 40% diuron, granular (Krovar I DF)

25 lb bag BG

01-356-6001 Herbicide, Fluridone, 5%, pellets

(Sonar SRP)

40 lb co CO

01-356-8888 Herbicide, Fluridone 41.7% liquid (Sonar

A.S.)

1 qt co QT

01-525-5869 Herbicide, Imazapic ammonium salt

23.6% liquid (Plateau)

(2) 1 gal co BX

01-108-9578 Herbicide, Isopropylamine salt of glyphosate, 41%, water soluble liquid (Roundup

Pro/Ranger Pro/Razor Pro/Glyfos Pro)

(2) 2.5 gal co BX

01-388-0142 Herbicide, Isopropylamine salt of glyphosate, 41%, water soluble liquid (Roundup

Pro/Ranger Pro/Razor Pro/Glyfos Pro)

30 gal drum DR

01-356-8893 Herbicide, Isopropylamine salt of glyphosate, 53.8%, water soluble liquid (Rodeo/Roundup

Custom)

(2) 2.5 gal co BX

01-377-7113 Herbicide, Isopropylamine salt of glyphosate, 2.0%, Pelargonic acid 2.0%

(Roundup Ready-to-Use)

24 oz pump spray bottle

BT

01-399-0673 Herbicide, Ammonium salt of glyphosate, 73.3% and 2.9% Diquat dibromide, (Quik Pro)

5 pkg. BX

01-545-4540 Herbicide, Ammonium salt of glyphosate, 73.3% and 2.9% Diquat dibromide, (Quik Pro)

6.8 lb co CO

01-356-8902 Herbicide, Isopropylamine salt of Imazapyr, 26.7% (Arsenal Powerline)

(2) 2.5 gal co BX

01-532-5403 Herbicide, Isopropylamine salt of

Imazapyr, 27.7% (Habitat)

(2) 2.5 gal co BX

01-318-7417 Herbicide, Oryzalin, 40.4% (Surflan

A.S.)

(2) 2.5 gal co BX

00-145-0013 Herbicide, Prometon, 25% prometon, emulsifiable concéntrate (Pramitol

25E)

(2) 2.5 gal co BX

01-356-8891 Herbicide, Sulfometuron methyl, 75%

(Oust XP)

48-oz co CO

01-319-2890 Herbicide, Tebuthiuron, 80% (Spike 80 DF) 4 lb bag BG

01-457-6576 Herbicide, Tebuthiuron-Diuron, 1%

Tebuthiuron, 3% Diuron (Spraykil SK-

13)

40 lb container CO

01-552-1822 Herbicide, Triclopyr, 60.45% (Garlon 4

Ultra)

(2) 2.5 gal co BX

00-577-4194 Herbicide, 2,4-Dichlorophenoxy-acetic acid

(2,4-D), 67.2% oil miscible/water emulsifiable liquid (low volatile ester form)

(2) 2.5 gal co BX

00-664-7060 Herbicide, 2,4-Dichlorophenoxy-acetic acid

(2,4-D), 46.8% water soluble liquid (amine salt form)

(2) 2.5 gal co BX

01-377-7110 Herbicide, 2,4-Dichlorophenoxy-acetic acid

(2,4-D), 0.128%, 0.22% Mecoprop- p and

0.05% Dicamba water soluble liquid (Weed-B-Gon)

24-oz pump spray bottle

BT

APPENDIX H: REPLACEMENT PLAN OF DERAILMENT PREVENTION GUARD

(20190625)

ENVIRONMENTAL PROTECTION

1. GENERAL

1.1 SECTION INCLUDES: This specification covers the requirements for environmental protection during construction activities.

