Attachment_1_-_PWS.pdf

PDF 3 MB Posted

Attached to
Lease and Installation of Squadron Ops Building Federal contract opportunity
Solicitation number
FA5209-18-Q-0152
Issued by
Department of the Air Force Pacific Air Forces

About this file

PWS

View the file

Other files for this federal contract opportunity

Other files attached to Lease and Installation of Squadron Ops Building, newest first.
File Type Posted
Conformed_SF_30.docx DOCX document
Questions_and_answers_amendment.docx DOCX document
Revised_Pricing_Exhibit.pdf PDF
Solicitation_amendment.docx DOCX document
Questions_and_answers.docx DOCX document
QAs.pdf PDF
Amendment_-_FA520918Q015_1.pdf PDF
FA520918Q01520001_SF30.pdf PDF
Appendix_A_-_Temporary_Squadron_Operations_-_new_lease_Updated_20180908.pdf PDF
Appendix_B_-_Sample_Comm_Electrical_Layout.pdf PDF
Revised_Pricing_Exhibit.pdf PDF
Revised_PWS_FA520918Q0152.pdf PDF
Q23_X10_Catalog_Data.pdf PDF
QAs_FA520918Q0152.pdf PDF
Q23_IDS_Catalog_Data.PDF PDF
Notice_to_Offeror.pdf PDF
Business_w_US_Government.pdf PDF
Attachment_2_-_Pricing_Exhibit.xlsx XLSX spreadsheet
FA520918Q0152.pdf PDF
Gate_Pass_Req.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA5209-18-Q-0152

PERFORMANCE WORK STATEMENT

FOR

INSTALLATION & PURCHASE OF

PREFABRICATED FACILITY

YOKOTA AIR BASE,

JAPAN

(TEMP SQUAD OPS BLDG)

17 JUL 2018

TABLE OF CONTENTS

SECTION 1 Description of Services/General Information Page 3

SECTION 2 Services Summary Page 10

SECTION 3 Appendix Page 10

Appendix A – Temporary Squadron Operations Facility

SECTION 1

DESCRIPTION OF SERVICES/GENERAL INFORMATION

1.0. DESCRIPTION OF SERVICES. The contractor shall provide all necessary labor, personnel, supervision, management, tools, equipment, materials, and any other items and services necessary to install one (1) prefabricated facility (hereafter, referred as the facility) located at Yokota Air Base (YAB) in accordance with (IAW) this Performance Work Statement (PWS), commercial standards, manufacturer standards, Japanese ordinances and laws, and the attached appendices.

1.1. FACILITY TYPE. The contractor shall install one (1) 418 sq meter (27.4m X 15.24m) facility exterior to Building 584 IAW Appendix A. An additional modular facility will be provided and placed next to the facility noted in Appendix A on a separate contract and is annotated in the appendix. The

Government will accept Japanese adjustments to facility sizes to match the module variations.

Installation of the facilities shall be completed by 1 December 2018.

1.2. INSTALLATION SPECIFICATIONS.

1.2.1. The facility shall be constructed of materials to sustain commercial office use for at least the life of the contract. The facility shall have flat-type ceilings, insulated walls, windows, fixed and/or sliding doors, floor panels, access stairways and door canopies. The modular enclosures shall form a continuous, uninterrupted weather tight shell over the structure including flashing/sealed joints. Floors shall be able to support at least a 181.4 kg (450 lb) point load.

1.2.2. All interior and exterior walls shall be constructed with non-combustible material with a commercial thermal insulation appropriate to maintain a temperature range between 20 to 22 degrees C, year-round. The exterior walls should be rated for the local elements and a design wind speed of 200 kph.

Any perforations will need to be sealed and weatherproofed. Outdoor facility must include gutters, down spouts, and splash blocks. The facility must meet applicable commercial seismic requirements. Interior walls shall be rated for STC-31 sound attenuation.

1.2.3. Finished floor height shall be at least 304 mm above the existing ground level and have floors intended for high traffic areas.

1.2.4. Canopy, exterior lighting, metal stairs, and landing shall be provided at each exterior entrance.

Exterior entrance doors shall have metal hinges. All interior and exterior doors shall be key lock, and have at least two (2) keys provided to the customer.

1.2.5. All windows shall be able to open and include screens and blinds. Requested locations are identified on the attachments.

1.2.6. Recessed raceways shall be provided that allow for the installation of electrical, telephone, and/or

LAN wiring at requested locations outlined in the attachments. 1/2" (115 mm) deep junction boxes shall be installed in the appropriate locations. The installation of the raceways shall provide for a seamless transition on the floors and walls and provide adequate space for any future additional cabling. The raceways shall have removable cover plates.

1.2.7. A multi evaporator system shall be provided for both heating and cooling in the facility. The size and installation of building space conditioning equipment shall be IAW UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems (most current version as of date of award). Equipment must be able to maintain the space at 22 ℃/72F in the summer and 20℃/68F in the winter. Commercially available HVAC systems are acceptable the facility of para 1.1 above. Industrial filters shall be provided.

The contractor shall recommend locations, size, and specification of the units to the Contracting Officer’s

Representative (COR) for approval.

1.2.8. The contractor shall provide bathrooms in the temporary squadron operations facility. The women’s bathroom will consist of two (2) showers, two (2) toilets, and two (2) sinks. The men’s bathroom will consist of four (4) showers, two (2) toilets, two (2) urinals, and two (2) sinks. The facility shall also have two (2) water fountains and a sink. The contactor shall tie the facility into the existing water and sewer lines on the site and reference UFC 3-420-01 Plumbing Systems (most current version).

The tie-in locations are listed in Appendix A.

1.2.9. The Government is contemplating awarding all, some, or none of the modifications in this paragraph. Pricing shall be submitted separately in accordance with the solicitation.

1.2.9.1. (Option 1) The contractor shall provide perimeter doors constructed of metal with X-10 locks installed in accordance with Federal Specification FF-L-2740.

1.2.9.2 (Option 2) The contractor shall ensure that all out-swing perimeter doors have hinges that are peened, brazed, or spot welded to prevent removal.

1.2.9.3. (Option 3) All penetrations in the exterior of the facility shall be kept less than 96 square inches or be hardened in accordance with Military Handbook 1013/1A.

1.2.9.4. (Option 4) The contractor shall install a Vindicator V5 Intrusion Detection System (IDS) and the

IDS shall detect any unauthorized penetration in to facility. The IDS equipment shall be located inside the facility and panels shall be located near the main entrance. The contractor shall provide motion detection sensors at each possible entrance and sensors shall be connected to the IDS. The contractor shall protect each perimeter door with a balanced magnetic switch (BMS) that connects to the IDS and meets the standards of UL-634.

