5.Atch1_PWS_20170613.pdf
PDF 85 KB Posted
- Solicitation number
- FA520917Q1008
About this file
5. Atch1_Performance Work Statement (PWS)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30_20170719.pdf | ||
| 20170712_Q-A.pdf | ||
| Atch_20170703_QA.pdf | ||
| Pre_Con_Minutes_170710_YI.pdf | ||
| 20170703-Q-A.pdf | ||
| PWSAppndix_Replacement_Page.pdf | ||
| Exhibit_Replacement_Pages.pdf | ||
| SF30_20170706.pdf | ||
| 20170615_Q-A.pdf | ||
| 7.Atch3_PPRefList_20170613.pdf | ||
| 3.SF1449_20170613.pdf | ||
| 4.Exhibit_20170613.pdf | ||
| 8.OF-17_Offer_Label_20170613.pdf | ||
| 2.NTO_20170613.pdf | ||
| 1.GovtPlcyLtr.pdf | ||
| 6.Atch2_PP-Cvrltr_20170613.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 to Solicitation No. FA520917Q1008
PERFORMANCE WORK STATEMENT (PWS)
FOR
GENERAL TRUCKING SERVICES
BETWEEN YOKOSUKA AND IWAKUNI
FOR
CARRIER AIR WING FIVE (CVW-5)
April 2017
The attached PWS is being provided in accordance with (IAW) Section 801, 10 USC 2330. Any contract or task order resulting from this request is to be acquired using performance-based principles.
1. DESCRIPTION OF SERVICE. The Contractor shall furnish services of transporting Government freight by the Contractor provided trucks as set forth in the Pricing Schedule, in accordance with (IAW) the terms and conditions of this contract and applicable Government of Japan (GOJ) laws and trade practices. The slash “/” means “and/or” throughout this document.
1.1. AREA OF PERFORMANCE. The area of performance shall be throughout the Honshu. The point-to-point routes are specified in the Price List.
1.2. TYPES OF FREIGHT. The Contractor shall transport the following property upon order issued by the designated Callers (Caller) who serve as Ordering Officers.
1.2.1. General Freight – shall consist of all types and descriptions other than dangerous, hazardous, or sensitive freight as further defined below.
1.2.2. Dangerous Freight – shall consist of items which are applied to the GOJ “Fire Defense Law” (Law No. 186, 24 July 1948, with revisions thereto), “Poisonous and Deleterious Substances Control Law” (Law No. 303, 28 December 1950, with revisions thereto), “High Pressure Gas Safety Law” (Law No. 204, 7 Jun 1951, with revisions thereto) and other related laws/ordinances. These items must be transported IAW such laws/ordinances. An additional charge for transporting of this freight is specified in Item A06A in the Price List.
1.2.3. Hazardous Freight – shall consist of low explosive, high explosive, or such other materials of explosives listed under the GOJ “Explosives Control Law” (Law No. 149, 4 May 1950, with revisions thereto) and other related laws/ordinances. These items must be transported IAW such laws/ordinances.
Based on shipping information provided by the Caller, the Contractor shall obtain a GOJ clearance from the Prefectural Public Safety Commission responsible for the area from which the explosives are shipped, and it must be carried when the explosives are being transported. An additional charge for transportation of this freight is specified in Item A06B in the Price List. In addition, the Government shall provide special (safety) instructions including truck inspection to the Contractor’s driver(s) prior to releasing the truck loaded with explosives. Written instruction and inspection shall be bilingual to ensure driver(s) fully understand the contents. As defined in the GOJ Explosives Control Law, the following Items shall not require the GOJ clearance based on net explosive weight (NEW) or quantities specified below. They shall be defined as sensitive freight specified in paragraph 1.2.4 under the contract, however, the Contractor shall not be relieved from complying with the said laws/ordinances and instruction/inspection related to hazardous freight.
(a) Low explosives: NEW of 200 kilograms or less.
