Attachment_2_-_Pricing_Exhibit.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Lease and Installation of Squadron Ops Building Federal contract opportunity
- Solicitation number
- FA5209-18-Q-0152
About this file
Pricing Exhibit
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Conformed_SF_30.docx | DOCX document | |
| Questions_and_answers_amendment.docx | DOCX document | |
| Revised_Pricing_Exhibit.pdf | ||
| Solicitation_amendment.docx | DOCX document | |
| Questions_and_answers.docx | DOCX document | |
| QAs.pdf | ||
| Amendment_-_FA520918Q015_1.pdf | ||
| FA520918Q01520001_SF30.pdf | ||
| Appendix_A_-_Temporary_Squadron_Operations_-_new_lease_Updated_20180908.pdf | ||
| Appendix_B_-_Sample_Comm_Electrical_Layout.pdf | ||
| Q23_X10_Catalog_Data.pdf | ||
| QAs_FA520918Q0152.pdf | ||
| Revised_Pricing_Exhibit.pdf | ||
| Revised_PWS_FA520918Q0152.pdf | ||
| Q23_IDS_Catalog_Data.PDF | ||
| Attachment_1_-_PWS.pdf | ||
| Notice_to_Offeror.pdf | ||
| Business_w_US_Government.pdf | ||
| Gate_Pass_Req.xlsx | XLSX spreadsheet | |
| FA520918Q0152.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 The Government may award all, some, OR no line items in this pricing exhibit. Therefore each option must be priced separately.
Addenda to CLIN 0001: INSTALLATION (Period of Performance 28 Sep thru 1 Dec 18)
| Option | Description | Location | Quantity (ea) | Total Price |
| Option 1 (PWS paragraph 1.2.9.1) | The contractor shall provide perimeter doors constructed of metal with X-10 locks installed in accordance with Federal Specification FF-L-2740 | Temporary Squadron Operations Facility | 1 | Y |
| Option 2 (PWS paragraph 1.2.9.2) | The contractor shall ensure that all out-swing perimeter doors have hinges that are peened, brazed, or spot welded to prevent removal. | Temporary Squadron Operations Facility | 1 | Y |
| Option 3 (PWS paragraph 1.2.9.3) | All penetrations in the exterior of the facility shall be kept |
less than 96 square inches or be hardened in accordance with Military Handbook 1013/1A.
| Temporary Squadron Operations Facility | 1 | Y | ||
| Option 4 (PWS paragraph 1.2.9.4) | The contractor shall install a Vindicator V5 Intrusion Detection System (IDS) and the IDS shall detect any unauthorized penetration in to facility. The IDS equipment shall be located inside the facility and panels shall be located near the main entrance. The contractor shall provide motion detection sensors at each possible entrance and sensors shall be connected to the IDS. The contractor shall protect each perimeter door with a balanced magnetic switch (BMS) that connects to the IDS and meets the standards of UL-634. | Temporary Squadron Operations Facility | 1 | Y |
&"Times New Roman,Bold"&12&UPricing Exhibit for PO No. FA5209-18-Q-0039&"Times New Roman,Regular"&U
Sheet2
Sheet3
File details come from the government source that posted it.