1.3. ELECTRICAL SYSTEM SPECIFICATIONS.

1.3.1. Electrical installation shall comply with all requirements specified by the National Fire Protection

Association (NFPA), No. 70, National Electrical Code, Chapter 5, Special Occupancies, Article 590, ‘Temporary Installations’ and the Japan Electric Association (JEAC).

(NFPA): http://www.nfpa.org/index.asp?rp=t

(JEAC): http://www.denki.or.jp/pub/jeacjeag.html

1.3.2. The contractor shall provide and install electrical distribution wiring, fixtures, outlets, cables, wiring, accessories, and molded case circuit breakers. Electrical systems shall also include cable wiring, panel boards, fluorescent lighting, wall switches, and receptacles. The contractor shall provide and install exterior lighting. The contractor shall provide electrical service from existing main distribution panels located next to installation site.

1.3.3. The facility shall be wired with Cat 6 communication wire. Communication ports and power outlets shall be of US style and be located every 2 m, with at least two (2) power outlets and two (2) communications ports. Each facility will require a wall mounted quarter communications rack with a power outlet inside the rack. It will require a conduit near the communications rack so that fiber optic cable can be run from outside the facility into the communications rack. The electrical for the facility http://www.nfpa.org/index.asp?rp=t http://www.denki.or.jp/pub/jeacjeag.html shall be 50 Hz/120V. Wiring should be installed within walls or with a clean finish utilizing wire mold.

Power outlets and panels can be either surface or flush mounted.

1.3.4. Ground rods and wire conductors for equipment grounding shall be installed IAW Article 590 of

National Electrical Code and Japan Electric Association (JEAC) standards.

1.3.5. Ground-resistance measurements shall be certified by the contractor and provided to the COR upon completion of electrical system installation. The data provided will include the measured ground resistance of each grounding rod, the rod’s location, grounding system used, soil conditions, and noted resistance at the time of measurement. Ground-resistance measurements shall be made in normal dry weather, not less than 48 hours after rainfall, with the underground test location isolated from other grounding rods. If applicable, the contractor shall dig a hole and shall remove frozen soil to make dry conditions for the measurements. The ground resistance shall be measured using the ‘fall-of-potential’ method before the operating test and shall not exceed 25 ohms when measured in normal dry conditions.

1.4. SUBMITTALS.

1.4.1. The contractor shall provide submittals in both English and Japanese to the COR for approval for each item listed below within the number of days specified for each submittal. The descriptive information shall be supported by catalogs, certificates of compliance, or other data published by the manufacturer to demonstrate conformance with specification requirements prior to installation.

1.4.2. Building Shop Drawings. The contractor shall provide building shop drawings, with bracing structural locations, to the COR within 30 calendar days after contract award. The drawings shall include floor plans (based on the above specifications), a reflected ceiling plan, HVAC drawings, wall/ceiling section details, anchorage detail to existing concrete slabs, and appropriate installation details, as required.

1.4.3. Materials and Equipment Manufacturer’s Data. The contractor shall provide the below materials and equipment manufacturer’s data to the COR within 30 calendar days after award.

Cables

Light fixtures

Breakers and associated circuits

Windows

HVAC Equipment

Doors

Wall, ceiling, and floor systems

Toilets, sinks, showers, and water fountains

X-10 locks*

IDS components*

*Only required if Government awards applicable option in paragraph 1.2.9.

1.5. FACILITY ACCEPTANCE INSPECTION. The CORs will inspect the facility within 15 calendar days following the installation of each building. If any discrepancies are found during the inspection, the

CORs will notify the contractor to perform corrective actions. The contractor shall correct the discrepancies within four (4) calendar days.

2.0. GENERAL INFORMATION.

2.1. CONTRACTOR PERSONNEL.

2.1.1. Contract Manager. The contractor shall provide a contract manager who shall be responsible for all requirements in this PWS. The name of this person and an alternate(s) who shall act for the contractor when the manager is absent, shall be designated in writing to the KO. The contract manager or alternate shall have full authority to act for the contractor on all matters relating to this contract. The contractor shall provide the contract manager’s names, addresses, and telephone numbers. The contractor shall maintain a current listing of employees, providing updates as changes occur. The contract manager or alternate shall be proficient in English and have a good understanding of the requirements pertaining to this contract for interpretation and implementation of directives (written and oral), issued in English by the KO or COR. If the contract manager or alternate do not meet these requirements, the contractor shall provide a translator for them. The contractor manager shall be present during the entire installation and removal periods.

2.1.2. Contractor Employees. Contractor personnel shall be easily recognizable as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which contain the contractor’s company name and the employee’s name. The contractor shall ensure personnel have the appropriate license and certifications for each trade

(i.e. fire protection, electrical, plumbing, etc.) and be able to provide a copy of the license upon COR request.

2.1.3. Removal of Contractor’s Employees. The contractor shall utilize only experienced, responsible and capable employees in the performance of this contract. The KO may require that the contractor remove any of his/her employees who endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of the U.S. Government.

2.1.4. Other Country Nationals (OCN). The security forces on each base control entry to the base.

Under certain circumstances, the OCN might be denied entry. It is the contractor’s responsibility to coordinate with security forces at each base when there is a question about particular entry circumstances.

2.1.5. U.S. Government and/or Master Labor Contract Employees. The contractor shall not hire employees of the U.S. Government and/or Government of Japan Master Labor Contract employees in violation of the Procurement Integrity Act. See FAR 3.104. Furthermore, the contractor shall not employ any Department of Defense employee, either military or civilian, unless such person seeks and receives approval in accordance with Department of Defense 5500.7-R, Joint Ethics Regulation.”

2.1.6. Military Personnel. The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station (PCS), change in duty hours, or deployment.

Military Reservists and National Guard members may be subject to recall to active duty. Abrupt absence of these personnel could adversely affect contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for non-performance under this contract.

2.2. QUALITY CONTROL. The contractor shall utilize its existing quality control program to ensure the services are performed IAW commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of defective services. At a minimum, the contractor shall develop quality control procedures addressing the areas identified in paragraph 2, Services Summary.

2.3. QUALITY ASSURANCE. The government will evaluate the contractor’s performance IAW the

Quality Assurance Surveillance Plan (QASP) by appointing a COR to monitor performance to ensure services are received.