(b) High explosives: NEW of 100 kilograms or less.
(c) Blasting caps, electric and non-electric: 40,000 each or less.
(d) Small arms primer: 400,000 each or less.
(e) Detonating cord: 6 kilometers length or less.
(f) Live or blank small arms ammunition (SAA) NEW of 0.5 grams or less per round: 400,000 each or less.
(g) Live or blank SAA NEW of over 0.5 grams per round: 200,000 each or less.
(h) Other explosive materials not listed above: NEW of 100 kilograms or less.
Remarks: When transporting two or more items mentioned above on the same truck, NEW or quantity of the items shall be divided by the applicable weight or quantity specified above, and the sum of the percentages shall not exceed 100% IAW GOJ Explosives control Law and applicable ordinances. In case when the sum of the percentages exceeds 100%, a GOJ clearance is required and the items shall be transported as the hazardous freight under the contract.
Example:
Item Item NEW/Qty of shipment Allowable NEW/Qty
%-age of allowable NEW/Qty
Detonating cord 3km 6km 50%
SAA (NEW over 0.5g/round) 80,000 each 200,000 each 40%
(The sum of the percentages is 90%; therefore, detonating cord (3km) and the SAA (80,000 each) may be shipped as sensitive freight under the contract: 3 km ÷ 6 km + 80,000 each ÷200,000 each = 50% + 40% = 90%)
1.2.4. Sensitive Freight – shall consist of any freight which requires a high degree of protection while in transit as designated by the Caller. An additional charge for transporting of this freight is specified in Item A06C in the Price List. It includes explosives which do not require the GOJ clearance under the GOJ Explosives Control Law (See paragraph 1.2.3 above).
1.2.5. Dual Driver Protective Service (DDP) and Signature and Tally Record Service. The Contractor shall comply with the following when transporting freight designated as sensitive or hazardous freight by the Caller.
(a) DDP. Any truck transporting sensitive or hazardous freight shall be manned by two (2) drivers possessing applicable driver’s licenses. The truck loaded with the said freight must be attended by at least one of the two drivers in the cab of the truck and not in a sleeper berth or within 25 feet of truck at all the time during brief stops when required.
(b) Signature and Tally Record Service (DD Form 1907). In conjunction with DDP, both drivers are required to sign DD Form 1907 when they assume responsibility for the shipment.
1.3. TYPES OF TRUCKS.
1.3.1. Definition.
Size of
Truck Type of Platform/Bed
Load Capacity (Kilogram)
Remarks
Over Up through
(a) 4-ton truck
A flatbed or van/wing-type 3,000 4,000
(b) 8-ton truck
A flatbed or van/wing-type 6,000 8,000 See paragraph 1.3.2.(b) Inside Dimensions of Loading Platform/Bed.
(c) 10-ton truck
A flatbed or van/wing-type 8,000 10,000 See paragraph 1.3.2.(b) Inside Dimensions of Loading Platform/Bed.
(d) 12-ton truck
A flatbed or van/wing-type 10,000 12,000 See paragraph 1.3.2.(b) Inside Dimensions of Loading Platform/Bed.
1.3.2. Specifications for Trucks.
(a) Van/Wing-Type Truck. Van/wing-type truck shall be aluminum or stainless steel enclosed cargo compartment/body, equipped with rear and/or side cargo door(s) with latches/hasps for securing doors with a padlock or similar locking device. In addition, see paragraph (c) below.
(b) Inside Dimensions of Loading Platform/Bed.
(1) Length. 10-ton or 12-ton trucks to be used under this contract shall have a minimum loading platform/bed length of nine (9) meters.
(2) Width. 8-ton, 10-ton or 12-ton trucks to be used under this contract shall have a minimum loading platform/bed width of two point three (2.3) meters.
Note: The trucks having loading platforms/beds smaller than dimensions specified above can be dispatched only with permission from the Caller at the time of placing an order for services with the Contractor.
