3.__RFP_No._FA5209-16-R-0021.pdf

PDF 349 KB Posted

Attached to
Operation, Maintenance and Repair of Utility Plants and Systems at U. S. Army Installations in Kanto Area, Japan
Solicitation number
FA5209-16-R-0021
Issued by

About this file

3. RFP No. FA5209-16-R-0021 (SF1449)

View the file

Other files

File Type Posted
PWS_(21_Oct_16).pdf PDF
Amendment_0001_(SF30).pdf PDF
Pricing_Exhibit_(21_Oct_16).pdf PDF
Site_Visit_Memo_(FA520916R0021).pdf PDF
Pre-proposal_Conf_Minutes_(16R0021).pdf PDF
3a.__Pricing_Exhibit.pdf PDF
3b.__Atch_1_(PWS_14_Sep_16).pdf PDF
2.__Notice_to_Offerors.pdf PDF
3d.__Atch_3_(Survey).pdf PDF
3c.__Atch_2_(PPI_List).pdf PDF
2a._Attendance_List_(16R0021).pdf PDF
1.__Gov't_Policy_Ltr.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

FA5209-16-R-0021 19-Sep-2016

b. TELEPHONE NUMBER

042-551-6120

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 04 Nov 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

FA52099. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

KANAE YAMAMOTO

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0010852623

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

374TH CONTRACTING SQUADRON

UNIT 5228, BLDG 620, YOKOTA AB

FUSSA-SHI, TOKYO 197-0001 JAPAN

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE WT5J0M 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

SUP BR ENGR SPT DIV DPW

KAZUTO OHIRA

JAPAN

TEL: 263-8296 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

561210

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

FA5209-16-R-0021

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 12 Months Operation, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached Performance Work Statement (PWS) and Pricing Exhibit A (Item No.

A001AA through A001AD).

Period of Performance: 1 April 2017 thru 31 March 2018 (Basic)

NSN: M1NB-MA-INT-BOLR

PURCHASE REQUEST NUMBER: 0010852623

SIGNAL CODE: A

NET AMT

0002 12 Months Operation, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit A (Item No. A002AA through A002AB).

Period of Performance: 1 April 2017 thru 31 March 2018 (Basic)

NSN: M1NB-MA-INT-BOLR

0003 12 Months Operation, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit A (Item No. A003AA through A003AC).

Period of Performance: 1 April 2017 thru 31 March 2018 (Basic)

NSN: M1NB-MA-INT-BOLR

0004 12 Months Maintenance, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit A (Item No. A004AA through A004AD).

Period of Performance: 1 April 2017 thru 31 March 2018 (Basic)

NSN: M1NB-MA-INT-BOLR

0005 12 Months Maintenance, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit A (Item No. A005AA through A005AB).

Period of Performance: 1 April 2017 thru 31 March 2018 (Basic)

NSN: M1NB-MA-INT-BOLR

0006 12 Months Maintenance, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit A (Item No. A006AA through A006AC).

Period of Performance: 1 April 2017 thru 31 March 2018 (Basic)

NSN: M1NB-MA-INT-BOLR

0007 1 Lot CFM for Maintenance Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the

PWS

Period of Performance: 1 April 2017 thru 31 March 2018 (Basic)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

NSN: M1NB-MA-INT-BOLR

0008 1 Lot Repair Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS.

Period of Performance: 1 April 2017 thru 31 March 2018 (Basic)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

NSN: M1NB-MA-INT-BOLR

1001 12 Months OPTION Operation, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached Performance Work Statement (PWS) and Pricing Exhibit B (Item No.

B001AA through B001AD).

Period of Performance: 1 April 2018 thru 31 March 2019 (Option 1)

NSN: M1NB-MA-INT-BOLR

1002 12 Months OPTION Operation, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit B (Item No. B002AA through B002AB).

Period of Performance: 1 April 2018 thru 31 March 2019 (Option 1)

1003 12 Months OPTION Operation, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit B (Item No. B003AA through B003AC).