2.4. GOVERNMENT REMEDIES. The KO shall follow FAR 52.212-4, Contract Terms and Conditions-

Commercial Items, for the contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

2.5. CONTRACTING OFFICER (KO) AUTHORITY. Only the KO has authority to enter into, administer, terminate or modify the terms and conditions herein. Any changes made by persons other than the KO will be considered an unauthorized commitment and subject to ratification actions in accordance with FAR 1.602-3.

2.6. CONTRACTING OFFICER’S REPRESENTATIVE (COR). The contractor shall coordinate all aspects of this requirement with the COR. Completed work shall be subject to inspection and acceptance by COR. This designation will be made in writing by the KO at the time of contract award, or prior to commencement of COR duty. The COR shall NOT direct or redirect any contractor action(s). This can only be done by the KO.

2.7. AVAILABILITY OF FACILITY.

2.7.1. Hours of Service. The contractor’s personnel will perform scheduled work on weekdays, Monday through Friday (exclusive of the U.S. legal and other designated holidays listed below), during normal duty hours, 0700 - 1700 hours unless prior arrangements have been made with the CORs.

2.7.2. Legal American Holidays and Other Designated Holidays.

American Holidays

1 January New Year’s Days

3rd Monday in January Martin Luther King Jr.’s Birthday

3rd Monday in February President’s Day

Last Monday in May Memorial Day

4th of July* Independence Day

1st Monday in September Labor Day

2nd Monday in October Columbus Day

11 November* Veterans Day

4th Thursday in November Thanksgiving Day

25 December* Christmas Day

Other Designated Holidays

11 August Mountain Day

1, 2 & 3 January New Year’s Days

29, 30 & 31 December Year End Days

*Holidays falling on a Saturday will be observed on the preceding Friday, and holidays falling on a

Sunday will be observed on the following Monday.

2.8. SECURITY AND SAFETY REQUIREMENTS.

2.8.1. Installation/Base Passes. The U.S. Government will issue all required Installation/Base Passes and Controlled Area Badges to contractor personnel at no cost to the contractor. Vehicle insurance certificates are required to obtain Base Passes and must cover the automobile liability insurance in the types and minimum amounts of (a) Bodily Injury - ¥30,000,000 per person per occurrence, in addition to the Japanese Compulsory Insurance (JCI), and (b) Property Damage - ¥3,000,000 per occurrence. The prime contractor shall be responsible for all passes issued to his/her own or subcontractor’s employees under this contract. The contractor shall return all applicable passes upon termination of employment or completion of this contract to the Japanese Pass Section, and a certificate of receipt shall be obtained.

NOTE: Contractor personnel are required to comply with U.S. Air Force instructions for personnel pass requirements. Contractors are also required to comply with U.S. Air Force instructions for vehicle pass requirements. These regulations are available for the selected contractor’s review upon personnel and/or vehicle pass issuance.

2.8.2. Security Requirements. The contractor shall ensure each employee obtains all the required passes and identification items for access to U.S. Government’s installations. These items are issued by the

Security Forces Pass and Registration Section. The contractor and employees shall return identification cards to Security Forces within 24 hours of termination or completion of this contract. All other

Government identification for terminated employees shall be returned to the KO within 24 hours of termination.

2.8.3. Off Limit Signs. The contractor shall provide warning and/or ”OFF LIMITS” signs in both

English and Japanese and post them at the entrances of jobsite, and barricades around the jobsite while the equipment and/or systems are being serviced. The contractor shall control all personnel desiring access into jobsite areas when work is in progress.

2.8.4. Photography Permission. The contractor shall obtain COR approval prior to commencing any photography.

2.8.5. Reports of Damages, Destruction, Injury, or Death

2.8.5.1. The contractor shall report all incidents of damage or destruction to property, or personal injury or death to any person, arising out of and during the performance of this contract. The term “property” includes equipment, freight, or property of any type, whether Government owned or not. The term

“contractor” includes the contractor, its agents, servants or employees.

2.8.5.2. The contractor shall submit these reports to the KO through the COR as follows:

(a) A preliminary report shall be made as soon as practicable after the time the incident occurs. The report may be either verbal or facsimile.

(b) A complete written report shall be submitted within 4 days (96 hours) after occurrence of the incident. A copy of this report shall be furnished to the COR.

2.8.6. Security Danger Warning, Accident Prevention, Fire Prevention and Fire Protection

Requirements. The contractor shall comply with all pertinent requirements of the Occupational Safety and Health Administration basic requirements or laws of Japan, whichever is more stringent, to ensure compliance by all subcontractors.

2.8.7. Environmental Regulations. The contractor shall comply with all U.S. Government and Japanese environmental laws (whichever are most stringent) to protect the health and safety of employees/ residents, and preserve the local and global environment. The contractor shall comply with the Japan

Environmental Governing Standards (JEGS) and shall minimize or eliminate environmental pollution and energy/utility waste.

2.8.8. Delivery and Storage of Materials. All materials delivered and placed in storage shall be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminants by the contractor.

2.8.9. Disposal of Materials. All debris and unserviceable materials generated under this contract such as industrial waste, non-recyclable materials and equipment/material not listed on hand-receipts shall be disposed of off-base by the contractor in accordance with the laws of Japan. Hand receipt items require turn-in action by the contractor when the listed items have to be replaced.

2.8.10. Responsibility for Damages. Any damages caused to U.S. Government property during the course of performing this contract shall be restored, replaced and/or repaired to its original condition at no additional cost to the U.S. Government.

2.9. CLEANLINESS. The contractor is responsible for cleanliness of the service areas. This includes, but is not limited to, washing, sweeping, dusting and other janitorial services necessary to maintain the area in a clean and sanitary condition. The contractor shall furnish such supplies as required.

2.10. CONSERVATION OF UTILITIES. The contractor shall instruct employees in utility conservation practices. The contractor shall be responsible for operating under conditions, which preclude the waste of utilities. The contractor shall comply with additional energy policies upon notification by the KO.

SECTION 2

SERVICES SUMMARY

The following Services Summary identifies the performance objectives and performance thresholds for critical tasks associated with providing support services for this requirement. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. As a general rule, defects are categorized as follows: (1), ‘Major’ defects that present significant safety or health hazards to customer or contract employees (e.g.

improperly braced or attached exterior stairs) and (2), ‘Minor’ defects that though inconvenient or annoying, do not impede or delay mission accomplishment (e.g. missing light fixture or plug receptacle).

Performance Objective

PWS

Para Performance Threshold Method of Assessment

SS#1: Installation 1.2.

15 minor defects (punch list items) are allowed during installation

(must be corrected). Zero (0) major defects allowed (must be corrected).

Customer Complaints;

Periodic Inspection

SS#2: Electrical

Installation 1.3.

Three (3) minor defects allowed per period of performance (must be corrected). Zero (0) major defects allowed

100% Inspection

SS#3: Submittals 1.4. One (1) late deliverable allowed 100% Inspection

Note: 100% Inspection for SS#2 though SS#3 is not intended for seeking 100% perfection in the contractor’s performance, but the stated objectives are all to be inspected by the Government (COR).”

SECTION 3

APPENDIX

Appendix A –Aircraft Maintenance Offices and Shops

FUSSA

AKIRUNO

HAMURA MIZUHO

YOKOTA

AIR BASE

AKISHIMA

OUME LINE

ITSUKAICHI LINE

HACHIKO LINE

TO

KY

O

BE

LT

W

AY

OUM

E LINE

HACHIKO

LINE

PROJECT SITE

MUSASHIMURAYAMA

HAIJIMA LINE

TO

KYO

BELTWAY

YOKOTA AIR BASE

JAPAN

JM

B

JM

B

JL

L

W

JK

/1

8/

VICINITY MAP

LOCATION MAP

NOT TO SCALE

SCALE: 1:30000

FY

M

IS

C

EL

LA

N

EO

U

S O

M

PN

, Y O

K O

TA

A

IR

B

A

SE

, J A

PA

N

SI

TE

P R

EP

T

EM

P

SQ

U

A D

O

PS

F A

C

IL

IT

Y

1 2 3 4 5

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

C

KD

B Y:

Mobile District

US Army Corps of Engineers ®

IS

O

A

M

4F R

M O

BI

LE

D

IS

TR

IC

T

D

C

B

A

C

AD

D C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

O C

TO

BE

R

- W

2H V-

-C

-0

LO

C

AT

IO

N

A N

D V

IC

IN

IT

Y

M

AP

S

C -0

FR

.d w g

C-001 3 19

ALL DIMENSIONS AND/OR DIMENSIONS

SHOWN IN CALLOUTS/NOTES ARE IN

MILLIMETERS UNLESS OTHERWISE NOTED.

SCALE:

1 : 30000

1200000600000

PLAN NORTH

PLAN NORTH

AS-AWARDED

1141098868A Typewritten Text Temporary Squadron Operations

Feb 2018 Air Force Comprehensive Plan Map A-1; Installation Area Map

Installation Layout Yokota Air Base, Japan

DEPARTMENT OF THE AIR FORCE

Document Path: T:\CENME\1. Maps\Map Templates\Yokota A1 Installation Layout E-size 34x44.mxd

This map was developed by the Geo Integration Office, 374CES/CENME, 225-3284 E-mail: 374ces.geobase@us.af.mil

A-1Map View

Created:

Magnetic Declination: 7.50° West of True North

0 500 1,000250 Meters

0 1,000 2,000500 Feet

1:4,800Scale:

The geospatial information displayed on this map has been compiled using photogrametric methods based on aerial photography ranging from January 2000 to November 2015.

Updates are being performed using resource grade GPS equipment.

Map Projection:

Datum:

Units:

Spheroid (Ellipsoid):

Universal Transverse Mercator UTM Zone 54 North

WGS 84

Meters

WGS 84

Legend Walls

DD DD Fences ! ! ! Gate

Railroad

Installation Boundary

Aviation Tower

CATM Range

Fire Training Area

Dirt Boys Training Area

Motercycle Training Area

Building

Recreation Shelter

Bus Shelter or Bike Rack

Carport

Overhead Shelter

Water Tank

Pond or Sump

Storm Drainage Basin

Recreation Area

Playgrounds

Yokota Running/Biking Trail

Bunker

Putting Green

Fairway

Golf Course

Foot Bridge

Road Bridge

Sidewalks

Roads

Driveway

Vehicle Parking

Airfield Arm/Dearm Pad

Helipad

Hot Cargo Pad

Overrun

Parking, Apron

Runway

Shoulder

Taxiway

1151494559A Oval

1151494559A Line

1151494559A Text Box

HANGAR 1

1151494559A Oval

1151494559A Line

1151494559A Text Box

B584 AREA

SDx SDx SDx SDx

SD

x

SDx

SD

x

SD

x

SDx

SDx SDx

SDx SDx

SDx SDx

SDx SDx

SDx

SDx

SDx

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X

TUNNER STREET

D

AVIS STR

EET

BUILDING

BUILDING

CONCRETE

HARDSTAND

ASPHALT

ASPHALT

ASPHALT

ASPHALT

SHELTER

SCREEN FENCE

SCREEN FENCE

C H

AI

N

-L

IN

K

FE

N C

E

SCREEN FENCE

BUILDING

GRASS

GRASS

GRASS

CURB AND GUTTER

C O

N C

R

ETE

C O

N C

R

ETE

RUNNING TRACK

ASPHALT PARKING

Cx

Cx

Cx CxCxCx

C x

C x

C

C x

C x

C x

C x

Cx Cx

Cx

Cx Cx

C x

C x

C x C x

Cx

Ex

Ex Ex

ExEx x

E x

Ex

Ex Ex

ExEx x

E x x

E x

E x

E x

E x

E x

E x

Ex ExEx

E x

E x

E x

E x

E x

Ex ExEx

Ex

Ex

E x

E x

E x

E x

E x

Ex

Ex Ex

ExEx x

E x

Ex ExEx Ex ExEx

Ex

Ex x

E x

Ex ExEx

E x

E x

E x

E x

E x

Ex ExEx

Ex

Ex Ex

Ex Ex

ExEx

Ex

Ex Ex

Ex Ex

Ex

E x

E x

E x

E x

E x

Ex

Ex x

E x

Ex ExEx

E x

E x

E x

E x

E x

SS

x

SS

SS

x

SS

x

SS

x

SSx SSx SSx

SSx SSx SSx SSx SSx SSx SSx

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SSx

SS

x

SS

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

SS

x

W x

W x

W x

W x

W x

W x

Wx

Wx

Wx

W x

W x

Wx W x

W x

W x

W x

W x

W x

W x

W x

Wx

Wx

Wx

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

Wx Wx

Wx

W x

Wx

W x

Wx Wx

Wx Wx

Wx Wx

Wx Wx

Wx Wx

Wx Wx

Wx

W x

W x

W x

W x

W x

W x

WxWx

Wx Wx

Wx

Wx Wx

W x

W x

W x

W x

W x

W x

W x

W x

W x

W x

Wx

Wx

W x

Wx

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SDx

SD

x

D

D D

D

D

D

D

D

D

D

D

D

D

D

D

D

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

T

T

T

T

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SDx

SDx SDx

SDx SDx

SDx SDx

SDx

SDx

OWS

SD

x

O W

S

TRENCH

TRENCH

TRENCH

TR

EN

C H

132.0

132.5

132.5

2.