(c) For ammunition and explosives (AE) shipment, the Contractor shall provide trucks with wood beds when directed by the Caller. The Government will nail wood blocking and bracing to the wood truck floor in accordance with the applicable regulations at the loading points.
1.3.3. Condition of the Loading Platform. The Contractor shall provide van/wing-type trucks of any sizes defined in paragraph 1.3.1 above as ordered by the Caller for transportation of hazardous/sensitive freight or non-perishable freight. Flatbed trucks with double tarp and double tie down may be used for transportation of hazardous or sensitive freight if van/wing-type trucks are not available and the use of flatbed trucks is specifically approved by the Caller. The outer layer shall be a canvas or rain cover and must be both fire and water resistant.
1.4. SECURITY GUARDS. The Caller reserves the right to furnish security guards or military police escorts for any or all vehicles while the vehicles are engaged in the performance of services under this contract. The Contactor shall, if required by the Caller, permit one (1) security guard or escort to ride on any or all of the vehicles at no extra charge. In the event the security guard is used, the Contractor is not required to return him/her to the loading point.
1.5. SAFETY REQUIREMENTS. The Contractor shall comply with the following requirements when transporting ammunition and explosives (AE) (Reference C3.16, DOD 4145.26-M series):
1.5.1. Standard Operational Procedure (SOP). The Contractor shall submit a SOP and the written procedures required at paragraph 1.5.2 below to the Contracting Officer (KO) for written approval within 10 working days from the award of the contract. At a minimum, the Contractor’s SOP shall address the following:
(a) The specific hazards associated with the process.
(b) Indicators for identifying abnormal process conditions.
(c) Emergency procedures.
(d) Specific equipment, tools, and expendable supplies permitted for use by the drivers.
(e) The location and sequence of job steps the operator is to follow in performing the work.
(f) Instructions for spill cleanup.
1.5.2. Written Procedures. The Contractor shall develop written procedures to ensure for safe and efficient transportation of AE in motor vehicles. These procedures shall include, as a minimum:
(a) Brakes shall be set and the wheels chocked when the possibility exists that the vehicle could move during loading or unloading.
(b) AE shall not be loaded or unloaded when a motor vehicle’s engine is running, unless the engine is providing power to accessories used in the loading and unloading, such as mechanical handling equipment. If the engine is diesel powered, it may continue to run during loading or unloading of explosives except when exposed explosives are involved.
(c) Vehicles, including partly or completely loaded flatbeds, shall have the load blocked and braced to prevent shifting during transit.
(d) The operator shall not transport AE material in the passenger compartment of the vehicle.
(e) Motor vehicles transporting AE within the establishment but outside the explosives area shall bear at least two appropriate placards identifying the hazard division of the AE. These placards should be removed or covered whenever the vehicle is not loaded. Reflectorized placards are preferred.
(f) The vehicle operator shall be trained in emergency procedures to be followed in the event of a vehicle fire, breakdown, accident, damaged or leaking containers, and spilled AE material.
1.5.3. Pre-Loading Motor Vehicle Inspections. All motor vehicles used to transport AE shall be inspected daily before loading to verify:
(a) Vehicles are in a safe operating condition.
(b) Batteries and wiring are not in contact with containers of AE.
(c) Exposed ferrous metal in the interior of the vehicle body is covered with non-sparking material when scrap and bulk explosives are being transported in containers that could be damaged or when explosives could otherwise become exposed.
(d) A serviceable portable fire extinguisher of the appropriate class is carried on the motor vehicle IAW the referenced manual and the local standards.
1.5.4. Loaded Incoming Motor Vehicle Inspections.
(a) Vehicles loaded with AE shall be inspected upon arrival at remote sites. If no problems are found, vehicles may be opened for interior inspection or moved to the designated unloading location.
