Atch 1 PWS 20191230.pdf
PDF 209 KB Posted
- Attached to
- ASH RECYCLING SERVICE AT YOKOTA AB, Tokyo, Japan
- Solicitation number
- FA520920Q0018
About this file
This performance work statement and related solicitation are for ash recycling services at Yokota Air Base in Tokyo, Japan. The contractor will be required to recycle all ash generated by the base refuse incinerator plant in accordance with applicable Japanese laws and regulations. The contractor must possess all required business permits, including an industrial waste treatment permit, and submit documentation of permits within ten days of award. The contractor will also be responsible for submitting monthly reports within thirty days detailing ash transport and recycling activities, as well as a flow chart of recycling procedures. A pre-proposal conference for interested offerors will be held on January 17, 2020. The Department of the Air Force Pacific Air Forces is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Precon Min.pdf | ||
| Clearance Letter Q A Ash Recycling SV.pdf | ||
| Atch 2 Past Performance List.docx | DOCX document | |
| Atch 3 Past Performance Survey.docx | DOCX document | |
| Solicitation - FA520920Q0018.pdf | ||
| Govt Policy Ltr.pdf | ||
| Notice to Offerors Ash Recycling SV.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract No. FA5209-20-C-xxxx (Solicitation No. FA5209-20-Q-0018)
Attachment 1
PERFORMANCE WORK STATEMENT
FOR
ASH RECYCLING SERVICE FOR YOKOTA AIR BASE, JAPAN
30 Dec 19
Contract No. FA5209-20-C-XXXX
1. DESCRIPTION OF SERVICES/GENERAL INFORMATION. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform ash-recycling service for Yokota AB, Japan in accordance with applicable Japanese laws and pertinent regulations, and commercial practices. The Contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). The Contractor shall possess all applicable business permits.
1.1. Recycling Ash. The Contractor shall recycle the ash generated by the base refuse incinerator plant, Bldg 1526, at Yokota Air Base in accordance with Air Force Policy on Achieving Efficiencies through Pollution Prevention and Waste Elimination (See Para 3.1.2 below). The transportation of ash shall be provided by the Government’s designated contractor to the Contractor’s Recycling Facility.
1.2. Submittals and Reports
1.2.1. Business Permits. The Contractor, as a minimum, shall possess and submit a copy of the valid business permits listed below to perform the services specified in this PWS in conformance with Japanese laws and pertinent regulations:
Required Business Permit: Industrial Waste Treatment Business Permit (産業廃棄物処分業許可)
Item: Bottom Ash (燃え殻)and Fly Ash (ばいじん)
Method: Final and/or Intermediate Treatment (Recycling): (最終処分または中間処分)
1.2.2. Flow Chart. The Contractor shall submit the ash recycling flow chart to the Contracting Officers Representative (COR) who will perform the complete audit trail of the ash recycling procedure, to include the final disposition, within ten (10) calendar days after contract award.
1.2.3. Monthly Reports. The Contractor shall submit four (4) copies of all reports in English & Japanese to the COR within thirty (30) calendar days after measurements are taken. The contractor shall submit receipts translated in English from every ash recycling transaction to include the quantity of recycled product. If Ash is not recycled the contractor must submit receipts of any disposal transactions to include quantity and final disposition location (i.e. name and location of landfill). The contractor will also submit any Ash compound analysis reports that is performed on the Ash generated at Yokota AB Japan. This report must be provided to the COR before submitting the invoice.
1.2.4. Manifest. The Contractor shall control manifests in accordance with the Japanese Waste Management and Public Cleansing Law, Paragraph 12-3, “Manifest”. The manifests for the generator’s pages shall be submitted to the COR with the Contractor's monthly invoice.
2.0. Service Summary.
Performance Objective
PWS Para Performance Threshold Method of Assessment
SS# 1: Submittal and Reporting
1.2. Complete requirement 100%
of the time
100% Inspection
2.1. Remedial Action for Non Submittals. If the contractor fails to submit all reports within the contract timelines, the contractor has 10 calendar days from the date the Government notifies it of the
Attachment 1 missing reports (or the date the contractor discovers the deficiency) to submit all required reports and documents as outlined in section 1.2 of this PWS.
3. GENERAL INFORMATION
3.1. Quality Control.
3.1.1. The Contractor shall ensure all services are performed in accordance with Japan Environmental Governing Standards (JEGS) Chapter 7, Japanese laws (e.g., Industrial Waste Treatment Low, 産業廃棄 物処理法), pertinent regulations and commercial standards and practices.
3.2. Quality Assurance. The COR will evaluate the contractor’s performance based on paragraph 1.2 and the QASP.
3.3. Inspection of Facilities. The contractor must allow the government representatives visitation and inspection of contractor facilities at any time. These visits will be to conduct Quality Assurance Quality Control.
3.4. Hours of Operation.
3.4.1. Normal Working Hours. Minimum operation hours shall be between 07:30 to 16:30, Monday through Friday including Japanese holidays, but excluding US legal holidays.
3.4.2. Recognized US Holidays. The recognized US legal holidays* are listed below:
1 January New Year’s Day 3rd Monday of January Martin Luther King Jr’s Birthday 3rd Monday of February Washington’s Birthday Last Monday of May Memorial Day 4th July Independence Day 1st Monday of September Labor Day 2nd Monday of October Columbus Day 11th November Veterans Day 4th Thursday of November Thanksgiving Day 25th December Christmas Day
*Holidays falling on a Saturday will be observed on the preceding Friday. Holidays falling on a Sunday will be observed on the following Monday.
3.5. SPECIAL QUALIFICATIONS.
3.5.1. Business Permits. The contractor shall possess any and all applicable business permits, certifications, and licenses to complete service in accordance with this PWS as required by Japanese Environmental Government Standards and Japanese laws. The contractor will ensure all documents are current. The contractor shall submit a copy of each of these documents to the Contracting Officer (CO) within one week after receiving updated or renewed documents.
Attachment 1
3.5.2. Project Manager (PM): The contractor shall provide a PM who shall be responsible for the performance of the work. The name of this person and his/her alternate(s) shall be designated in writing to the CO within ten (10) calendar days after contract award.
3.5.2.1. The PM or his/her alternate(s), upon notification, shall be available during normal working hours identified in Paragraph 3.4.1 within two (2) hours to meet on the installation with the COR to discuss problems.
3.5.2.2. The PM and his/her alternate(s) must be able to read, write, speak, and understand English, or provide a translator.
3.5.3. Contractor Employees. The contractor shall not employ persons for work on this contract, if he/she is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
3.5.3.1. When visiting Yokota Air Base in an official capacity, contractor personnel shall present a neat appearance and be easily recognized as a contractor employee. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee’s names. The contractor shall adhere to all base safety and traffic regulations and policies.
3.5.3.2. The Contractor shall not employ any person who is an employee of the US Government if employing that person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies of the Department of the Air Force.
3.5.3.3. The Contractor is cautioned that off duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours or deployment. Military Reservists and National Guard members may be subject to recall to active duty.
3.5.3.4. The abrupt absence of these personnel could adversely affect the Contractor’s ability to perform under this contract; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.
4. GOVERNMENT FURNISHED SERVICES.
4.1. The Government will provide, for emergency purposes only, the following services:
a. Security Police Telephone 911 or 225-7227
b. Fire Protection Telephone 911
c. Hospital Emergency (Reimbursable expense) Telephone 911
Any time the contractor uses one of the above services, the Contractor shall immediately report to the COR with all of the details. The Contractor will be required to submit, in writing, within two (2) calendar days, the details surrounding the use of this service to the COR.
4.2. Damage. The contractor shall exercise care not to damage any facilities or grounds at Yokota Air Base and the remote sites. Any damages the Contracting Officer determines to have been caused by the contractor shall be repaired by the contractor at no expense to the Government.
5. Contractor Full-Time Reporting
5.1. The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The Contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
5.2. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October each calendar year. Contractors may direct questions to the Contractor Manpower Reporting Application (CMRA) help desk.
5.2.1. Reporting Period: Contractors are required to input data by 31 October of each year.
5.2.2. Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
5.2.3. User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link.
However, user manuals for Government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
Appendix Listing
1. Appendix A - Incinerator Heavy Metal and Dioxin History
2. Appendix B - Historical Record of Ash Transportation
3. Appendix C - Shared of Quantity for each Area http://www.ecmra.mil/
Appendix A
Incinerator Heavy Metal and Dioxin History
Attachment 1
Appendix B
Historical Record of Ash Transportation
Time Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19
Source Kg Source Kg Source Kg Source Kg Source Kg Source Kg
1 AP 10,080 INC 10,970 INC 11,210 INC 10,850 INC 10,480 AP 10,700
2 AP 10,460 INC 10,390 INC 11,640 AP 10,960 AP 11,090 INC 10,770
3 AP 10,540 INC 10,830 AP 11,310 INC 11,160 INC 10,200 INC 11,360
4 INC 11,210 AP 10,990 INC 10,740 INC 10,280 INC 10,640 INC 10,960
5 AP 11,160 INC 10,860 AP 11,150 AP 10,140 INC 11,230 INC 10,550
6 INC 11,010 AP 10,910 INC 11,340 INC 10,390 INC 10,800
7 INC 11,090 INC 11,490 INC 10,230 INC 10,430 INC 10,590
8 INC 11,190 AP 11,640
9 AP 10,230
Monthly
Total 75,550 97,860 89,260 74,210 75,030 54,340
Notes:
1. (INC = Incinerator, AP = Ash Pit)
Appendix C
SHARED OF QUANTITY FOR EACH AREA
AREA SHARE
Yokota O&M (Industrial) 63.9% Military Family Housing (MFH) 33.0% Department of Defense Education Activity (DoDEA) 1.7% Hospital (HOSP) 1.4%
File details come from the government source that posted it. Updated .