2.

2.

5000 7700 5000 5000 7700 5000

9 SP.@ 2500EA.=22500

10SP.@

2500 EA.=25000

11 SP.@

2500 EA.=27500

54 PARKING SPACES

10 SP.@

2500 EA.=25000

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

MIN.

SI

TE

P

LA

N

C S1

FR

.d w g

CS101

J.

M

.B

J.

M

.B

J.

L.

L.

W .J

.K

/1

8/

SCALE:

1 : 300

120006000

PLAN NORTH

NOTES:

1. SEE SHEET C-003 FOR LEGEND AND GENERAL NOTES.

SITE PLAN

SCALE: 1:300

FY

M

IS

C

EL

LA

N

EO

U

S O

M

PN

, Y O

K O

TA

A

IR

B

A

SE

, J A

PA

N

SI

TE

P R

EP

T

EM

P

SQ

U

A D

O

PS

F A

C

IL

IT

Y

1 2 3 4 5

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

C

KD

B Y:

Mobile District

US Army Corps of Engineers ®

IS

O

A

M

4F R

M O

BI

LE

D

IS

TR

IC

T

D

C

B

A

C

AD

D C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

O C

TO

BE

R

- W

2H V-

-C

-0

FUTURE MODULAR

BUILDING UNIT

BY OTHERS (N.I.C.)

. CS502

FE6-1830-DO-RA-7.5

DOUBLE SWING GATE

. CS501

FE6-TR-1830 CHAIN-LINK FENCE

. CS503

PRECAST PCC BUMPER

TYP.

. CS503

PARKING SPACE

TYP.

. CS503

BOLLARD

. CS503

BOLLARD

. CS502

FE6-1830-SO-RA-1.5

PERSONNEL GATE

9 19

ALL DIMENSIONS AND/OR DIMENSIONS

SHOWN IN CALLOUTS/NOTES ARE IN

MILLIMETERS UNLESS OTHERWISE NOTED.

AS-AWARDED

1141098868A Stamp

1141098868A Typewritten Text Provided by another contract

4.572 m/15 ft 4 .5 m

/1 f t

.0 m

/1 f t

CC Office &

CC Conference

Room

B103

27.87 m2

DO Office

B105

13.94 m2

Tactics & Intel

B106

57.48 m2

Open Office Area

B107

264.23.354 m2

SARM

B102

9.29 m2

Comm & Mech

B110

10.45 m2

Squad

Conference

Room

B104

41.8 m2

CC Reception

B101

9.29 m2

9.144 m/30 ft

.5 m

/1 ft

4.572 m/25 ft

.5 m

/5 ft

.0 m

/9 .7 ft

15.24 m/50 ft

4.572 m/15 ft

.5 m

/1 ft

OPS Desk

B102

9.29 m2

OPS Super

B104

41.8 m2

CEM Office

B105

13.94 m2

CCV/SE Office

B105

13.94 m2

Mission Planning

B106

57.48 m2

MISC

B104

41.8 m2

.0 m

/1 f t

.0 m

/1 f t

.0 m

/1 f t

.0 m

/1 .5

.0 m

/2 f t

4.572 m/17.5 ft 4.5 m/7.5 ft

Water/Sewer Tie In Locations

From CE

EXISTING POLE MOUNTED COMM. CABLE

EXISTING UNDERGROUND PRIMARY FEEDER CIRCUIT TO REMAIN

OVERHEAD 3Ø PRIMARY, SEE RISER

EXISTING OVERHEAD PRIMARY TO REMAIN

UNDERGROUND COMMUNICATIONS

EXISTING OVERHEAD SECONDARY TO REMAIN

UC

EOC

US

UP

EUP

OP

EOS

EOP

EUS

OS

POLE MOUNTED COMMUNICATIONSOC

EXISTING UNDERGROUND COMMUNICATIONS CABLEEUC

NEW POWER POLE, SIZE AND HEIGHT INDICATED

POLE MOUNTED TRANSFORMER; SEE RISER E-601 FOR SIZE.

EXISTING POLE, LETTER "R" INDICATES TO BE REMOVED

NEW DOWN GUY AND ANCHOR

EXISTING MANHOLE, "E" INDICATES ELECTRICAL, "C" COMMUNICATIONS

EXISTING HANDHOLE, "E" INDICATES ELECTRICAL, "C" COMMUNICATIONS

EXTERIOR

ELECTRICAL LEGEND

NOTE:

NOT ALL SYMBOLS IN THIS LEGEND APPEAR ON THESE DRAWINGS.

TELECOMMUNICATIONS MAIN GROUND BARTMGB

PROTECTED ENTRANCE TERMINALPET

A

AC

ADA

AFF

AL

1/C C

CB

CKT

CU

EF

EMT

EWC

FACP

FM

GFI

GFP

HACR

HP

HPS

HT

HZ

IDS

J

KWH

LED

MCB

MH

MLO

MTD

NEC

NF

NO.

OS

PH

PIR

RGS

SM

TTB

TV

TVSS

UNO

V

VA

VVD

W

WP

XFMR

ABBREVIATIONS

WC

IR

MTS

ATS

NLT

AMPERE

ABOVE COUNTER, 1070mm AFF UNLESS OTHERWISE INDICATED

AMERICANS WITH DISABILITIES ACT

ABOVE FINISHED FLOOR

ALUMINUM

ONE CONDUCTOR

CONDUIT

CIRCUIT BREAKER

CIRCUIT

COPPER

EXHAUST FAN

ELECTRICAL METALLIC TUBING

ELECTRIC WATER COOLER

FIRE ALARM CONTROL PANEL

FREQUENCY MODULATION

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT PROTECTION

HEATING AIR CONDITIONING REFRIGATION

HORSEPOWER

HIGH PRESSURE SODIUM

HEIGHT

HERTZ

INTRUSION DETECTION SYSTEM

JUNCTION BOX

KILOWATT HOUR

LIGHT EMITTING DIODE

MOLDED CASE CIRCUIT BREAKSR

METAL HALIDE

MAIN LUGS ONLY

MOUNTED

NATIONAL ELECTRICAL CODE

NON FUSED

NUMBER

OCCUPANCY SENSOR

PHASE

PASSIVE INFRARED

RIGID GALVANIZED STEEL

SINGLE MODE

TELEPHONE TERMINAL BOARD

TELEVISION

TRANSIENT VOLTAGE SURGE SUPRESSOR

UNLESS NOTED OTHERWISE

VOLT

VOLTAMPERE

VARIABLE VOLUME DAMPER

WATTS

WEATHERPROOF & GFI

TRANSFORMER

WATER COOLER

INFARRED HEATERS

MANUAL TRANSFER SWITCH

AUTOMATIC TRANSFER SWITCH

NOT LESS THAN

C

PG

KR

B

D D

C

W

JK

/1

8/

FY

M

IS

C

EL

LA

N

EO

U

S O

M

PN

, Y O

K O

TA

A

IR

B

A

SE

, J A

PA

N

SI

TE

P R

EP

T

EM

P

SQ

U

A D

O

PS

F A

C

IL

IT

Y

1 2 3 4 5

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

C

KD

B Y:

Mobile District

US Army Corps of Engineers ®

IS

O

A

M

4F R

M O

BI

LE

D

IS

TR

IC

T

D

C

B

A

C

AD

D C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

O C

TO

BE

R

- W

2H V-

-C

-0

NOTES:

1. CONDUCTORS RATED 600V AND BELOW SHALL BE EM-IE TYPE.

2. CONDUCTORS RATED 6.6kV AND HIGHER SHALL BE EM-CET TYPE.

3. CONDUIT FOR EXTERIOR DIRECT BURIAL APPLICATIONS SHALL BE TYPE

FEP (UNDER NON-PAVED AREAS) OR PLASTIC COATED RIGID STEEL, TYPE

PE (UNDER PAVED AREAS).

4. CONDUIT FOR EXTERIOR CONCRETE ENCASED APPLICATIONS SHALL BE

PVC.

13 19

ALL DIMENSIONS AND/OR DIMENSIONS

SHOWN IN CALLOUTS/NOTES ARE IN

MILLIMETERS UNLESS OTHERWISE NOTED.

AS-AWARDED

BUILDING

C

US TX

C

PG

KR

B

D D

C

W

JK

/1

8/

FY

M

IS

C

EL

LA

N

EO

U

S O

M

PN

, Y O

K O

TA

A

IR

B

A

SE

, J A

PA

N

SI

TE

P R

EP

T

EM

P

SQ

U

A D

O

PS

F A

C

IL

IT

Y

1 2 3 4 5

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

C

KD

B Y:

Mobile District

US Army Corps of Engineers ®

IS

O

A

M

4F R

M O

BI

LE

D

IS

TR

IC

T

D

C

B

A

C

AD

D C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

O C

TO

BE

R

- W

2H V-

-C

-0

PLAN NORTH

ELECTRICAL & COMMUNICATIONS SITE PLAN

SCALE: 1:300

14 19

ALL DIMENSIONS AND/OR DIMENSIONS

SHOWN IN CALLOUTS/NOTES ARE IN

MILLIMETERS UNLESS OTHERWISE NOTED.

8 8

SCALE:

1 : 300

120006000

5m m

5m m

SUSPENSION

INSULATORS

RIGID

CLEVIS

GUY WIRE

16mm GALVANIZED

CONDUIT

MOLDING

GRADE

GROUND ROD

PIN

INSULATORS

CROSSARMS

22mm² BARE COPPER

GROUND WIRE

PLAN

SPOOL

INSULATOR

INSULATED

ELEVATION

EXISTING

50HZ LINES

EXISTING

60HZ LINES

m m m m

NOTE: MAINTAIN MINIMUM 300mm CLEARANCE

BETWEEN HORIZONTAL CONDUCTORS.

SCALE:A N.T.S.

POLE DETAIL

LATERAL - SEE RISER

MATCH SECONDARY

RISER - SIZE TO

STEEL CONDUIT

RIGID GALVANIZED

C

Y

150mm

K

U

T B

A I

I

CC

Q

P

Q

Q

C Q

CC

SHALL BE 208Y/120V

SECONDARY CONNECTION

C

D

C

Q

1420mm

760mm

FUSE CUTOUT, 100 A, LOAD BREAK TYPE

GUY GRIP, PREFORMED FOR GUY WIRE

JJ

EX

HH

GG

FF

EE

DD

CC

BB

AA

WEATHERHEAD

INDICATES EXISTING - MAY BE REUSED

TRANSFORMER MOUNTING HARDWARE

SUSPENSION CLAMP

POLE MOUNTED DISTRIBUTION TRANSFORMER

CLUSTER MOUNT TRANSFORMER MOUNTING BKT, 3 PHASE

DEVICE MOUNTING BRACKET, SINGLE FOR WOOD ARM

PIN FOR WOOD XARM WITH 15mm HOLES 2440mm XARM, 6 PIN, WOOD WITH STEEL XARM BRACES

CONDUIT SEALING BUSHING

HOT LINE CLAMP

Z Y X W V U T S R Q P O N M L K J I H G F E D C B A

DOUBLE ARM BOLT, LENGTH AS REQUIRED, 15mm BRACKET, 1 PHASE CANTILEVER, VERTICAL PIN TYPE, 510mm

CONDUIT SEALING BUSHING

GUY HOOK

RISER CONDUIT, 103mm GALVANIZED RIGID STEEL

CABLE TERMINATOR, AS SPECIFIED

LIGHTNING ARRESTER, AS SPECIFIED

BRACKET, 3 PHASE COMBINATION, STEEL CHANNEL, 1220mm

SPOOL INSULATOR, PORCELAIN

BRACKET, 2 PHASE, VERTICAL PIN TYPE, FIBERGLASS

POLE TOP PIN, SPRING STEEL, 455mm, 25mm LEAD THREAD FIBERGLASS XARM PIN, 230mm FOR STEEL ARM

GUY WIRE AS SPECIFIED

GUY HOOK FOR STRAIN INSULATOR

CROSS ARM, STEEL CHANNEL, 1525mm GUY TYPE STRAIN INSULATOR 3660mm

PIN TYPE INSULATOR

HORIZONTAL FIBERGLASS PIN, STAND OFF TYPE

GUY ASSEMBLY, INCLUDES T, U, AND K

GROUND WIRE TO DRIVEN GROUND ROD

COMPRESSION CLAMP, AS REQUIRED FOR CONDUCTOR

STRAIN CLAMP, AS REQUIRED FOR CONDUCTOR

STRAIN INSULATOR, 2 REQUIRED

POLE LINE HARDWARE

FF

JJ

HH

HH

SCALE:B N.T.S.