(b) Motor vehicles loaded with AE that are suspected of being in hazardous condition shall be moved to a suspect truck site that is separated from other potential explosion sites or exposed sites by the applicable quantity distance criteria.
(c) Vehicles shall be inspected after unloading AE to ensure that they are clean and free from loose explosives and flammable materials and that placards and vehicle certificates have been removed.
Explosives waste cleaned and removed from the floors shall be disposed of properly.
1.6. OPERATIONAL REQUIREMENTS.
1.6.1. The Contractor shall perform services when scheduled by the Caller at any time during any calendar day to meet the established loading and unloading dates and times. The Contractor is required to follow the operational definitions and requirements described below.
1.6.2. Ordering/Bill of Lading.
(a) When an order for services is placed with the Contractor, the Caller will specify the loading and unloading points, reporting time and date at loading and unloading points, size and type of truck, nature of freight, estimated weight/cubic measurement including quantity.
(b) The Caller shall issue a Bill of Lading (BL), USFJ Form 334EJ, for service provided under the contract. The Caller shall indicate terms and conditions (size/type of truck ordered, accessorial services, etc.) in remarks column of BL for which payment is due. The Caller shall provide an original BL to the Contractor in exchange for the signed receipt of shipping documents (e.g., DD Form 1384, Transportation Control and Movement Document/Supporting Document) within 15 calendar days after the shipment is completed and the Contractor submits the said shipping document.
(c) The order will be given orally and confirmed by means of a properly executed BL. In the event of original BL is known to have been lost, rendered unusable, or destroyed after the original BL is issued, a Certificate in Lieu of Lost Bill of Lading (USFJ Form 376EJ) shall be used to document the shipment. Some Accessorial Services charges will be documented by a properly executed Bill for Accessorial Services (BAS), USFJ Form 416EJ as identified at paragraph 1.6.11.
(d) Advance Notification. The Caller will place an order for service with the Contractor prior to the time frame set forth below. The term “working days” used herein covers Monday through Friday excluding U.S. legal holidays specified at paragraph 1.7.9 below.
(1) For general, dangerous, sensitive freight: The Government will place calls with the Contractor not later than 02:00 PM on the two (2) working days prior to the day service is required.
(2) For hazardous freight below.
(i) Intra-prefectural shipment under jurisdiction of one Prefectural Public Safety Commission: Three (3) working days prior to the day service is required.
(ii) Inter-prefectural shipment under jurisdiction of more than one Prefectural Public Safety Commission: Four (4) working days prior to the day service is required.
1.6.3. Repetitive Orders of Items in Distance Table. Rates at Item A06U in the Price List are to be used for unforeseen requirement only. When repetitive orders are required for a specific service under the rates indicated in the Tables, upon written request of either the Contractor or the Government, the said service shall be incorporated into the “point to point” in the Price List by way of a supplemental agreement to the contract.
1.6.4. Cost of Operation. All Costs of operation under this contract shall be borne by the Contractor, including but not limited to, tolls, licenses, costs of overtime/Sunday or holiday work, or for operations during stormy or inclement weather except those authorized by paragraph 1.6.11, Accessorial Services.
1.6.5. Government Installations – shall consist of USFJ installations, and Japan Self Defense Forces (JSDF) facilities.
1.6.6. Freight Loading Point – a shipping point designated by the Caller.
1.6.7. Freight Unloading Point – a receiving point designated by the Caller.
1.6.8. Loading and Unloading.
(1) All freight shall be loaded and unloaded by the Government. However, the Contractor shall not be relieved from the responsibility for the proper stowage and securing of freight against loss or damage while in transit.
(2) Under emergency circumstances, the loading and/or unloading hours will be 24 hours as determined jointly by the Caller and Receiving Officer. In the event, the Caller will notify the Contractor of it at the time of ordering.