Period of Performance: 1 April 2018 thru 31 March 2019 (Option 1)

1004 12 Months OPTION Maintenance, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit B (Item No. B004AA through B004AD).

Period of Performance: 1 April 2018 thru 31 March 2019 (Option 1)

1005 12 Months OPTION Maintenance, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit B (Item No. B005AA through B005AB).

Period of Performance: 1 April 2018 thru 31 March 2019 (Option 1)

1006 12 Months OPTION Maintenance, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit B (Item No. B006AA through B006AC).

Period of Performance: 1 April 2018 thru 31 March 2019 (Option 1)

1007 1 Lot OPTION CFM for Maintenance Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the

PWS.

Period of Performance: 1 April 2018 thru 31 March 2019 (Option 1)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

1008 1 Lot OPTION Repair Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS.

Period of Performance: 1 April 2018 thru 31 March 2019 (Option 1)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

2001 12 Months OPTION Operation, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached Performance Work Statement (PWS) and Pricing Exhibit C (Item No.

C001AA through C001AD).

Period of Performance: 1 April 2019 thru 31 March 2020 (Option 2)

2002 12 Months OPTION Operation, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit C (Item No. C002AA through C002AB).

Period of Performance: 1 April 2019 thru 31 March 2020 (Option 2)

2003 12 Months OPTION Operation, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit C (Item No. C003AA through C003AC).

Period of Performance: 1 April 2019 thru 31 March 2020 (Option 2)

2004 12 Months OPTION Maintenance, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit C (Item No. C004AA through C004AD).

Period of Performance: 1 April 2019 thru 31 March 2020 (Option 2)

2005 12 Months OPTION Maintenance, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit C (Item No. C005AA through C005AB).

Period of Performance: 1 April 2019 thru 31 March 2020 (Option 2)

2006 12 Months OPTION Maintenance, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit C (Item No. C006AA through C006AC).

Period of Performance: 1 April 2019 thru 31 March 2020 (Option 2)

2007 1 Lot OPTION CFM for Maintenance Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the

PWS

Period of Performance: 1 April 2019 thru 31 March 2020 (Option 2)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

2008 1 Lot OPTION Repair Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS.

Period of Performance: 1 April 2019 thru 31 March 2020 (Option 2)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

3001 12 Months OPTION Operation, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached Performance Work Statement (PWS) and Pricing Exhibit D (Item No.

D001AA through D001AD).

Period of Performance: 1 April 2020 thru 31 March 2021 (Option 3)

3002 12 Months OPTION Operation, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit D (Item No. D002AA through D002AB).

Period of Performance: 1 April 2020 thru 31 March 2021 (Option 3)

3003 12 Months OPTION Operation, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit D (Item No. D003AA through D003AC).

Period of Performance: 1 April 2020 thru 31 March 2021 (Option 3)

3004 12 Months OPTION Maintenance, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit D (Item No. D004AA through D004AD).

Period of Performance: 1 April 2020 thru 31 March 2021 (Option 3)

3005 12 Months OPTION Maintenance, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit D (Item No. D005AA through D005AB).

Period of Performance: 1 April 2020 thru 31 March 2021 (Option 3)

3006 12 Months OPTION Maintenance, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit D (Item No. D006AA through D006AC).

Period of Performance: 1 April 2020 thru 31 March 2021 (Option 3)

3007 1 Lot OPTION CFM for Maintenance Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the

PWS

Period of Performance: 1 April 2020 thru 31 March 2021 (Option 3)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

3008 1 Lot OPTION Repair Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS.

Period of Performance: 1 April 2020 thru 31 March 2021 (Option 3)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

4001 12 Months OPTION Operation, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached Performance Work Statement (PWS) and Pricing Exhibit E (Item No.

E001AA through E001AD).

Period of Performance: 1 April 2021 thru 31 March 2022 (Option 4)

4002 12 Months OPTION Operation, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit E (Item No. E002AA through E002AB).