POLE DETAIL

2440mm STEEL CHANNEL

CROSSARM

S

JJJJ

NEUTRAL JUMPER

TO SECONDARY

B

C

SIDE REAR

RISER - SEE RISER

STEEL CONDUIT

RIGID GALVANIZED

GRADE

915mm

50mm UNISTRUT GALV

150mm X 50mm GALV

CONCRETE

2135mm

COMM CABINET

4200mm

PANEL "MDP"

915mm X 610mm X 150mm

METER

SCALE:C N.T.S.

SERVICE RACK DETAIL

NOTES:

PANEL P2

NOTES:

1. ALL DEVICES SHALL BE RATED FOR USE IN 6.6kV SYSTEM.

2. ALL DEVICES ARE NEW UNLESS NOTED OTHERWISE.

3. COMPONENTS SHOWN MAY BE SUBSTITUTED FOR APPROVED JAPANESE EQUIVALENT.

4. THE ABOVE IS NOT A BILL OFF MATERIAL. THE ITEMS LISTED ARE A PART OF THE

CONTRACT DRAWINGS TO THE EXTENT REFERENCED OR SHOWN ON THE DRAWINGS.

MATERIALS REQUIRED TO COMPLETE CONSTRUCTION SHALL BE FURNISHED EVEN IF

NOT SHOWN OR CALLED FOR ON THE DETAILS. CONFLICTS BETWEEN DETAILS AND

ANSI C2 SHALL BE RESOLVED IN FAVOR OF ANSI C2.

1. ALL ENCLOSURES SHALL BE RATED NEMA 3R OR JAPANESE EQUIVALENT.

2. SEE RISERS ON SHEETS E-601 AND E-602 FOR CONDUIT SIZES.

14 METER CLASS G

CONCRETE POLE

14 METER CLASS G

CONCRETE POLE

C

PG

KR

B

D D

C

W

JK

/1

8/

FY

M

IS

C

EL

LA

N

EO

U

S O

M

PN

, Y O

K O

TA

A

IR

B

A

SE

, J A

PA

N

SI

TE

P R

EP

T

EM

P

SQ

U

A D

O

PS

F A

C

IL

IT

Y

1 2 3 4 5

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

C

KD

B Y:

Mobile District

US Army Corps of Engineers ®

IS

O

A

M

4F R

M O

BI

LE

D

IS

TR

IC

T

D

C

B

A

C

AD

D C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

O C

TO

BE

R

- W

2H V-

-C

-0

15 19

ALL DIMENSIONS AND/OR DIMENSIONS

SHOWN IN CALLOUTS/NOTES ARE IN

FINISH GRADEEXISTING ASPHALT

BACKFILL

150mm MIN.

MATCH EXISTING,

BASE COURSE TO

NEW AGGREGATE

COURSE

EXISTING BASE

CONDUIT (TYP.)

105mm THIN WALL PVC

SUBGRADE

EXISTING

EXCAVATION

5m m (M

IN

NON-PAVED AREA

THICKNESS (75mm MIN.)

MATCH EXISTING ASPHALT

BEYOND EXCAVATION WALL

NEW PAVEMENT, 150mm MIN.

PAVED

& 50mm CROWN AT NON-PAVED

305mm BELOW FINISH GRADE W/TRACE CONDUCTOR 150mm WARNING TAPE APPROX.

AREAS

ADD 15mm CROWN AT PAVEMENT

3000 PSI CONCRETE

O R

A S

O

TH

ER

W

IS

E

N O

TE

D

SCALE: N.T.S.

DUCTBANK DETAILA

COMM DUCT

ELECTRICAL DUCT

14mm² TO OSP

CONDUITS AND PET

PROVIDE TWO HOLE BOLTED

CONNECTORS WITH GROUND

RATED BELLEVILLE WASHERS

BETWEEN BUS AND

CONNECTOR. PROVIDE

CONDUCTIVE GREESE

BETWEEN BUS AND

COONNECTIONS. PROVIDE

FULL WRAP STRAP

CONNECTORS. CLAMPING OF

THE STRAPS SHALL BE WITH

FULL SURFACE CLAMPING

TOOL TO INSURE EVEN

COMPRESSION AROUND THE

CABLE.

TMGB SIZE

100mm H x 6 mm D x MIN.

305 mm L

TMGB

SCALE: N.T.S.

MAIN GROUND BAR DETAILB

TELECOMMUNICATIONS

75mm

(MIN)

THIS DETAIL IS TYPICAL FOR ALL UNDERGROUND CONDUITNOTE:

PVC CONDUIT ENCASED

PVC TO STEEL

ADAPTER

IN CONCRETE

CONDUIT

RIGID STEEL

FINISHED

GRADE

SCALE: N.T.S.

PVC TO STEEL CONDUIT CONVERSIONC

C

PG

KR

B

D D

C

W

JK

/1

8/

FY

M

IS

C

EL

LA

N

EO

U

S O

M

PN

, Y O

K O

TA

A

IR

B

A

SE

, J A

PA

N

SI

TE

P R

EP

T

EM

P

SQ

U

A D

O

PS

F A

C

IL

IT

Y

1 2 3 4 5

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

C

KD

B Y:

Mobile District

US Army Corps of Engineers ®

IS

O

A

M

4F R

M O

BI

LE

D

IS

TR

IC

T

D

C

B

A

C

AD

D C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

O C

TO

BE

R

- W

2H V-

-C

-0

16 19

ALL DIMENSIONS AND/OR DIMENSIONS

SHOWN IN CALLOUTS/NOTES ARE IN

GRADE

NEW POLE MOUNTED

TRANSFORMER

200kVA 50Hz 3ɸ PRIMARY: 6.6/3.3kV

SECONDARY: 208/120V

PRIMARY TAP

EXISTING 50Hz PRIMARY

NEW 14 METER

CONCRETE POLE

NEW 14 METER

CONCRETE POLE

GROUND ROD

19mm DIAMETER X 3050mm L (MINIMUM)

CT METER

PANEL

MDP

600A

PANEL

P2

200A

SERVICE RACK.

SEE SHEET E-501 DETAIL C

CONDUCTOR & CONDUIT SCHEDULE:

4 - 38mm² ACSR

2 SETS (4 - 200mm², G104 C)

2 SETS (4 - 200mm², 105mm CONCRETE ENCASED PVC)

SEE SHEET E-502 DETAIL A.