1.6.9. Free Time. The Contractor shall provide free time for loading and unloading of freight at no cost to the Government for one (1) hour period for 4-ton trucks, and one (1) hour and 30 minutes period for 8-ton, 10-ton or 12-ton trucks, commencing at the time -
(a) The truck is placed by the Contractor at the freight loading point within each installation and notice thereof is given to the Caller placing orders.
(b) The truck arrives at the freight unloading point within each installation and notice thereof is given to the Caller.
1.6.10. Basis for Payment.
(a) If the Contractor furnishes a truck of larger size than that ordered due to non-availability of the ordered size, payment will be made on the basis of ordered size of truck. Payment for the larger size truck shall be authorized only when it is so stated on the BL by the Caller.
(b) In case the actual loading weight and the volume converted into the corresponding weight is less than 50% of the ordered truck size, the service shall be paid as the performance of the next smaller-sized truck specified in the Pricing Schedule. Note: One (1) cubic foot shall equal to eight (8) kilograms.
(c) In case an 8-ton truck is ordered and the actual loading weight and volume of the truck is less than 50%, the prices of 6-ton truck in the distance tables are applied to the payment under Items A06U in the Price List. Note: The prices of 6-ton truck shall be only available in conjunction with condition stated in this paragraph.
(d) When the following condition(s) is required to accomplish freight shipment, the paragraphs (b) and (c) shall not apply to the payment. The Caller will indicate the condition(s) on the BL and the payment shall be made based on the truck size as ordered.
(1) Freight cannot be stacked due to its nature/configuration.
(2) A truck having a loading platform/bed specified in paragraph 1.3.2.(b)(1)/(2) is required due to the freight dimensions.
1.6.11. Accessorial Services (Charge will be paid by BL or BAS).
(a) Retention of Loaded Truck (BAS). When specifically scheduled by the Caller, the Contractor shall leave a loaded truck in the designated Government installation for any length of period between 04:45 PM and 08:00 AM hours in conjunction with performance of transportation services under the contract. An additional charge is specified in Item A06S in the Price List.
(b) Demurrage (BAS). If through no fault of the Contractor, a vehicle is not loaded and dispatched or discharged and released within the allowable free time as specified in paragraph 1.6.9, the Contractor shall be entitled to demurrage for detention of the vehicle by the Government beyond the free time at the rate indicated in Items A06D through A06G in the Price List. For purpose of payment thereunder, the full half hourly rates shall be paid for any period of time up to and including 30 minutes.
The Contractor shall submit a request for demurrage to the Caller within thirty (30) calendar days following incurrence of the said charges. In the event the Contractor fails to submit such a request for demurrage as herein required, the Government shall be relieved from all responsibility for such a request unless the Contractor’s delay in submitting the said request is due to circumstances beyond the Contractor’s control.
(c) Use of Pay Parking Lots and Toll Roads (BAS).
(1) The Contractor is required, when directed by the Caller, to use pay parking lots at commercial airports/rail stations and toll road(s) for transportation of personal baggage in supporting unilateral/bilateral exercises.
(2) The Contractor is required, when directed by the Caller, to use toll road(s) for the transportation of sensitive freight accompanied by the Government escorts, or for expediting shipments of military freight to meet the Required Delivery Date/Time at destination.
(3) USFJ Form 334EJ shall be annotated with “Use of pay parking lot/toll roads authorized” or “Use of toll roads authorized” respectively in the “Remarks” column thereon. Actual amount will be paid to the Contractor for the use as directed by the Caller and as supported by original parking/toll road receipts under Item A06T. The Contractor is responsible for submission of original parking and/or toll road receipts in a timely manner to the Caller who will issue USFJ Form 416EJ for payment purpose.
(The parking and toll road receipts shall be filed with the No.5 copy of the USFJ Form 416EJ at the issuing transportation office.)
1.6.12. Cancellation of Requirement (Charge will be paid by BAS).
(a) Cancellation charges specified in Item A06H and A06J in the Price List shall be applied when service is scheduled and the requirement is cancelled, rescheduled or postponed after 02:00 PM on the two (2) working days prior to the day service is required.
(b) Cancellation charges specified in Item A06K and A06L in the Price List shall be applied when service is scheduled and the requirement is cancelled, rescheduled or postponed on the previous day of the performance.
(c) Cancellation charges specified in Item A06M through A06Q in the Price List shall be applied when service is scheduled and the requirement is cancelled, rescheduled or postponed on the day of the performance, whether or not the Contractor’s truck has been placed at the freight loading point. In case when the truck is held after the expiration of the free time, the Contractor shall not be paid the demurrage charge in addition to the cancellation charge.
(d) In the event the service is scheduled and the requirement is cancelled after the Contractor has obtained all clearances for transportation of hazardous freight from the Public Safety Commission(s) of GOJ, the Contractor shall be entitled to cancellation charge specified in Item A06R in the Price List by submitting evidence to the Caller. This “hazardous freight” cancellation charge is in addition to the cancellation charge payable under the provisions of paragraph (a) through (c) above. However, the cancellation charge shall not accrue when the shipment is rescheduled or postponed due to military necessity within the allowable period of the clearance certificate.
1.6.13. Calculation of Charges. Accessorial Services shown in percentages shall be calculated based on unit price listed in the Price List (including Distance Rate Tables).
(a) In case the items loaded on a truck are commingled with general/dangerous/ hazardous/sensitive freight, the charge is calculated based on the highest rate specified in the Price List.
If more than one (1) increase percentage is applicable, adjustments for such percentages will be made prior to calculation of transportation cost; e.g., if a 30% increase and 5% increase are applicable, transportation charge will be calculated by increasing the price by 35%.
1.6.14. Table of Distances.
(a) HQ U.S. Army Garrison Japan issued Military Traffic Management Bulletin (MTMB) No. 2, entitled “Official Table of Highway Distances, Japan” as revised, shall be used in computing charges for services rendered hereunder. The MTMB No.2 establishes the kilometer distance between the main gates of loading and unloading installations.
(b) For transportation of freight between points not indicated in the MTMB No.2, the Movements
Management Branch, Transportation Division, Logistics Readiness Center Honshu (LRC Honshu), 403D Army Field Support Brigade (AFSB), will measure new distance(s) upon request from the shipping Caller, and provide the distance(s) to the requesting Caller and the Contractor for computation of transportation charges.
1.6.15. Humanitarian Assistance and Disaster Relief (HADR). The scope of this contract includes services to respond to requirements in a contingency environment including humanitarian assistance and disaster relief.
1.7. GENERAL INFORMATION.
1.7.1. Quality Assurance. The Government will evaluate the Contractor’s performance by appointing a Contracting Officer’s Representative (COR) to monitor performance to ensure services are received.
The COR will evaluate the Contractor’s performance through receipt of complaints from the Caller. The
Government will evaluate all of the Contractor’s performance IAW the Quality Assurance Surveillance Plan (QASP).
1.7.2. Government Remedies. The KO will follow FAR 52.212-4, Contract Terms and Conditions- Commercial Items for the Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
1.7.3. Reserved.
1.7.4. The Callers. The Callers are authorized to place an order or schedule deliveries in the manner described herein. The Caller shall have authority to certify the performance of services by the Contractor.
A current list of Callers will be submitted to the Contractor at the pre-performance conference.
1.7.5. Obtaining Exemption of Japanese Tax and Submission of Vehicle’s Listing for Tax Exemption Certificate.
(a) The basis whereby US Armed Forces obtain exemption from Japanese taxes are prescribed in paragraph 3, Article XII of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between the U.S. and Japan.
(b) The Contractor shall be responsible for submission of the following documents to the 374th
Contracting Squadron, Yokota Air Base, Fussa-shi, Tokyo-to for verification and issuance of fuel tax exemption certificates under this contract:
(1) Fuel consumption ratios of truck by size.
(2) Accurate lists of all trucks to be used under this contract with copies of vehicle inspection certificates, and other information if required.
(c) The Contractor will submit requests for issuance of tax exemption certificates to the Tax Exemption Certifying Officer not later than 365 calendar days after receipt of an original BL (see Para 1.6.2.(b)).
(d) The Contractor shall also submit a certified statement to the Tax Exemption Certifying Officer for claiming deadhead distances for each ordered service during the performance period. The wording for the certification statement will be provided to the Contractor by the Tax Exemption Certifying Officer.
(e) The Contractor shall not include deadhead distance for trucks that owned or used by a third party. This service is not considered for official use for fuel tax exemption purposes.
(f) The Tax Exemption Certifying Officer will review the accuracy of the Contractor’s figures on fuel consumption prior to issuance of appropriate tax exemption certificate.
1.7.6. Security Safety Requirements.
(a) Installation Base Passes. For access to US Installations, the US Government will issue all required Gate Passes/Vehicle Passes to Contractor personnel at no cost to the Contractor. To obtain passes, the Contractor is required to submit documents IAW each installation instruction. The prime Contractor shall be responsible for all passes issued to his/her own or his/her subcontractor’s employees under this contract. The Contractor shall return all applicable passes upon termination of employment or completion of this contract to the Installation Pass Office.
(1) Gate Passes. In order to obtain Gate Passes, the Contractor may be required to (i) submit certificates of residence, abstracts of family registers and an ID photo, in addition to application forms which could vary depending on each installation, and (ii) make appointments at the Installation Pass Offices to take ID photos and pick up issued passes. The Contractor is responsible for the expenses and costs that they would incur in order to obtain Gate Passes.
(2) Vehicle Passes. In order to obtain Vehicle Passes, the Contractor shall submit the proof of valid liability insurance that must cover the automobile liability insurance in the types and minimum amounts of (i) Bodily Injury - ¥30,000,000 per person per occurrence, in addition to the Japanese Compulsory Insurance (JCI), and (ii) Property Damage - ¥3,000,000 per occurrence.
(b) Report of Damage, Destruction, Injury or Death.
(1) The Contractor shall report all incidents of damage or destruction to property, or personal injury or death to any person, arising out of and during the performance of this contract. For the purposes of this paragraph, the term “property” includes equipment, freight, or property of any type whether Government owned or not and the term “Contractor” includes the Contractor, its agents, or employees.
(2) The Contractor shall submit these reports to the KO and the COR as follows:
(i) A preliminary report shall be made as soon as practicable after the time the incident occurs. The report may be either verbal or by facsimile.
(ii) A complete written report shall be submitted within 96 hours after occurrence of the incident.
1.7.7. Contractor’s Personnel.
(a) Contract Manager (CM). The Contractor shall provide a CM who shall be responsible for the performance of work under this PWS. The name of this individual and alternate(s) who shall act for the Contractor when the CM is absent shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operations of the work performed under this contract. The CM and alternate shall be individuals who are capable of conversing in, and comprehending English.
(b) The CM or alternate shall not perform any other services under this PWS without coordination through the COR. The CM shall report any problems that are encountered in any work locations.
(c) Removal of Contractor’s Employee. The Contractor shall utilize only experienced, responsible and capable employees in the performance of this contract. The KO may require that the Contractor remove from the Government job any of his/her employees who endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of military security.
(d) Third Country Nationals (TCN). The Security Forces on each base control entry to the base.
Under certain circumstances, the TCN might be denied entry. It is the Contractor’s responsibility to coordinate with Security Forces at each base when there is a question about particular circumstance.
1.7.8. Subcontracting. The subcontractors shall meet the standards required by this contract to perform the service. The prime Contractor is responsible for the performance of the subcontractors.
1.7.9. U.S. Legal Holidays. The U.S. legal holidays are specified below (see paragraph 1.6.2.(d) above):
1st January New Year’s Day 3rd Monday of January Martin Luther King Jr.’s Birthday 3rd Monday of February Presidents’ Day Last Monday of May Memorial Day 4th July Independence Day 1st Monday of September Labor Day 2nd Monday of October Columbus Day 11th November Veterans Day 4th Thursday of November Thanksgiving Day 25th December Christmas Day
1.7.10. Liabilities.
(a) The Government shall in no event be liable or responsible for damage or injury to any person or property occasioned through the use, maintenance, or operation of any vehicle or other equipment by, or the action of, the Contractor or the Contractor’s employees and agents in performing under this contract, and the Government shall be indemnified and saved harmless against claims for damage or injury in such cases.
(b) Except when loss and/or damage arises out of causes beyond the control and without the fault or negligence of the Contractor, the Contractor shall assume full liability for any and all goods lost and/or damaged in the movement covered by this contract.
2. SERVICES SUMMARY.
Performance Objective
PWS
Paragraph Performance Threshold Method of Assessment
Compliance with sensitive or hazardous freight requirement
1.2.3., 1.2.4., and 1.2.5
Customer complaints shall not exceed 1 per month
Customer Complaints
Furnishing proper trucks as ordered 1.3 Customer complaints shall not exceed 3 per month
Customer Complaints
Compliance with Caller’s schedule 1.6.1 Customer complaints shall not exceed 3 per month
Customer Complaints
Proper stowage of freight 1.6.8 Customer complaints shall not exceed 3 per month
Customer Complaints
3. GOVERNMENT-FURNISHED SERVICES. None.
4. APPENDIX.
A. Estimated Workload.
First Year Second Year x010 From USMC Air Station Iwakuni To US Fleet Activities, Yokosuka (921 km) x01A 4-Ton Truck 1 1 x01B 8-Ton Truck 1 1 x01C 10-Ton Truck 130 65 x01D 12-Ton Truck 1 1
Est. Grand Total 133 68
General Freight Dangerous
Freight Hazardous
Freight Sensitive Freight
Est. Number of Trucks per Year
133 trucks 0 0 0 **133 trucks
General Freight Dangerous
Freight Hazardous
Freight Sensitive Freight
Est. Number of Trucks per Year
68 trucks 0 0 0 **68 trucks
First Year Second Year x020 From USMC Air Station Iwakuni To US Fleet Activities, Yokosuka (921 km) x02A 4-Ton Truck 1 1 x02B 8-Ton Truck 1 1 x02C 10-Ton Truck 65 65 x02D 12-Ton Truck 1 1
Est. Grand Total 68 68
General Freight Dangerous
Freight Hazardous
Freight Sensitive Freight
Est. Number of Trucks per year
68 trucks 0 0 0 **68 trucks
General Freight Dangerous
Freight Hazardous
Freight Sensitive Freight
Est. Number of Trucks per year
68 trucks 0 0 0 **68 trucks
* Performance would be required for 2-day period sometime in the month of May.
** The estimated number of 68 trucks in total is by all BPA holders, not per each BPA holder.
Est. Qty Item Number
Description
Second Year: Anticipated Performance Period
* May 2019
* May 2018
APPENDIX A
ESTIMATED WORK LOAD
First Year: Anticipated Performance Period
*Two performances (December 2017 + another month)
First Year: Anticipated Performance Period
Estimated (Est.) Quantity (Qty) Item Number
Description
Second Year: Anticipated Performance Period
* Performance would be required for 2-day period sometime in December and another month.
** The estimated number of 133 trucks in total is for two performances and by all BPA holders, not per each BPA holder.
*November/December
* Performance would be required for 2-day period sometime in the month of November/December.
** The estimated number of 68 trucks in total is by all BPA holders, not per each BPA holder.
File details come from the government source that posted it. Updated .