1.2 REFERENCES:

The Contractor shall comply with applicable laws and regulations of the Governments of the United States and Japan, however denominated, including those applicable political subdivisions, departments, and other entities, to include but not be limited to, the most current versions of the following:

A. DOD Japan Environmental Governing Standards (JEGS), Headquarters, U.S. Forces Japan

B. Air Force Instructions (AFIs)

C. 374AWI 32-7001 Solid Waste Management

D. 374AWI 32-7002 Water Pollution Control Facilities

E. Other applicable regulations and management plans

1.3 ENVIRONMENTAL PROTECTION REQUIREMENTS:

A. The Contractor shall minimize environmental pollution and damage as the result of contractor’s performance. The control of environmental pollution and damage requires consideration of land, water, and air, and includes management of visual aesthetics, solid waste, as well as other pollutants.

The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this contract.

B. Subcontractors: The Contractor shall ensure compliance with this section by their subcontractors.

C. Environmental Protection Plan: The Contractor shall submit an Environmental Protection Plan (EPP) within 15 days after receipt of the notice to proceed. Approval of the Contractor's plan will not relieve the Contractor of responsibility for adequate and continuing control of pollutants and other environmental protection measures. The EPP shall include, but not be limited to, the statement under

1.3.1 through 1.3.13:

D. The Project Manager (or designee) shall be responsible for the execution of the EPP. His or her responsibilities are, but not limited to, as follows:

1) Ensuring adherence to the Environmental Protection Plan;

2) Ensuring all appropriate documents are submitted to Environmental Element (374 CES/CEIE);

3) Appointing an emergency response manager for environmental emergencies, and;

4) Training personnel in accordance with the requirements of this plan.

E. The use of the following materials is prohibited:

1) Do not use materials containing asbestos. Asbestos Containing Materials are defined as any material containing more than 0.1% asbestos by weight.

2) Do not use paint that contains greater than 0.5% lead by weight or 5,000 ppm by weight.

3) Do not use materials containing polychlorinated biphenyl’s (PCB) greater than 0.5mg/kg.

4) Do not use class 1 ozone depleting substances (ODS) listed in JEGS, Chapter 2.

1.3.1. ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

A. All contractor personnel shall be aware of and comply with the Yokota Air Base Environmental Commitment Statement. All contractors are required to complete the EMS awareness training and comply with the EMS program, including all base environmental plans, instructions and the Japan Environmental Governing Standards (JEGS). Log of personnel that completed the EMS awareness training shall be submitted to the Contracting Officer prior to the work being commenced.

Summarized EMS information will be separately provided by the Contacting Officer during the preconstruction meeting.

B. Communicate with Environmental Program Managers (EPMs) to be aware of any operational controls (permits, plans, requirements to purchase recycled content, bio-based, or energy efficient products).

C. Provide copies of environmental records as requested by EPMs to meet recordkeeping requirements.

D. Ensure that personnel are properly trained in accordance with applicable statutes and regulations.

E. Immediately report all hazardous waste or hazardous material releases to the installation emergency response activity, and fully cooperate with any emergency response.

1.3.2. AIR QUALITY

A. Equipment operation and activities or processes performed by the Contractor in accomplishing the specified construction shall be in accordance with all applicable Federal and local laws and standards.

B. Class I Ozone Depleting Substances (ODS): Class I ODS listed in JEGS, Chapter 2 are prohibited from being used in construction, remodeling, or maintenance. Contractor must provide certifications that refrigerant utilized during the project do not contain Class I ODS. The purchase of Class I ODS for air conditioning and refrigeration equipment for ground applications is also prohibited by AFI 32- 7086 on all new and/or refurbishing projects. NOTE: Limited exceptions exist for using Class I ODS for airborne equipment with prior approval. Contact 374 CES/CEIE for details.

C. Class II ODS Approval Request: Class II ODS listed in JEGS, Chapter 2 must first be approved by 374 CES/CEIE prior to use.

D. All Refrigerant Types: Ensure a weatherproof data plate is permanently attached to refrigeration (or air conditioning) equipment, in a location visible to maintenance workers, showing refrigerant type and full charge quantity.