4 - 14mm², G28 C

4 - 14mm², PE28 C

1 - 60mm² G

4 - 100mm², 1 - 14mm² G, E75 C

EXISTING POLE 5-55

150mm MIN

C

PG

KR

B

D D

C

W

JK

/1

8/

FY

M

IS

C

EL

LA

N

EO

U

S O

M

PN

, Y O

K O

TA

A

IR

B

A

SE

, J A

PA

N

SI

TE

P R

EP

T

EM

P

SQ

U

A D

O

PS

F A

C

IL

IT

Y

1 2 3 4 5

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

C

KD

B Y:

Mobile District

US Army Corps of Engineers ®

IS

O

A

M

4F R

M O

BI

LE

D

IS

TR

IC

T

D

C

B

A

C

AD

D C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

O C

TO

BE

R

- W

2H V-

-C

-0

ELECTRICAL RISER

SCALE: N.T.S.

NOTES:

3. ALL ITEMS SHOWN ON RISER ARE NEW UNLESS LABELED "EXISTING".

4. SEE SHEET E-502 DETAIL C FOR PVC TO STEEL CONDUIT CONVERSION DETAIL.

17 19

ALL DIMENSIONS AND/OR DIMENSIONS

SHOWN IN CALLOUTS/NOTES ARE IN

GRADE

NEW CONCRETE POLE

50 PAIR

NEW CONCRETE POLE

SERVICE RACK.

SEE SHEET E-501 DETAIL C

KEYNOTES:

COMMUNICATIONS CABINET IN BUILDING 584 COMM ROOM BEING

PROVIDED BY PN 46902 REPAIR BUILDING 584.

EXISTING CABINET WITH COPPER TERMINAL.

CONDUIT PROVIDED BY PN 46902 REPAIR BUILDING 584.

WEATHERHEAD PROVIDED BY PN 46902 REPAIR BUILDING 584.

20M FIBER LOOP

EXISTING POLE 5-55

OSP COPPER

24 PAIR

OSP SM FOC

COMM CABINET

PET

110 BLOCK

EXISTING POLE 5-53

BUILDING 584 EXTERIORBUILDING 584 COMM ROOM

COMM

CABINET

3 4

2 - G104 C

2 - 105mm CONCRETE ENCASED PVC

2 - G104 C

24 PAIR

OSP SM FOC

PET

50 PAIR

OSP COPPER

50 PAIR

OSP COPPER

SEE SHEET E-502 DETAIL A

TMGB

SEE SHEET E-502 DETAIL B

C

PG

KR

B

D D

C

W

JK

/1

8/

FY

M

IS

C

EL

LA

N

EO

U

S O

M

PN

, Y O

K O

TA

A

IR

B

A

SE

, J A

PA

N

SI

TE

P R

EP

T

EM

P

SQ

U

A D

O

PS

F A

C

IL

IT

Y

1 2 3 4 5

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

C

KD

B Y:

Mobile District

US Army Corps of Engineers ®

IS

O

A

M

4F R

M O

BI

LE

D

IS

TR

IC

T

D

C

B

A

C

AD

D C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

O C

TO

BE

R

- W

2H V-

-C

-0

COMMUNICATIONS RISER

SCALE: N.T.S.

NOTES:

1. EXTEND 24 PAIR OSP SM FOC FROM COMM CABINET IN BUILDING 584

COMM ROOM (KEYNOTE 1) TO NEW SERVICE RACK. PROVIDE 20M

SERVICE LOOP IN NEW COMM CABINET.

2. EXTEND 50 PAIR OSP COPPER FROM TERMINAL OUTSIDE BUILDING

584 (KEYNOTE 2) TO NEW SERVICE RACK. TERMINATE COPPER ON

NEW 110 BLOCK IN NEW COMM CABINET.

3. MAINTAIN MINIMUM 1060mm CLEARANCE BETWEEN COMMUNICATIONS

LINES AND PRIMARY CONDUCTORS.

4. COORDINATE WITH EXISTING OVERHEAD COMMUNICATIONS LINES.

5. COORDINATE ALL WORK WITH 374TH COMMUNICATIONS SQUADRON.

6. SEE SHEET E-502 DETAIL C FOR PVC TO STEEL CONDUIT CONVERSION

DETAIL.

18 19

ALL DIMENSIONS AND/OR DIMENSIONS

SHOWN IN CALLOUTS/NOTES ARE IN

C

PG

KR

B

D D

C

W

JK

/1

8/

FY

M

IS

C

EL

LA

N

EO

U

S O

M

PN

, Y O

K O

TA

A

IR

B

A

SE

, J A

PA

N

SI

TE

P R

EP

T

EM

P

SQ

U

A D

O

PS

F A

C

IL

IT

Y

1 2 3 4 5

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SB

M

T

BY

SI

ZE

FI

LE

N

AM

E:

D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

C

KD

B Y:

Mobile District

US Army Corps of Engineers ®

IS

O

A

M

4F R

M O

BI

LE

D

IS

TR

IC

T

D

C

B

A

C

AD

D C

O D

E:

PL

O T

SC

AL

E:

PL

O

T D

AT

E:

O C

TO

BE

R

- W

2H V-

-C

-0

19 19

Appendix A.pdf
Appendix A - Temporary Squadron Operations (20180626) - Purchase
Appendix A - Temporary Squadron Operations (20180626) - Purchase
Appendix C - Temporary Squadron Operations (20180626)
Appendix C - Temporary Squadron Operations (20180626)
C-001FR50-C-001
Appdx A - H1 Interior_Updated
Yokota A1 Installation Layout E-size _No Bldg Nos._20180215
Appendix A - Temporary Squadron Operations (20180626) - Purchase
Appendix A - Temporary Squadron Operations (20180626) - Purchase
Appendix C - Temporary Squadron Operations (20180626)
Appendix C - Temporary Squadron Operations (20180626)
CS101FR50-CS101
Purchase - Temp Sq Ops Bldg B
Appendix A - Temporary Squadron Operations (20180626) - Purchase
Appendix A - Temporary Squadron Operations (20180626) - Purchase
Appendix C - Temporary Squadron Operations (20180626)
Pkg2_Elec_PN46906
E001FR50-E002
E002FR50-E002
E501FR50-E-501
E502FR50-E-502
E601FR50-E601
E602FR50-E602

Appendix C - Temporary Squadron Operations Water and Sewer tie In

Appendix A - Temporary Squadron Operations (20180626) - Purchase
Appendix A - Temporary Squadron Operations (20180626) - Purchase
Appendix C - Temporary Squadron Operations (20180626)
Pkg2_Elec_PN46906
E603FR50-E603

File details come from the government source that posted it.