Period of Performance: 1 April 2021 thru 31 March 2022 (Option 4)

4003 12 Months OPTION Operation, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit E (Item No. E003AA through E003AC).

Period of Performance: 1 April 2021 thru 31 March 2022 (Option 4)

4004 12 Months OPTION Maintenance, Area 1 (CZ & SFHA)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit E (Item No. E004AA through E004AD).

Period of Performance: 1 April 2021 thru 31 March 2022 (Option 4)

4005 12 Months OPTION Maintenance, Area 2 (SGD)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit E (Item No. E005AA through E005AB).

Period of Performance: 1 April 2021 thru 31 March 2022 (Option 4)

4006 12 Months OPTION Maintenance, Area 3 (YND & APC)

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS and Pricing Exhibit E (Item No. E006AA through E006AC).

Period of Performance: 1 April 2021 thru 31 March 2022 (Option 4)

4007 1 Lot OPTION CFM for Maintenance Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the

PWS

Period of Performance: 1 April 2021 thru 31 March 2022 (Option 4)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

4008 1 Lot OPTION Repair Work

FFP

Non personal services: Contractor shall provide all necessary personnel, supervision, management, tools, equipment, transportation, materials and any other items or services necessary for Operation, Maintenance and Repair of Utility Plants and System at U.S. Army Installations in Kanto Area, Japan in accordance with the attached PWS.

Period of Performance: 1 April 2021 thru 31 March 2022 (Option 4)

Note: This is a Not-to-Exceed (NTE) CLIN in which the amount is provided by the Government. Offeror is not required to propose on this CLIN, and any amount identified herein will not be used during evaluation of the total evaluated price.

CLAUSES INCORPORATED BY FULL TEXT

Addenda to SF 1449

Block 17b of SF 1449, Remittance Address:

If the remittance address is different from the mailing address, enter the remittance address below. Failure to provide this information may impact payment.

Block 18b, SF 1449, Submit invoices to the following address:

Directorate of Public Works U.S. Army Garrison, Japan Camp Zama, Zama-shi, Kanagawa-ken 252-8511

CONTRACT CLAUSES

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984 52.204-18 Commercial and Government Entity Code Maintenance JUL 2015 52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014 52.232-18 Availability Of Funds APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7003 Agency Office of the Inspector General DEC 2012 252.204-7009 Limitations on the Use or Disclosure of Third-Party

Contractor Reported Cyber Incident Information

DEC 2015

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.

DEC 2015

252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

SEP 2004

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014

Addenda to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS (Dec 2014):

(c) Changes. The text is deleted and replaced as follows:

FAR 52.217-8, Option to Extend Services and FAR 52.217-9, Option to Extend the Terms of the Contract, have been added by addendum to this contract. In accordance with terms and conditions of the clause, the Contracting Officer may unilaterally exercise any option(s). All other changes to the terms and conditions of this contract shall be made only by written agreement of the parties.

(k) Taxes. The text is deleted and replaced as follows:

(1) Unless otherwise provided in this contract, the contract price includes all applicable taxes and duties, except taxes and duties that the Government of the United States and the Government of Japan have agreed shall not be applicable to expenditures in Japan by or on behalf of the United States.

(2) The Status of Forces Agreement between the Japan and the United States and implementing the Japanese laws authorizes the United States exemption from certain Japanese taxes for materials, supplies, equipment and services procured for official purpose in Japan by the United States Armed Forces or by authorized agencies of the United States Armed Forces. Those taxes include (1) Consumption tax, (2) Gasoline tax and local road tax on gasoline, (3) Diesel oil tax, and (4) Liquefied petroleum gas tax.

(3) The Contractor will submit requests for gasoline or diesel oil tax exemption certificate to the Contracting Officer. This request will show the actual amount of gasoline or diesel oil used exclusively for the performance of this contract, with documentary evidence and detailed item breakdown to support the accurate consumption of gasoline or diesel oil, or other necessary information and data as may be required. The Contracting Officer will issue to the Contractor a tax exemption certificate for the actual amount of gasoline or diesel oil used exclusively for the performance of this contract.