E. Generators, Incinerators, and Boilers: If generators, incinerators or boilers are to be installed or replaced as part of the project, the contractor shall provide 374 CES/CEIE stack height with:

1) Fuel Combustion Rate (L/hr) for Generators;

2) Grate area (m2), Rated Capacity (t/day), Incineration rate(kg/h) for Incinerator;

3) Heating area (m2), Burner combustion rate (L/hr), Heat Input rating (MMbtu/hr) for Boilers.

F. Particulates: Dust particles; aerosols and gaseous by-products from construction activities; and processing and preparation of materials, such as from asphaltic batch plants; shall be controlled at all times, including weekends, holidays and hours when work is not in progress. The Contractor shall maintain excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil areas, borrow areas, and other work areas within or outside the project boundaries free from particulates which would cause the air pollution standards to be exceeded or which would cause a hazard or a nuisance. Sprinkling, chemical treatment of an approved type, light bituminous treatment, baghouse, scrubbers, electrostatic precipitators or other methods will be permitted to control particulates in the work area. Sprinkling, to be efficient, must be repeated to keep the disturbed area damp at all times. The contractor shall coordinate with 374 CES/CEIE before the commencement of any activities. Even sprinkling of water should be reconsidered from resource conservation standpoint. The Contractor must have sufficient, competent equipment available to accomplish these tasks. Particulate control shall be performed as the work proceeds and whenever a particulate nuisance or hazard occurs.

G. Hydrocarbons and Carbon Monoxide: Hydrocarbons and carbon monoxide emissions from equipment shall be controlled to allowable limits at all times.

H. Odors: Odors shall be controlled at all times for all construction activities, processing and preparation of materials.

I. Sound Intrusions: The Contractor shall control noise to minimize environment damage.

1.3.3. WATER RESOURCES

A. The Contractor shall manage their activities to avoid pollution of surface and ground waters. Toxic or hazardous chemicals shall not cause contamination of the fresh water reserve. All water areas affected by construction activities shall be monitored by the Contractor.

B. Washing and Curing Water: Wastewaters originating from construction activities shall not be allowed to enter water areas.

C. Fish and Wildlife: The Contractor shall minimize interference with, disturbance to, and damage of fish and wildlife. Species that require specific attention along with measures for their protection shall be listed by the Contractor prior to beginning of construction operations.

D. Wastewater Management: The Contractor is not authorized sewage holding tanks on base and is not authorized to dispose of waste from chemical toilets/porta-potties via the installation sewer system.

When using chemical toilets, the contractor shall plan for procuring a porta-potty/chemical toilet service contract. The porta-potty/chemical toilet service contract must include the correct maintenance, waste collection, transportation and disposal of all porta-potty/chemical toilets and content to include provisions for pest control and elimination of odors. If the project generates wastewater from rinsing tanks, dewatering sites, etc, the contractor shall ensure proper disposal after CEIE’s approval. The Contractor may be required to provide further analysis and treatment based on the condition of wastewater.

1.3.4. HAZARDOUS MATERIALS

A. Approval is required before bringing any hazardous materials (HAZMAT) on to the installation.

Contractors seeking approval to bring HAZMAT onto the installation must submit AF Form 3000 along with Safety Data Sheet (SDS) in English and Japanese. The contractor is also required to provide the estimated amount of HAZMAT to be used during the project. HAZMAT includes paint related materials, adhesives, cement, and compressed gases. If the HAZMAT is suspected to contain lead or asbestos, such as paint, primer, caulking, cement, a certificate from the manufacturer has to be provided to prove that the HAZMAT is free of asbestos/lead. The AF Form 3000 package has to be reviewed by Bioenvironmental (374 AMDS/SGPB), Safety (374 AW/SE) and Environmental (374 CES/CEIE). The Contractor should use non or less -hazardous chemicals when available. All excess materials and empty containers are the responsibility of the contractor and shall be removed at the end of the contract. When the occupants of the facility request the contractor leave the excess HAZMAT, the contractor has to obtain 374 CES/CEIE approval.

B. Storage: All HAZMAT on installation must be stored properly. All containers of HAZMAT in the work place shall be labeled, tagged or marked in both English and Japanese with the identity of the products. The contractor shall ensure adequate handling and storage in accordance with JEGS where the HAZMAT is stored. Storage of oils, greases, chemicals, fuels or other liquids will require spill prevention and security. Contractor is not allowed to store HAZMAT on base for over 24 hours without authorization. If on-base HAZMAT storage areas are needed, Contractor shall submit the list of all items that are to be stored on-base and estimated quantities to 374 CES/CEIE, 374 CES/CEF and 374 AW/SE for approval. Hazardous materials storage areas may be inspected by 374 CES/CEIE, 374 CES/CEF and 374 AW/SE at any time. SDSs must be available at storage and on site at all times.

1.3.5. WASTE DISPOSAL

A. Every effort shall be made to use recycling and/or reuse (diversion) measures to reduce the amount of waste generated under the Contract. Waste minimization and disposal plan shall be included in the EPP. In addition, a copy of contract(s) for waste collection/transportation and disposal permits issued from local governments or equivalents shall be submitted with AF Form 3000 to 374 CES/CEIE separate from the EPP. The plan also needs to list waste that will be generated from the contract and how they are treated (recycled/incinerated/landfilled). After the disposal, page A and E of waste manifests shall be submitted to 374 CES/CEIE along with the report that shows the amount of waste recycled, incinerated/landfilled. (Atch 1)

B. Solid Wastes: Solid wastes (excluding clearing debris) shall be placed in containers which are emptied on a regular schedule. Handling and disposal shall be conducted to prevent contamination.

Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste. The Contractor shall transport solid waste off government property and dispose of it in compliance with applicable federal and local requirements for solid waste disposal. The Contractor shall comply with site procedures Federal and local laws and regulations pertaining to the use of landfill areas. At a minimum, the following items will be recycled: scrap metal, cardboard, concrete, asphalt, scrap wood, wooden pallets, glass and plastic. Green wastes should be mulched or composted.

C. Hazardous Waste (HW): All HW generated by the contractor shall be disposed/recycled off base in accordance with Japanese regulation, Article 3 of “Law of Disposal and Clearing of Waste “Haikibutsu no shori oyobi seisou ni kansuru horitsu” and local regulations. US/foreign made ionization smoke detectors shall be turned in to 374 CES/CEOFA (Alarm Shop). The Contractor shall not leave any hazardous waste at work site areas at the end of duty hours. If temporary hazardous waste storage is needed to accumulate hazardous waste on base, the contractor shall submit spill response plan with site map, the list of all hazardous waste to be stored on-base and estimated quantities to 374 CES/CEIE, 374 CES/CEF, 374 AMDS/SGPB and 374 AW/SE for approval.

D. Burning: Open burning is prohibited for the purpose of reducing waste.

1.3.6. FUEL STORAGE TANKS

A. Temporary Fuel Storage Tanks: The use of temporary fuel storage tanks with capacities greater than 55 gallons, but not limited to, as part of a project must be approved by 374 CES/CEIE, 374CES/CEF, 374 AW/SE. The tank may be inspected by 374 CES/CEIE, 374 CES/CEF, 374 AW/SE. The approval request must contain justification for the use of a temporary tank term and design details, including a layout diagram indicating the proposed location of the tank within the project site. If a temporary fuel storage tank is approved for use, a Site-specific Spill Contingency Plan (SSCP) must be developed.

After construction/installation of a temporary fuel storage tank, the Contractor shall contact project manager or 374 CES/CEIE at 225-5440 to inform Fuels Management Flight (374 LRS/LGRF) to coordinate an initial inspection (AFI 23-204).

B. Aboveground Storage Tank (AST) Installation: If the contractor is installing a permanent aboveground fuel storage tanks as part of the project, it shall be designed and installed in accordance with all applicable regulations (JEGS, AFIs, UFCs, etc). The contractor is responsible to conduct all operation check, including providing fuel for the test, and maintenance checklist before hand over to the base. AST will be assigned a Tank ID Number by 374CES/CEIAP and this Tank ID Number shall be used on tank signage and in project documentation. After construction/installation of an AST, the Contractor shall contact project manager or 374CES/CEIE at 225-5440 and the Fuels Management Flight (374 LRS/LGRF) at 225-4617 to coordinate an initial inspection (AFI 23-204).

C. Underground Storage Tank (UST) Installation: An UST must not be installed unless overriding requirements exist against aboveground installation such as safety, fire protection, or force protection measures. The contractor shall report justification of overriding requirements against installation of an AST to 374 CES/CEIE. If a UST is approved for installation as part of a project, the Contractor shall ensure that design drawings contain adequate detail to demonstrate that the UST will be installed in accordance with all applicable regulations. The contractor is responsible to conduct all operation checks, including providing fuel for the test, and maintenance checklist, before hand over to the base.

After construction/installation of an AST, the Contractor shall contact project manager or 374CES/CEIE at 225-5440 and the Fuels Management Flight (374 LRS/LGRF) at 225-4617 to coordinate an initial inspection (AFI 23-204).

D. AST Removal: When a facility with a fuel storage tank(s) is demolished, demolition of the tank(s) and associated infrastructure, including above-ground piping, underground piping to the building serviced by the tank, indoor piping to the equipment serviced by the tank, secondary containment curbing, tank saddles, tank pads, Oil Water Separators (OWS), grounding stations, signage, fencing around the AST, associated equipment and sidewalks leading to the AST shall be included in the scope of the project. Contractor shall ensure to comply with applicable regulations such as AFI32-7044, UFC 3-460-01 and UFGS 33 01 50.01, 33 65 00.

E. UST Removal: The following standards of UST removal shall be applied as required including but not limited to applicable JEGS Chapter 19, AFI32-7044, UFC 3-460-01, USGF 02 65 00, 33 01 50.01, 33 65 00 the UST Removal Procedures appendix of the PACAF UST Policy: Contractor shall ensure to comply with above regulations.

F. Contaminated Soil Removal: If exposed free product and/or obviously contaminated soil is encountered during UST removal, contact 374CES/CEIE immediately. If soil contamination is caused by the contractor’s mismanagement, the contractor is responsible for cleanup and disposal in accordance with spill response procedures outlined in this specification and local applicable regulations.

G. Fuel Storage Tank Installation/Removal Report: If an AST/UST is installed or an AST/UST is removed as part of the project, the Contractor shall prepare a Fuel Storage Tank Installation/Removal Report and provide it to 374CES/CEIE within 30 days of the completion of site work. At a minimum, the report shall include the following:

1) Summary of work conducted;

2) Removal date for each removed storage tank;

3) Date placed in service, capacity, manufacturer name, model number, and serial number for each new AST/UST;

4) As-built drawings showing the removed AST/USTs and new ASTs and associated infrastructure;

5) Leak check report for buried piping associated with storage tank at time of installation, modification, construction, relocation or replacement.

6) Manufacturer Operations & Maintenance Manuals and product information;

7) Manufacturer Warranty Cards(Copy);

8) Photo documentation of construction activities, including AST/UST removals and/or new AST installations.

1.3.7. POLYCHLORINATED BIPHENYLS (PCBs)

A. Procurement of No PCB Containing Materials: Materials that contain PCBs are prohibited from being used under this Contract. All procurement of transformers or any other equipment containing dielectric or hydraulic fluid shall be accompanied by the manufacturer’s certification that all materials/equipment (e.g., ballasts, capacitors, transformers, Paper Insulated Lead Covered (PILC) Cable, etc.) contain non-PCB dielectric fluid.