Appendix E Attachment 1 to Contract No, FA520920Q0026

List of Repair/Maintenance Work at U.S Military Sidetrack Tsurumi(N.o342),2020 OU2

FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE

Item No.

Description Unit Qty Remaks

1 Replace Wooden Tie:

Nami(Regular)

EA 4

Iriku=2、Track8=2

2 Replace Iron Tie EA 26

Iriku=11 、Track1=9本

Track8=6

3 Cleaning of Flange Way m 54 Flange Way in OU2 13m×2times ayear

Railway Crossing 14m×2times a year

4 Oilling switching point SET 8

Total=8sets Once-a-month work

5 Chemical Weed Control ㎡ 11,325.0 5,662.5㎡×2tims (Including inside of trackage and entrance)

Submit Material Safety Data Sheet (MSDS) to the US government.

6 Weeding ㎡ 142.5 Perform weeding once a year at the same time with the other weeding work. Dispose waste after weeding.

TSURUMI TERMINAL OU2(No.342)

Attachment 1 to Contract No.FA520920Q0026

List of Repair/Maintenance Work at U.S Military Sidetrack Tsurumi(No .343),2020 OU1

FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE

Item No.

Description Unit Qty Remaks

1 Replace Wooden Tie:

Nami(Regular)

EA 15

Trac3=13

Iriku…2

2 Replace Iron Tie EA 14

Iriku=4

Track3=5

Track4=5

3 Cleaning of Flange Way m 224 Railway Crossing 80m×2tims year

Flange Way in OU1 16m×4tims year

4 Oiling switching point SET 2 Total:2sets Once-a-month work

5 Chemical Weed Control ㎡ 1990 995㎡×2tims (Inside and Outside of OU1)

Submit Material Safety Data Sheet (MSDS) to the US government.

6 Weeding ㎡ 98.075 Perform weeding once a year at the same time with the other weeding work. Dispose waste after weeding, 7 Replace rail fastening EA 28 Track3=13(No.6 Trackage=9, No7 Trakage=1, No.9 Trackage=3) Track4=15(No.8 Trackage=1 No.9 Trackage=2 No.11 Trackage=12)

TSURUMI TERMINAL OU1 (No.343)

Appendix F

Y Solicitation 0026

1514206984U Typewritten Text *Including Chemical Weed Control after Weeding.

(Once a year)

1514206984U Typewritten Text *Including Chemical Weed Control

1514206984U Typewritten Text *Chemical Weed Control 1,990m2(995m2× 2times in a year)

1514206984U Typewritten Text *Chemical Weed Control 11,325m2(5662.5m2×2times in a year)

1514206984U Line

PWS FY20 SIDETRACK MAINTENANCE FLCY 9page
★PWS FY20 SIDETRACK MAINTENANCE
変化PWS FY20 SIDETRACK MAINTENANCE FLCY1
変化PWS FY20 SIDETRACK MAINTENANCE FLCY2
変化PWS FY20 SIDETRACK MAINTENANCE FLCY3
PWS FY20 SIDETRACK MAINTENANCE FLCY.pdf
Attachment 1 to Contract No.FA520920Q0026
FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
List of Repair/Maintenance Work at U.S Military Sidetrack Tsurumi(N.o342),2020 OU2
FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
(7Track)
(8Track)
22ロ
B
Cleaning of Flange Way(4times a year) 16m
Revised PWS FY20 SIDETRACK MAINTENANCE FLCY.pdf
Attachment 1 to Contract No.FA520920Q0026
FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
List of Repair/Maintenance Work at U.S Military Sidetrack Tsurumi(N.o342),2020 OU2
FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
(7Track)
(8Track)
22ロ
B
Cleaning of Flange Way(4times a year) 16m
Revised PWS FY20 SIDETRACK MAINTENANCE FLCY.pdf
Attachment 1 to Contract No.FA520920Q0026
FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
List of Repair/Maintenance Work at U.S Military Sidetrack Tsurumi(N.o342),2020 OU2
FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
(7Track)
(8Track)
22ロ
B
Cleaning of Flange Way(4times a year) 16m
Revised PWS FY20 SIDETRACK MAINTENANCE FLCY.pdf
Attachment 1 to Contract No.FA520920Q0026
FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
List of Repair/Maintenance Work at U.S Military Sidetrack Tsurumi(N.o342),2020 OU2
FY20 TSURUMI TERMINAL SIDETRACK MAINTENANCE QUANTITY TABLE
(7Track)
(8Track)
22ロ
B
Cleaning of Flange Way(4times a year) 16m