Attachment_2_-_Pricing_Exhibit.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Lease and Installation of Squadron Ops Building Federal contract opportunity
Solicitation number
FA5209-18-Q-0152
Issued by
Department of the Air Force Pacific Air Forces

About this file

Pricing Exhibit

View the file

Other files for this federal contract opportunity

Other files attached to Lease and Installation of Squadron Ops Building, newest first.
File Type Posted
Conformed_SF_30.docx DOCX document
Questions_and_answers_amendment.docx DOCX document
Revised_Pricing_Exhibit.pdf PDF
Solicitation_amendment.docx DOCX document
Questions_and_answers.docx DOCX document
QAs.pdf PDF
Amendment_-_FA520918Q015_1.pdf PDF
FA520918Q01520001_SF30.pdf PDF
Appendix_A_-_Temporary_Squadron_Operations_-_new_lease_Updated_20180908.pdf PDF
Appendix_B_-_Sample_Comm_Electrical_Layout.pdf PDF
Q23_X10_Catalog_Data.pdf PDF
QAs_FA520918Q0152.pdf PDF
Revised_Pricing_Exhibit.pdf PDF
Revised_PWS_FA520918Q0152.pdf PDF
Q23_IDS_Catalog_Data.PDF PDF
Attachment_1_-_PWS.pdf PDF
Notice_to_Offeror.pdf PDF
Business_w_US_Government.pdf PDF
Gate_Pass_Req.xlsx XLSX spreadsheet
FA520918Q0152.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 The Government may award all, some, OR no line items in this pricing exhibit. Therefore each option must be priced separately.

Addenda to CLIN 0001: INSTALLATION (Period of Performance 28 Sep thru 1 Dec 18)

OptionDescriptionLocationQuantity (ea)Total Price
Option 1 (PWS paragraph 1.2.9.1)The contractor shall provide perimeter doors constructed of metal with X-10 locks installed in accordance with Federal Specification FF-L-2740Temporary Squadron Operations Facility1Y
Option 2 (PWS paragraph 1.2.9.2)The contractor shall ensure that all out-swing perimeter doors have hinges that are peened, brazed, or spot welded to prevent removal.Temporary Squadron Operations Facility1Y
Option 3 (PWS paragraph 1.2.9.3)All penetrations in the exterior of the facility shall be kept

less than 96 square inches or be hardened in accordance with Military Handbook 1013/1A.

Temporary Squadron Operations Facility1Y
Option 4 (PWS paragraph 1.2.9.4)The contractor shall install a Vindicator V5 Intrusion Detection System (IDS) and the IDS shall detect any unauthorized penetration in to facility. The IDS equipment shall be located inside the facility and panels shall be located near the main entrance. The contractor shall provide motion detection sensors at each possible entrance and sensors shall be connected to the IDS. The contractor shall protect each perimeter door with a balanced magnetic switch (BMS) that connects to the IDS and meets the standards of UL-634.Temporary Squadron Operations Facility1Y

&"Times New Roman,Bold"&12&UPricing Exhibit for PO No. FA5209-18-Q-0039&"Times New Roman,Regular"&U

Sheet2

Sheet3