(v) Conciliation. Except as otherwise provided in this contract, any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the United States - Japan Joint Committee for conciliation in accordance with Paragraph 10, Article XVIII of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between Japan and the United States of America. Requests by the Contractor shall be made in accordance with the following procedures:

(1) In the event the Contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact with the appropriate authority in accordance with the clause of this contract entitled, “Disputes” and within the time limits described therein before filing a request for conciliation with the Joint Committee and then request the appellate authority under the “Disputes” clause to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.

(2) The request for conciliation will be submitted by the Contractor through the nearest Defense Facilities Administration Bureau, to the Contract Conciliation Panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the Contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.

(3) In the event the disagreement submitted to the Joint Committee under subparagraph (2) above has been resolved through conciliation, it will be the responsibility of the Contractor to notify the appellate authority designated in the clause of this contract entitled, “Disputes”, of the settlement of the dispute and to withdraw his appeal.

(4) In the event the Contractor has submitted a request for conciliation to the Joint Committee under subparagraph

(2) above desires, notwithstanding tendency of his request for conciliation, that action by the appropriate authority under the clause of this contract entitled, “Disputes”, be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the Contractor of his action taken hereunder.

(5) No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled, “Disputes”, has been rendered.

Pending the hearing of the conciliation panel, the Contractor shall proceed diligently with the performance of the contract in accordance with the Contracting Officer’s decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file in a civil suit.

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAR 2016)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

X (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L.

109-282) (31 U.S.C. 6101 note).

____ (5) [Reserved]

____ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

____ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub.

L. 111-117, section 743 of Div. C).

X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2015) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Oct 2001) of 52.219-9.

____ (iii) Alternate II (Oct 2001) of 52.219-9.

____ (iv) Alternate III (Oct 2015) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.

657f).

____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

____ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

____(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (FEB 2016) (E.O. 13126).

____ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

____ (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).

____ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

____ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).

____ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496).

X (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (37)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (39)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

X (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O.

13513).

____ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____ (42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

____ (43) 52.225-5, Trade Agreements (FEB 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.

5150).

____ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

____ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

____ (50) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C. 3332).

X (51) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).

For the purpose of this clause, the blank(s) is/are completed as follows:

(b)(1) The date when the Contractor submits first invoice, using EFT Form established by DFAS.

____ (52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.

Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

____ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).

____ (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).

____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

____ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).

____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

____ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

(ii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(v) 52.222-26, Equal Opportunity (APR 2015) (E.O. 11246).

(vi) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).

(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(viii) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).

(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).

(xi) ____ (A) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).

____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xiv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).

(xv)52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).

(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xviii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor at least 30 days before contract expiration.

Note: Since these services will be performed strictly in the country of Japan, the contractor is required to follow the labor standards of Japan. The rates will not be adjusted as a result of revisions to prevailing labor rates provided by the Secretary of Labor, as applicable to contracts performed in the United States. Therefore, payment shall be made at the rates specified for the period of performance immediately preceding the period of extended services.

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor no later than thirty (30) days prior to contract expiration; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 66 months.

252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS

OUTSIDE THE UNITED STATES (JUN 2015)

(a) Definition. United States, as used in this clause, means, the 50 States, the District of Columbia, and outlying areas.

(b) Except as provided in paragraph (c) of this clause, the Contractor and its subcontractors, if performing or traveling outside the United States under this contract, shall--

(1) Affiliate with the Overseas Security Advisory Council, if the Contractor or subcontractor is a U.S. entity;

(2) Ensure that Contractor and subcontractor personnel who are U.S. nationals and are in-country on a non-transitory basis, register with the U.S. Embassy, and that Contractor and subcontractor personnel who are third country nationals comply with any security related requirements of the Embassy of their nationality;

(3) Provide, to Contractor and subcontractor personnel,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .