0.4_Exhibit_A-G_Blank_Pricing_Schedule.xlsx
XLSX spreadsheet 141 KB Posted
- Attached to
- Change of Occupancy Maintenance Service of Military Family Housing Units, Yokota AB, Japan
- Solicitation number
- FA5209-15-R-0029
About this file
0.4 Exhibit A-G Blank Pricing Schedule for Offerors
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Basic Year: 1 Sep 11 thru 31 Mar 12 | |||||
| A001 | Perform COM Routine Repair and Replacement: | 645 | HSG UNIT | ¥37,000 | ¥23,865,000 |
| A002 | Incidental Labor (Reimbursable Materials): | ||||
| Architectural Work | |||||
| A002AA | Replace/Install blinds and shades | 600 | EA | ¥500 | ¥300,000 |
| A002AB | Replace door locks with new cylinder door locks | 35 | EA | ¥1,500 | ¥52,500 |
| A002AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥800 | ¥1,600 |
| A002AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥1,500 | ¥133,500 |
| A002AE | Replace/install door | 5 | EA | ¥2,000 | ¥10,000 |
| A002AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥1,500 | ¥63,000 |
| A002AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥3,000 | ¥6,000 |
| A002AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥6,000 | ¥12,000 |
| A002AJ | Repair/replace kitchen counter tops | 2 | EA | ¥20,000 | ¥40,000 |
| A002AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥1,500 | ¥15,000 |
| A002AL | Repair/replace shoji screens | 4 | EA | ¥500 | ¥2,000 |
| Mechanical Work | |||||
| A002AM | Replace faucets/faucet diverter | 26 | EA | ¥1,000 | ¥26,000 |
| A002AN | Replace combination faucet for bathtub | 2 | EA | ¥2,000 | ¥4,000 |
| A002AP | Replace kitchen range hoods | 1 | EA | ¥2,800 | ¥2,800 |
| A002AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥600 | ¥60,000 |
| Electrical Work | |||||
| A002AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥1,000 | ¥34,000 |
| A002AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥1,000 | ¥23,000 |
| A002AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 199 | EA | ¥700 | ¥139,300 |
| TOTAL ESTIMATED AMOUNT FOR CLIN A002 | ¥924,700 |
| A003 | Additional Maintenance Work (Unit Price Basis): | ||||
| Painting: | |||||
| A003AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥36 | ¥57,643,416 |
| A003AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥38 | ¥25,407,940 |
| A003AC | Varnish and Stain w/Surface Preparation | 119,027 | SF | ¥32 | ¥3,808,864 |
| Architectural Repair/Replacement | |||||
| Floor Work: | |||||
| A003AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥300 | ¥1,850,100 |
| A003AE | Replace/Install 2mm thick vinyl sheet flooring | 364 | SF | ¥1,000 | ¥364,000 |
| A003AF | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 8,371 | SF | ¥440 | ¥3,683,240 |
| A003AG | Replace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden) | 6,513 | SF | ¥420 | ¥2,735,460 |
| A003AH | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 100 | EA | ¥380 | ¥38,000 |
| A003AJ | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | LF | ¥500 | ¥10,000 |
| A003AK | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥650 | ¥52,000 |
| A003AL | Replace 6"x 6" quarry tile | 50 | EA | ¥400 | ¥20,000 |
| A003AM | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥3,000 | ¥6,000 |
| A003AN | Repair/Replace concrete floor edge on patio | 33 | SF | ¥400 | ¥13,200 |
| Floor Maintenance (Wax Finish) | |||||
| A003AP | Floor Maintenance (2BR/3BR) | 33 | HSG UNIT | ¥17,000 | ¥561,000 |
| A003AQ | Floor Maintenance (4BR/SOQ/GOQ Units) | 16 | HSG UNIT | ¥27,000 | ¥432,000 |
| A003AR | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 619 | HSG UNIT | ¥6,750 | ¥4,178,250 |
| Carpet Cleaning | |||||
| A003AS | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥12,300 | ¥3,997,500 |
| A003AT | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥40,000 | ¥560,000 |
| A003AU | Remove existing wall-to-wall carpet. | 30 | SY | ¥600 | ¥18,000 |
| A003AV | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥1,500 | ¥36,067,500 |
| A003AW | Repair/patch of wall-to-wall carpet | 189 | SY | ¥500 | ¥94,500 |
| Wall & Ceiling Work | |||||
| A003AX | Remove damaged baseboard and replace with new vinyl base | 2,752 | LF | ¥100 | ¥275,200 |
| A003AY | Replace ceiling acoustic tile | 41 | SF | ¥400 | ¥16,400 |
| A003AZ | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥300 | ¥10,800 |
| A003BA | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥450 | ¥3,648,600 |
| A003BB | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥600 | ¥55,200 |
| A003BC | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥300 | ¥364,800 |
| A003BD | Remove & replace ceiling access door (Garden) w/new aluminum framed door | 1 | EA | ¥17,000 | ¥17,000 |
| A003BE | Remove damaged rough lumber and replace with new (Garden) | 15 | BF | ¥1,500 | ¥22,500 |
| A003BF | Remove damaged curtain box & replace w/new paint finish curtain box (Garden) | 1 | EA | ¥10,000 | ¥10,000 |
| A003BG | Remove vinyl wall covering and replace with new wall covering | 348 | SF | ¥130 | ¥45,240 |
| A003BH | Remove vinyl wall covering and paint wall | 10,115 | SF | ¥140 | ¥1,416,100 |
| Door & Window Work: | |||||
| A003BJ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥2,500 | ¥20,000 |
| A003BK | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥5,400 | ¥2,926,800 |
| A003BL | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥8,000 | ¥592,000 |
| A003BM | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥35,000 | ¥70,000 |
| A003BN | Replace aluminum window railing, incl. bolts & hardware (Garden) | 1 | EA | ¥8,000 | ¥8,000 |
| A003BP | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥1,000 | ¥1,000 |
| A003BQ | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥1,000 | ¥1,000 |
| Cabinet Work | |||||
| A003BR | Replace damaged cabinet bottom and back | 25 | SF | ¥800 | ¥20,000 |
| A003BS | Replace damaged plastic laminated sheets | 1,589 | SF | ¥400 | ¥635,600 |
| A003BT | Replace damaged cabinet shelf | 12 | LF | ¥800 | ¥9,600 |
| Mechanical Maintenance, Repair & Replacement | |||||
| A003BU | Recoat bathtub with ceramic finish | 236 | EA | ¥157,000 | ¥37,052,000 |
| A003BV | Replace commode/water closet with new | 12 | EA | ¥30,000 | ¥360,000 |
| A003BW | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥20,000 | ¥20,000 |
| A003BX | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥20,000 | ¥100,000 |
| A003BY | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥5,000 | ¥110,000 |
| A003BZ | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥27,000 | ¥513,000 |
| A003CA | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥25,000 | ¥175,000 |
| A003CB | Replace "P" trap for lavatory or sink | 104 | EA | ¥6,500 | ¥676,000 |
| A003CC | Replace water tank for water closet | 1 | EA | ¥25,000 | ¥25,000 |
| A003CD | Replace water tank lid | 1 | EA | ¥10,000 | ¥10,000 |
| Electric Maintenance, Repair & Replacement: | |||||
| Other Electric Work: | |||||
| A003CE | Inspect/Check panel board to include megger test and report | 1 | EA | ¥3,000 | ¥3,000 |
| A003CF | Measure ground resistance of the grounding system and report | 1 | EA | ¥3,000 | ¥3,000 |
| A003CG | Installation of Occupant Name Tag | 591 | EA | ¥2,000 | ¥1,182,000 |
| A003CH | Install Government-furnished Window AC Unit 8,000 BTU | 1 | EA | ¥2,000 | ¥2,000 |
| A003CJ | Install Government-furnished Window AC Unit 18,000 BTU | 1 | EA | ¥3,000 | ¥3,000 |
| A003CK | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 119 | EA | ¥4,500 | ¥535,500 |
| A003CL | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥5,000 | ¥15,000 |
| TOTAL ESTIMATED AMOUNT FOR CLIN A003 | ¥192,491,310 |
| A004 | Cleaning Work | ||||
| A004AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥24,500 | ¥9,334,500 |
| A004AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥29,500 | ¥1,829,000 |
| A004AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥6,600 | ¥2,514,600 |
| A004AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥10,000 | ¥620,000 |
| A004AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥8,300 | ¥3,668,600 |
| A004AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥6,700 | ¥2,961,400 |
| A004AG | Perform Full Cleaning GOQs | 2 | EA | ¥130,000 | ¥260,000 |
| A004AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥3,000 | ¥96,000 |
| A004AJ | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 337 | HSG UNIT | ¥8,900 | ¥2,999,300 |
| Vacant Units and Local Move Cleaning | |||||
| A004AK | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 97 | HSG UNIT | ¥39,000 | ¥3,783,000 |
| A004AL | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥48,000 | ¥2,064,000 |
| A004AM | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 128 | HSG UNIT | ¥23,000 | ¥2,944,000 |
| A004AN | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥30,000 | ¥660,000 |
| A004AP | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥8,000 | ¥600,000 |
| A004AQ | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥31,500 | ¥2,205,000 |
| A004AR | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥6,600 | ¥514,800 |
| A004AS | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥37,000 | ¥111,000 |
| A004AT | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥10,000 | ¥80,000 |
| A004AU | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥30,000 | ¥30,000 |
| TOTAL ESTIMATED AMOUNT FOR CLIN A004 | ¥37,275,200 | ||||
| TOTAL ESTIMATED AMOUNT FOR BASIC PERIOD: | ¥254,556,210 | ||||
| FY11 | |||||
| $1 | ¥ 101.9517 | $ 2,496,831.44 |
&"Times New Roman,Bold"&12&UEXHIBIT A, PRICING SCHEDULE
&"Times New Roman,Regular"RFP No. FA5209-11-R-0001 Contract No. FA5209-11-D-0007
EXHIBIT B
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Option 1: 1 Apr 12 thru 31 Mar 31 | |||||
| B001 | Perform COM Routine Repair and Replacement: | 645 | HSG UNIT | ¥37,000 | ¥23,865,000 |
| B002 | Incidental Labor (Reimbursable Materials): | ||||
| Architectural Work | |||||
| B002AA | Replace/Install blinds and shades | 600 | EA | ¥500 | ¥300,000 |
| B002AB | Replace door locks with new cylinder door locks | 35 | EA | ¥1,500 | ¥52,500 |
| B002AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥800 | ¥1,600 |
| B002AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥1,500 | ¥133,500 |
| B002AE | Replace/install door | 5 | EA | ¥2,000 | ¥10,000 |
| B002AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥1,500 | ¥63,000 |
| B002AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥3,000 | ¥6,000 |
| B002AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥6,000 | ¥12,000 |
| B002AJ | Repair/replace kitchen counter tops | 2 | EA | ¥20,000 | ¥40,000 |
| B002AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥1,500 | ¥15,000 |
| B002AL | Repair/replace shoji screens | 4 | EA | ¥500 | ¥2,000 |
| Mechanical Work | |||||
| B002AM | Replace faucets/faucet diverter | 26 | EA | ¥1,000 | ¥26,000 |
| B002AN | Replace combination faucet for bathtub | 2 | EA | ¥2,000 | ¥4,000 |
| B002AP | Replace kitchen range hoods | 1 | EA | ¥2,800 | ¥2,800 |
| B002AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥600 | ¥60,000 |
| Electrical Work | |||||
| B002AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥1,000 | ¥34,000 |
| B002AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥1,000 | ¥23,000 |
| B002AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 199 | EA | ¥700 | ¥139,300 |
| TOTAL ESTIMATED AMOUNT FOR CLIN B002 | ¥924,700 |
| B003 | Additional Maintenance Work (Unit Price Basis): | ||||
| Painting: | |||||
| B003AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥36 | ¥57,643,416 |
| B003AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥38 | ¥25,407,940 |
| B003AC | Varnish and Stain w/Surface Preparation | 119,027 | SF | ¥32 | ¥3,808,864 |
| Architectural Repair/Replacement | |||||
| Floor Work: | |||||
| B003AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥300 | ¥1,850,100 |
| B003AE | Replace/Install 2mm thick vinyl sheet flooring | 364 | SF | ¥1,000 | ¥364,000 |
| B003AF | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 8,371 | SF | ¥440 | ¥3,683,240 |
| B003AG | Replace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden) | 6,513 | SF | ¥420 | ¥2,735,460 |
| B003AH | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 100 | EA | ¥380 | ¥38,000 |
| B003AJ | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥500 | ¥10,000 |
| B003AK | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥650 | ¥52,000 |
| B003AL | Replace 6"x 6" quarry tile | 50 | EA | ¥400 | ¥20,000 |
| B003AM | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥3,000 | ¥6,000 |
| B003AN | Repair/Replace concrete floor edge on patio | 33 | SF | ¥400 | ¥13,200 |
| Floor Maintenance (Wax Finish) | |||||
| B003AP | Floor Maintenance (2BR/3BR) | 33 | HSG UNIT | ¥17,000 | ¥561,000 |
| B003AQ | Floor Maintenance (4BR/SOQ/GOQ Units) | 16 | HSG UNIT | ¥27,000 | ¥432,000 |
| B003AR | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 619 | HSG UNIT | ¥6,750 | ¥4,178,250 |
| Carpet Cleaning | |||||
| B003AS | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥12,300 | ¥3,997,500 |
| B003AT | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥40,000 | ¥560,000 |
| B003AU | Remove existing wall-to-wall carpet. | 30 | SF | ¥600 | ¥18,000 |
| B003AV | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥1,500 | ¥36,067,500 |
| B003AW | Repair/patch of wall-to-wall carpet | 189 | SY | ¥500 | ¥94,500 |
| Wall & Ceiling Work | |||||
| B003AX | Remove damaged baseboard and replace with new vinyl base | 2,752 | LF | ¥100 | ¥275,200 |
| B003AY | Replace ceiling acoustic tile | 41 | SF | ¥400 | ¥16,400 |
| B003AZ | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥300 | ¥10,800 |
| B003BA | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥450 | ¥3,648,600 |
| B003BB | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥600 | ¥55,200 |
| B003BC | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥300 | ¥364,800 |
| B003BD | Remove & replace ceiling access door (Garden) w/new aluminum framed door | 1 | EA | ¥17,000 | ¥17,000 |
| B003BE | Remove damaged rough lumber and replace with new (Garden) | 15 | BF | ¥1,500 | ¥22,500 |
| B003BF | Remove damaged curtain box & replace w/new paint finish curtain box (Garden) | 1 | EA | ¥10,000 | ¥10,000 |
| B003BG | Remove vinyl wall covering and replace with new wall covering | 348 | SF | ¥130 | ¥45,240 |
| B003BH | Remove vinyl wall covering and paint wall | 10,115 | SF | ¥140 | ¥1,416,100 |
| Door & Window Work: | |||||
| B003BJ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥2,500 | ¥20,000 |
| B003BK | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥5,400 | ¥2,926,800 |
| B003BL | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥8,000 | ¥592,000 |
| B003BM | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥35,000 | ¥70,000 |
| B003BN | Replace aluminum window railing, incl. bolts & hardware (Garden) | 1 | EA | ¥8,000 | ¥8,000 |
| B003BP | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥1,000 | ¥1,000 |
| B003BQ | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥1,000 | ¥1,000 |
| Cabinet Work | |||||
| B003BR | Replace damaged cabinet bottom and back | 25 | SF | ¥800 | ¥20,000 |
| B003BS | Replace damaged plastic laminated sheets | 1,589 | SF | ¥400 | ¥635,600 |
| B003BT | Replace damaged cabinet shelf | 12 | LF | ¥800 | ¥9,600 |
| Mechanical Maintenance, Repair & Replacement | |||||
| B003BU | Recoat bathtub with ceramic finish | 236 | EA | ¥157,000 | ¥37,052,000 |
| B003BV | Replace commode/water closet with new | 12 | EA | ¥30,000 | ¥360,000 |
| B003BW | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥20,000 | ¥20,000 |
| B003BX | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥20,000 | ¥100,000 |
| B003BY | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥5,000 | ¥110,000 |
| B003BZ | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥27,000 | ¥513,000 |
| B003CA | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥25,000 | ¥175,000 |
| B003CB | Replace "P" trap for lavatory or sink | 104 | EA | ¥6,500 | ¥676,000 |
| B003CC | Replace water tank for water closet | 1 | EA | ¥25,000 | ¥25,000 |
| B003CD | Replace water tank lid | 1 | EA | ¥10,000 | ¥10,000 |
| Electric Maintenance, Repair & Replacement: | |||||
| Other Electric Work: | |||||
| B003CE | Inspect/Check panel board to include megger test and report | 1 | EA | ¥3,000 | ¥3,000 |
| B003CF | Measure ground resistance of the grounding system and report | 1 | EA | ¥3,000 | ¥3,000 |
| B003CG | Installation of Occupant Name Tag | 591 | EA | ¥2,000 | ¥1,182,000 |
| B003CH | Install Government-furnished Window AC Unit 8,000 BTU | 1 | EA | ¥2,000 | ¥2,000 |
| B003CJ | Install Government-furnished Window AC Unit 18,000 BTU | 1 | EA | ¥3,000 | ¥3,000 |
| B003CK | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 119 | EA | ¥4,500 | ¥535,500 |
| B003CL | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥5,000 | ¥15,000 |
| TOTAL ESTIMATED AMOUNT FOR CLIN B003 | ¥192,491,310 |
| B004 | Cleaning Work | ||||
| B004AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥24,500 | ¥9,334,500 |
| B004AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥29,500 | ¥1,829,000 |
| B004AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥6,600 | ¥2,514,600 |
| B004AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥10,000 | ¥620,000 |
| B004AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥8,300 | ¥3,668,600 |
| B004AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥6,700 | ¥2,961,400 |
| B004AG | Perform Full Cleaning GOQs | 2 | EA | ¥130,000 | ¥260,000 |
| B004AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥3,000 | ¥96,000 |
| B004AJ | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 337 | HSG UNIT | ¥8,900 | ¥2,999,300 |
| Vacant Units and Local Move Cleaning | |||||
| B004AK | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 97 | HSG UNIT | ¥39,000 | ¥3,783,000 |
| B004AL | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥48,000 | ¥2,064,000 |
| B004AM | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 128 | HSG UNIT | ¥23,000 | ¥2,944,000 |
| B004AN | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥30,000 | ¥660,000 |
| B004AP | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥8,000 | ¥600,000 |
| B004AQ | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥31,500 | ¥2,205,000 |
| B004AR | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥6,600 | ¥514,800 |
| B004AS | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥37,000 | ¥111,000 |
| B004AT | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥10,000 | ¥80,000 |
| B004AU | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥30,000 | ¥30,000 |
| TOTAL ESTIMATED AMOUNT FOR CLIN B004 | ¥37,275,200 | ||||
| TOTAL ESTIMATED AMOUNT FOR OPTION ONE PERIOD: | ¥254,556,210 | ||||
| FY12 | |||||
| $1 | ¥ 91.2524 | $ 2,789,583.73 |
&"Times New Roman,Bold"&12&UEXHIBIT B, PRICING SCHEDULE
EXHIBIT C
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Option 2: 1 Apr 13 thru 31 Mar 14 | |||||
| C001 | Perform COM Routine Repair and Replacement: | 645 | HSG UNIT | ¥37,000 | ¥23,865,000 |
| C002 | Incidental Labor (Reimbursable Materials): | ||||
| Architectural Work | |||||
| C002AA | Replace/Install blinds and shades | 600 | EA | ¥500 | ¥300,000 |
| C002AB | Replace door locks with new cylinder door locks | 35 | EA | ¥1,500 | ¥52,500 |
| C002AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥800 | ¥1,600 |
| C002AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥1,500 | ¥133,500 |
| C002AE | Replace/install door | 5 | EA | ¥2,000 | ¥10,000 |
| C002AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥1,500 | ¥63,000 |
| C002AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥3,000 | ¥6,000 |
| C002AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥6,000 | ¥12,000 |
| C002AJ | Repair/replace kitchen counter tops | 2 | EA | ¥20,000 | ¥40,000 |
| C002AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥1,500 | ¥15,000 |
| C002AL | Repair/replace shoji screens | 4 | EA | ¥500 | ¥2,000 |
| Mechanical Work | |||||
| C002AM | Replace faucets/faucet diverter | 26 | EA | ¥1,000 | ¥26,000 |
| C002AN | Replace combination faucet for bathtub | 2 | EA | ¥2,000 | ¥4,000 |
| C002AP | Replace kitchen range hoods | 1 | EA | ¥2,800 | ¥2,800 |
| C002AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥600 | ¥60,000 |
| Electrical Work | |||||
| C002AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥1,000 | ¥34,000 |
| C002AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥1,000 | ¥23,000 |
| C002AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 199 | EA | ¥700 | ¥139,300 |
| TOTAL ESTIMATED AMOUNT FOR CLIN C002 | ¥924,700 |
| C003 | Additional Maintenance Work (Unit Price Basis): | ||||
| Painting: | |||||
| C003AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥36 | ¥57,643,416 |
| C003AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥38 | ¥25,407,940 |
| C003AC | Varnish and Stain w/Surface Preparation | 119,027 | SF | ¥32 | ¥3,808,864 |
| Architectural Repair/Replacement | |||||
| Floor Work: | |||||
| C003AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥300 | ¥1,850,100 |
| C003AE | Replace/Install 2mm thick vinyl sheet flooring | 364 | SF | ¥1,000 | ¥364,000 |
| C003AF | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 8,371 | SF | ¥440 | ¥3,683,240 |
| C003AG | Replace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden) | 6,513 | SF | ¥420 | ¥2,735,460 |
| C003AH | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 100 | EA | ¥380 | ¥38,000 |
| C003AJ | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥500 | ¥10,000 |
| C003AK | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥650 | ¥52,000 |
| C003AL | Replace 6"x 6" quarry tile | 50 | EA | ¥400 | ¥20,000 |
| C003AM | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥3,000 | ¥6,000 |
| C003AN | Repair/Replace concrete floor edge on patio | 33 | SF | ¥400 | ¥13,200 |
| Floor Maintenance (Wax Finish) | |||||
| C003AP | Floor Maintenance (2BR/3BR) | 33 | HSG UNIT | ¥17,000 | ¥561,000 |
| C003AQ | Floor Maintenance (4BR/SOQ/GOQ Units) | 16 | HSG UNIT | ¥27,000 | ¥432,000 |
| C003AR | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 619 | HSG UNIT | ¥6,750 | ¥4,178,250 |
| Carpet Cleaning | |||||
| C003AS | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥12,300 | ¥3,997,500 |
| C003AT | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥40,000 | ¥560,000 |
| C003AU | Remove existing wall-to-wall carpet. | 30 | SF | ¥600 | ¥18,000 |
| C003AV | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥1,500 | ¥36,067,500 |
| C003AW | Repair/patch of wall-to-wall carpet | 189 | SY | ¥500 | ¥94,500 |
| Wall & Ceiling Work | |||||
| C003AX | Remove damaged baseboard and replace with new vinyl base | 2,752 | LF | ¥100 | ¥275,200 |
| C003AY | Replace ceiling acoustic tile | 41 | SF | ¥400 | ¥16,400 |
| C003AZ | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥300 | ¥10,800 |
| C003BA | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥450 | ¥3,648,600 |
| C003BB | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥600 | ¥55,200 |
| C003BC | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥300 | ¥364,800 |
| C003BD | Remove & replace ceiling access door (Garden) w/new aluminum framed door | 1 | EA | ¥17,000 | ¥17,000 |
| C003BE | Remove damaged rough lumber and replace with new (Garden) | 15 | BF | ¥1,500 | ¥22,500 |
| C003BF | Remove damaged curtain box & replace w/new paint finish curtain box (Garden) | 1 | EA | ¥10,000 | ¥10,000 |
| C003BG | Remove vinyl wall covering and replace with new wall covering | 348 | SF | ¥130 | ¥45,240 |
| C003BH | Remove vinyl wall covering and paint wall | 10,115 | SF | ¥140 | ¥1,416,100 |
| Door & Window Work: | |||||
| C003BJ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥2,500 | ¥20,000 |
| C003BK | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥5,400 | ¥2,926,800 |
| C003BL | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥8,000 | ¥592,000 |
| C003BM | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥35,000 | ¥70,000 |
| C003BN | Replace aluminum window railing, incl. bolts & hardware (Garden) | 1 | EA | ¥8,000 | ¥8,000 |
| C003BP | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥1,000 | ¥1,000 |
| C003BQ | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥1,000 | ¥1,000 |
| Cabinet Work | |||||
| C003BR | Replace damaged cabinet bottom and back | 25 | SF | ¥800 | ¥20,000 |
| C003BS | Replace damaged plastic laminated sheets | 1,589 | SF | ¥400 | ¥635,600 |
| C003BT | Replace damaged cabinet shelf | 12 | LF | ¥800 | ¥9,600 |
| Mechanical Maintenance, Repair & Replacement | |||||
| C003BU | Recoat bathtub with ceramic finish | 236 | EA | ¥157,000 | ¥37,052,000 |
| C003BV | Replace commode/water closet with new | 12 | EA | ¥30,000 | ¥360,000 |
| C003BW | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥20,000 | ¥20,000 |
| C003BX | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥20,000 | ¥100,000 |
| C003BY | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥5,000 | ¥110,000 |
| C003BZ | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥27,000 | ¥513,000 |
| C003CA | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥25,000 | ¥175,000 |
| C003CB | Replace "P" trap for lavatory or sink | 104 | EA | ¥6,500 | ¥676,000 |
| C003CC | Replace water tank for water closet | 1 | EA | ¥25,000 | ¥25,000 |
| C003CD | Replace water tank lid | 1 | EA | ¥10,000 | ¥10,000 |
| Electric Maintenance, Repair & Replacement: | |||||
| Other Electric Work: | |||||
| C003CE | Inspect/Check panel board to include megger test and report | 1 | EA | ¥3,000 | ¥3,000 |
| C003CF | Measure ground resistance of the grounding system and report | 1 | EA | ¥3,000 | ¥3,000 |
| C003CG | Installation of Occupant Name Tag | 591 | EA | ¥2,000 | ¥1,182,000 |
| C003CH | Install Government-furnished Window AC Unit 8,000 BTU | 1 | EA | ¥2,000 | ¥2,000 |
| C003CJ | Install Government-furnished Window AC Unit 18,000 BTU | 1 | EA | ¥3,000 | ¥3,000 |
| C003CK | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 119 | EA | ¥4,500 | ¥535,500 |
| C003CL | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥5,000 | ¥15,000 |
| TOTAL ESTIMATED AMOUNT FOR CLIN C003 | ¥192,491,310 |
| C004 | Cleaning Work | ||||
| C004AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥24,500 | ¥9,334,500 |
| C004AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥29,500 | ¥1,829,000 |
| C004AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥6,600 | ¥2,514,600 |
| C004AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥10,000 | ¥620,000 |
| C004AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥8,300 | ¥3,668,600 |
| C004AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥6,700 | ¥2,961,400 |
| C004AG | Perform Full Cleaning GOQs | 2 | EA | ¥130,000 | ¥260,000 |
| C004AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥3,000 | ¥96,000 |
| C004AJ | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 337 | HSG UNIT | ¥8,900 | ¥2,999,300 |
| Vacant Units and Local Move Cleaning | |||||
| C004AK | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 97 | HSG UNIT | ¥39,000 | ¥3,783,000 |
| C004AL | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥48,000 | ¥2,064,000 |
| C004AM | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 128 | HSG UNIT | ¥23,000 | ¥2,944,000 |
| C004AN | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥30,000 | ¥660,000 |
| C004AP | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥8,000 | ¥600,000 |
| C004AQ | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥31,500 | ¥2,205,000 |
| C004AR | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥6,600 | ¥514,800 |
| C004AS | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥37,000 | ¥111,000 |
| C004AT | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥10,000 | ¥80,000 |
| C004AU | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥30,000 | ¥30,000 |
| TOTAL ESTIMATED AMOUNT FOR CLIN C004 | ¥37,275,200 | ||||
| TOTAL ESTIMATED AMOUNT FOR OPTION TWO PERIOD: | ¥254,556,210 | ||||
| FY13 | |||||
| $1 | ¥ 82.4035 | $ 3,089,143.18 |
&"Times New Roman,Bold"&12&UEXHIBIT C, PRICING SCHEDULE
Cover Sheet Summary
| Description of Work | ELIN (Exhibit | |||||||||
| Line Item Number) | Basic | Option-1 | Option-2 | Option-3 | Option-4 | Option-5 | Option-6 | Total for 7 Years | ||
| Perform COM Routine Repair and Replacement | X100 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |||
| Incidental Labor (In Conjunction with Recoupment Materials): | X2AA - X2AT | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |||
| Additional Maintenance Work (Unit Price Basis): | X3AA - X3CJ | ¥0 | ¥0 | ¥0 | ¥0 | ERROR:#REF! | ¥0 | ¥0 | ERROR:#REF! | |
| N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |||
| Carpet Cleaning and Replacement Work | X4AA - X4AE | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |||
| Cleaning Work (Clean & Clear) | X5AA - X5AH | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |||
| Perform Yard Maintenance (2/3/4 Bedroom units/SEQ/SOQ) | X6AA - X6AC | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |||
| Vacant Units and Local Move Cleaning | X7AA - X7AL | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |||
| Recoupment Material (In support of CLIN X002) | X800 | No Price Proposal Required | No Price Proposal Required | No Price Proposal Required | No Price Proposal Required | No Price Proposal Required | No Price Proposal Required | No Price Proposal Required | N/A | |
| N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |||
| TOTAL | ¥0 | ¥0 | ¥0 | ¥0 | ERROR:#REF! | ¥0 | ¥0 | ERROR:#REF! | ||
| N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A |
FA5209-15-R-0029
PRICING SCHEDULE
CHANGE OF OCCUPANCY MAINTENANCE OF MILITARY FAMILY HOUSING UNITS AT YOKOTA AB, JAPAN
SUMMARY OF BASIC THRU OPTION YEAR 6 (TOTAL OF 7 YEARS)
EXHIBIT A Basic
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Basic: 1 Apr 16 thru 31 Mar 17 | |||||
| A100 | Perform COM Routine Repair and Replacement: PWS Para 1.1.2. | 530 | HSG UNIT | ¥0 |
| A200 | Incidental Labor (In Conjunction with Recoupment Materials): PWS Para 1.1.3. | ¥0 | |||
| A2 | AA | Replace/Install blinds | 500 | EA | ¥0 |
| A2 | AB | Replace door locks with new cylinder door locks/duplicate keys | 52 | EA | ¥0 |
| A2 | AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥0 |
| A2 | AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥0 |
| A2 | AE | Replace/install door | 5 | EA | ¥0 |
| A2 | AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥0 |
| A2 | AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥0 |
| A2 | AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥0 |
| A2 | AJ | Repair/replace kitchen counter tops | 2 | EA | ¥0 |
| A2 | AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥0 |
| A2 | AL | Repair/replace shoji screens | 6 | EA | ¥0 |
| A2 | AM | Replace faucets/faucet diverter | 72 | EA | ¥0 |
| A2 | AN | Replace combination faucet for bathtub | 12 | EA | ¥0 |
| A2 | AP | Replace kitchen range hoods | 1 | EA | ¥0 |
| A2 | AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥0 |
| A2 | AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥0 |
| A2 | AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥0 |
| A2 | AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 100 | EA | ¥0 |
| A300 | Additional Maintenance Work (Unit Price Basis): PWS Para 1.1.4. | ¥0 | |||
| A3 | AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥0 |
| A3 | AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥0 |
| A3 | AC | Varnish and Stain w/Surface Preparation | 60,000 | SF | ¥0 |
| A3 | AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥0 |
| A3 | AE | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 14,884 | SF | ¥0 |
| A3 | AF | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 50 | EA | ¥0 |
| A3 | AG | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥0 |
| A3 | AH | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥0 |
| A3 | AJ | Replace 6"x 6" quarry tile | 50 | EA | ¥0 |
| A3 | AK | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥0 |
| A3 | AL | Repair/Replace concrete floor edge on patio | 33 | SF | ¥0 |
| A3 | AM | Floor Maintenance (2BR/3BR) | 2 | HSG UNIT | ¥0 |
| A3 | AN | Floor Maintenance (4BR/SOQ/GOQ Units) | 2 | HSG UNIT | ¥0 |
| A3 | AP | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 500 | HSG UNIT | ¥0 |
| A3 | AQ | Remove damaged baseboard and replace with new vinyl base | 1,500 | LF | ¥0 |
| A3 | AR | Replace ceiling acoustic tile | 41 | SF | ¥0 |
| A3 | AS | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥0 |
| A3 | AT | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥0 |
| A3 | AU | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥0 |
| A3 | AV | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥0 |
| A3 | AW | Remove & replace ceiling access door w/new aluminum framed door | 1 | EA | ¥0 |
| A3 | AX | Remove damaged rough lumber and replace with new | 15 | BF | ¥0 |
| A3 | AY | Remove damaged curtain box & replace w/new paint finish curtain box | 1 | EA | ¥0 |
| A3 | AZ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥0 |
| A3 | BA | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥0 |
| A3 | BB | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥0 |
| A3 | BC | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥0 |
| A3 | BD | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥0 |
| A3 | BE | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥0 |
| A3 | BF | Replace damaged cabinet bottom and back | 25 | SF | ¥0 |
| A3 | BG | Replace damaged plastic laminated sheets | 700 | SF | ¥0 |
| A3 | BH | Replace damaged cabinet shelf | 12 | LF | ¥0 |
| A3 | BJ | Recoat bathtub with ceramic finish | 150 | EA | ¥0 |
| A3 | BK | Replace commode/water closet with new | 12 | EA | ¥0 |
| A3 | BL | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥0 |
| A3 | BM | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥0 |
| A3 | BN | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥0 |
| A3 | BP | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥0 |
| A3 | BQ | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥0 |
| A3 | BR | Replace "P" trap for lavatory or sink | 104 | EA | ¥0 |
| A3 | BS | Replace water tank for water closet | 1 | EA | ¥0 |
| A3 | BT | Replace water tank lid | 1 | EA | ¥0 |
| A3 | BU | Installation of Occupant Name Tag | 591 | EA | ¥0 |
| A3 | BV | Install Government-furnished Window AC Unit 8,000 BTU | 5 | EA | ¥0 |
| A3 | BW | Install Government-furnished Window AC Unit 18,000 BTU | 5 | EA | ¥0 |
| A3 | BX | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 15 | EA | ¥0 |
| A3 | BY | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥0 |
| A3 | BZ | Asbestos Work-Clean, HEPA Vac & Wet Wipe | 3,900 | SM | ¥0 |
| A3 | CA | Asbestos Work-Inst/Demo Decon Chamber: | 300 | SM | ¥0 |
| A3 | CB | Asbestos Work-Protect, Walls, 6 Mil Poly | 3,200 | SM | ¥0 |
| A3 | CC | Asbestos Work-Protect, Openings/Critical Barriers, 6 Mil Poly | 1,800 | SM | ¥0 |
| A3 | CD | Asbestos Work-Demo, ACM Floor Tile/Mastic | 1,960 | SM | ¥0 |
| A3 | CE | AsbestosWork-Demo, ACM Carpet/Mastic | 1,960 | SM | ¥0 |
| A3 | CF | Asbestos Work-Demo, ACM Cove Base/Mastic | 2,120 | SM | ¥0 |
| A3 | CG | Asbestos Work-Disposal, ACM Collect/Bag/Transport to outside of Kanto Area | 200 | CM | ¥0 |
| A3 | CH | AsbestosWork-, Walls/Ceilings/Floor | 1,700 | SM | ¥0 |
| A3 | CJ | Asbestos Work-Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | 90 | EA | ¥0 |
| A400 | Carpet Steam Cleaning and Replacement Work: PWS Para 1.1.5 | ¥0 | |||
| A4 | AA | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥0 |
| A4 | AB | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥0 |
| A4 | AC | Remove existing wall-to-wall carpet. | 350 | SY | ¥0 |
| A4 | AD | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥0 |
| A4 | AE | Repair/patch of wall-to-wall carpet | 189 | SY | ¥0 |
| A500 | Cleaning Work (Clean & Clear): PWS Para 1.1.6. | ¥0 | |||
| A5 | AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| A5 | AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| A5 | AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| A5 | AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| A5 | AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥0 |
| A5 | AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥0 |
| A5 | AG | Perform Full Cleaning GOQs | 2 | EA | ¥0 |
| A5 | AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥0 |
| A600 | Yard Maintenance: PWS Para 1.1.6.7. | 250 | HSG UNIT | ¥0 | |
| A6 | AA | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 250 | HSG UNIT | ¥0 |
| A6 | AB | Remove/Dispose Government Furnished Shed | 10 | EA | ¥0 |
| A6 | AC | Relocate Government Furnished Shed | 20 | EA | ¥0 |
| A700 | Vacant Units and Local Move Cleaning: PWS Para 1.1.6.8. | ¥0 | |||
| A7 | AA | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 85 | HSG UNIT | ¥0 |
| A7 | AB | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥0 |
| A7 | AC | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 115 | HSG UNIT | ¥0 |
| A7 | AD | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥0 |
| A7 | AE | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥0 |
| A7 | AF | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥0 |
| A7 | AG | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥0 |
| A7 | AH | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥0 |
| A7 | AJ | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥0 |
| A7 | AK | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥0 |
| A7 | AL | Perform Local Move Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 30 | HSG UNIT | ¥0 |
A800 Recoupment Material PWS Para 1.1.7. EA No Price Proposal Required
TOTAL ESTIMATED AMOUNT FOR BASIC YEAR: ¥0
&"Times New Roman,Bold"&12&UEXHIBIT A, PRICING SCHEDULE
&P
EXHIBIT B Op-1
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Option-1: 1 Apr 17 thru 31 Mar 18 | |||||
| B100 | Perform COM Routine Repair and Replacement: PWS Para 1.1.2. | 530 | HSG UNIT | ¥0 |
| B200 | Incidental Labor (In Conjunction with Recoupment Materials): PWS Para 1.1.3. | ¥0 | |||
| B2 | AA | Replace/Install blinds | 500 | EA | ¥0 |
| B2 | AB | Replace door locks with new cylinder door locks/duplicate keys | 52 | EA | ¥0 |
| B2 | AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥0 |
| B2 | AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥0 |
| B2 | AE | Replace/install door | 5 | EA | ¥0 |
| B2 | AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥0 |
| B2 | AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥0 |
| B2 | AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥0 |
| B2 | AJ | Repair/replace kitchen counter tops | 2 | EA | ¥0 |
| B2 | AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥0 |
| B2 | AL | Repair/replace shoji screens | 6 | EA | ¥0 |
| B2 | AM | Replace faucets/faucet diverter | 72 | EA | ¥0 |
| B2 | AN | Replace combination faucet for bathtub | 12 | EA | ¥0 |
| B2 | AP | Replace kitchen range hoods | 1 | EA | ¥0 |
| B2 | AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥0 |
| B2 | AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥0 |
| B2 | AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥0 |
| B2 | AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 100 | EA | ¥0 |
| B300 | Additional Maintenance Work (Unit Price Basis): PWS Para 1.1.4. | ¥0 | |||
| B3 | AA | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥0 |
| B3 | AB | Semi-gloss Base Enamel w/Surface Preparation | 668,630 | SF | ¥0 |
| B3 | AC | Varnish and Stain w/Surface Preparation | 60,000 | SF | ¥0 |
| B3 | AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥0 |
| B3 | AE | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 14,884 | SF | ¥0 |
| B3 | AF | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 50 | EA | ¥0 |
| B3 | AG | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥0 |
| B3 | AH | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥0 |
| B3 | AJ | Replace 6"x 6" quarry tile | 50 | EA | ¥0 |
| B3 | AK | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥0 |
| B3 | AL | Repair/Replace concrete floor edge on patio | 33 | SF | ¥0 |
| B3 | AM | Floor Maintenance (2BR/3BR) | 2 | HSG UNIT | ¥0 |
| B3 | AN | Floor Maintenance (4BR/SOQ/GOQ Units) | 2 | HSG UNIT | ¥0 |
| B3 | AP | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 500 | HSG UNIT | ¥0 |
| B3 | AQ | Remove damaged baseboard and replace with new vinyl base | 1,500 | LF | ¥0 |
| B3 | AR | Replace ceiling acoustic tile | 41 | SF | ¥0 |
| B3 | AS | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥0 |
| B3 | AT | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥0 |
| B3 | AU | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥0 |
| B3 | AV | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥0 |
| B3 | AW | Remove & replace ceiling access door w/new aluminum framed door | 1 | EA | ¥0 |
| B3 | AX | Remove damaged rough lumber and replace with new | 15 | BF | ¥0 |
| B3 | AY | Remove damaged curtain box & replace w/new paint finish curtain box | 1 | EA | ¥0 |
| B3 | AZ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥0 |
| B3 | BA | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥0 |
| B3 | BB | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥0 |
| B3 | BC | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥0 |
| B3 | BD | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥0 |
| B3 | BE | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥0 |
| B3 | BF | Replace damaged cabinet bottom and back | 25 | SF | ¥0 |
| B3 | BG | Replace damaged plastic laminated sheets | 700 | SF | ¥0 |
| B3 | BH | Replace damaged cabinet shelf | 12 | LF | ¥0 |
| B3 | BJ | Recoat bathtub with ceramic finish | 150 | EA | ¥0 |
| B3 | BK | Replace commode/water closet with new | 12 | EA | ¥0 |
| B3 | BL | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥0 |
| B3 | BM | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥0 |
| B3 | BN | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥0 |
| B3 | BP | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥0 |
| B3 | BQ | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥0 |
| B3 | BR | Replace "P" trap for lavatory or sink | 104 | EA | ¥0 |
| B3 | BS | Replace water tank for water closet | 1 | EA | ¥0 |
| B3 | BT | Replace water tank lid | 1 | EA | ¥0 |
| B3 | BU | Installation of Occupant Name Tag | 591 | EA | ¥0 |
| B3 | BV | Install Government-furnished Window AC Unit 8,000 BTU | 5 | EA | ¥0 |
| B3 | BW | Install Government-furnished Window AC Unit 18,000 BTU | 5 | EA | ¥0 |
| B3 | BX | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 15 | EA | ¥0 |
| B3 | BY | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥0 |
| B3 | BZ | Asbestos Work-Clean, HEPA Vac & Wet Wipe | 3,900 | SM | ¥0 |
| B3 | CA | Asbestos Work-Inst/Demo Decon Chamber: | 300 | SM | ¥0 |
| B3 | CB | Asbestos Work-Protect, Walls, 6 Mil Poly | 3,200 | SM | ¥0 |
| B3 | CC | Asbestos Work-Protect, Openings/Critical Barriers, 6 Mil Poly | 1,800 | SM | ¥0 |
| B3 | CD | Asbestos Work-Demo, ACM Floor Tile/Mastic | 1,960 | SM | ¥0 |
| B3 | CE | AsbestosWork-Demo, ACM Carpet/Mastic | 1,960 | SM | ¥0 |
| B3 | CF | Asbestos Work-Demo, ACM Cove Base/Mastic | 2,120 | SM | ¥0 |
| B3 | CG | Asbestos Work-Disposal, ACM Collect/Bag/Transport to outside of Kanto Area | 200 | CM | ¥0 |
| B3 | CH | AsbestosWork-Encapsulate, Walls/Ceilings/Floor | 1,700 | SM | ¥0 |
| B3 | CJ | Asbestos Work-Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | 90 | EA | ¥0 |
| B400 | Carpet Steam Cleaning and Replacement Work: PWS Para 1.1.5 | ¥0 | |||
| B4 | AA | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥0 |
| B4 | AB | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥0 |
| B4 | AC | Remove existing wall-to-wall carpet. | 350 | SY | ¥0 |
| B4 | AD | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥0 |
| B4 | AE | Repair/patch of wall-to-wall carpet | 189 | SY | ¥0 |
| B500 | Cleaning Work (Clean & Clear): PWS Para 1.1.6. | ¥0 | |||
| B5 | AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| B5 | AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| B5 | AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| B5 | AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| B5 | AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥0 |
| B5 | AF | Perform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ) | 442 | HSG UNIT | ¥0 |
| B5 | AG | Perform Full Cleaning GOQs | 2 | EA | ¥0 |
| B5 | AH | Perform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 32 | HSG UNIT | ¥0 |
| B600 | Yard Maintenance: PWS Para 1.1.6.7. | 250 | HSG UNIT | ¥0 | |
| B6 | AA | Perform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ) | 250 | HSG UNIT | ¥0 |
| B6 | AB | Remove/Dispose Government Furnished Shed | 10 | EA | ¥0 |
| B6 | AC | Relocate Government Furnished Shed | 20 | EA | ¥0 |
| B700 | Vacant Units and Local Move Cleaning: PWS Para 1.1.6.8. | ¥0 | |||
| B7 | AA | Vacant Unit Cleaning with Routine Maintenance (2/3/BR) | 85 | HSG UNIT | ¥0 |
| B7 | AB | Vacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ) | 43 | HSG UNIT | ¥0 |
| B7 | AC | Vacant Unit Cleaning without Routine Maintenance (2/3/BR) | 115 | HSG UNIT | ¥0 |
| B7 | AD | Vacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ) | 22 | HSG UNIT | ¥0 |
| B7 | AE | Perform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ) | 75 | HSG UNIT | ¥0 |
| B7 | AF | Perform Local move COM Cleaning (2/3 Bedroom Units) | 70 | HSG UNIT | ¥0 |
| B7 | AG | Perform Local move COM Bathroom Cleaning (2/3 Bedroom Units) | 78 | HSG UNIT | ¥0 |
| B7 | AH | Perform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units) | 3 | HSG UNIT | ¥0 |
| B7 | AJ | Perform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 8 | HSG UNIT | ¥0 |
| B7 | AK | Perform Local move COM Cleaning for GOQ | 1 | HSG UNIT | ¥0 |
| B7 | AL | Perform Local Move Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ) | 30 | HSG UNIT | ¥0 |
B800 Recoupment Material PWS Para 1.1.7. EA No Price Proposal Required
| TOTAL ESTIMATED AMOUNT FOR OPTION YEAR-1: | ¥0 |
| ERROR:#VALUE! |
&"Times New Roman,Bold"&12&UEXHIBIT B, PRICING SCHEDULE
&P
EXHIBIT C Op-2
| ITEM NO | SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| Option-2: 1 Apr 18 thru 31 Mar 19 | |||||
| C100 | Perform COM Routine Repair and Replacement: PWS Para 1.1.2. | 530 | HSG UNIT | ¥0 |
| C200 | Incidental Labor (In Conjunction with Recoupment Materials): PWS Para 1.1.3. | ¥0 | |||
| C2 | AA | Replace/Install blinds | 500 | EA | ¥0 |
| C2 | AB | Replace door locks with new cylinder door locks/duplicate keys | 52 | EA | ¥0 |
| C2 | AC | Replace aluminum/wood screen window with new aluminum/metal screen | 2 | EA | ¥0 |
| C2 | AD | Replace sliding screen door with new aluminum/steel frame | 89 | EA | ¥0 |
| C2 | AE | Replace/install door | 5 | EA | ¥0 |
| C2 | AF | Replace sheet glass (3/5/6.8mm) / aluminum sheet | 42 | EA | ¥0 |
| C2 | AG | Replace aluminum sheet bathroom/shower room | 2 | EA | ¥0 |
| C2 | AH | Repair/Replace air conditioner port door, hinges, locks, latch set | 2 | EA | ¥0 |
| C2 | AJ | Repair/replace kitchen counter tops | 2 | EA | ¥0 |
| C2 | AK | Replace door closer (pressured door closer/hinges) | 10 | EA | ¥0 |
| C2 | AL | Repair/replace shoji screens | 6 | EA | ¥0 |
| C2 | AM | Replace faucets/faucet diverter | 72 | EA | ¥0 |
| C2 | AN | Replace combination faucet for bathtub | 12 | EA | ¥0 |
| C2 | AP | Replace kitchen range hoods | 1 | EA | ¥0 |
| C2 | AQ | Replace/Install of government-furnished appliances | 100 | EA | ¥0 |
| C2 | AR | Install/Replace fluorescent-type lighting fixtures | 34 | EA | ¥0 |
| C2 | AS | Install/Replace interior & exterior incandescent-type lighting fixtures | 23 | EA | ¥0 |
| C2 | AT | Install/Replace lighting fixtures cover or diffuser/bulb protector | 100 | EA | ¥0 |
| C300 | Additional Maintenance Work (Unit Price Basis): PWS Para 1.1.4. | ¥0 | |||
| C3 | Replace/Install blinds | Semi-gloss Latex w/Surface Preparation | 1,601,206 | SF | ¥0 |
| C3 | AB | Semi-gloss Latex w/Surface Preparation | 668,630 | SF | ¥0 |
| C3 | AC | Semi-gloss Base Enamel w/Surface Preparation | 60,000 | SF | ¥0 |
| C3 | AD | Remove/Install 2mm thick vinyl floor tile including treads and risers | 6,167 | SF | ¥0 |
| C3 | AE | Replace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor) | 14,884 | SF | ¥0 |
| C3 | AF | Replace non-slip nosing on concrete steps w/ceramic tile (Garden) | 50 | EA | ¥0 |
| C3 | AG | Replace non-slip nosing on stairway w/brass edged plastic nosing (Garden) | 20 | SF | ¥0 |
| C3 | AH | Replace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom | 80 | SF | ¥0 |
| C3 | AJ | Replace 6"x 6" quarry tile | 50 | EA | ¥0 |
| C3 | AK | Replace terrazzo floor tile w/new (30 mm thk) | 2 | SF | ¥0 |
| C3 | AL | Repair/Replace concrete floor edge on patio | 33 | SF | ¥0 |
| C3 | AM | Floor Maintenance (2BR/3BR) | 2 | HSG UNIT | ¥0 |
| C3 | AN | Floor Maintenance (4BR/SOQ/GOQ Units) | 2 | HSG UNIT | ¥0 |
| C3 | AP | Partial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ) | 500 | HSG UNIT | ¥0 |
| C3 | AQ | Remove damaged baseboard and replace with new vinyl base | 1,500 | LF | ¥0 |
| C3 | AR | Replace ceiling acoustic tile | 41 | SF | ¥0 |
| C3 | AS | Remove damaged finish lumber and replace with new finish lumber | 36 | BF | ¥0 |
| C3 | AT | Replace ceramic wall or floor tiles (4x4, 6x6 etc.) with new | 8,108 | EA | ¥0 |
| C3 | AU | Remove & replace existing plaster, fiber gypsum wall board with new | 92 | SF | ¥0 |
| C3 | AV | Remove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints | 1,216 | SF | ¥0 |
| C3 | AW | Remove & replace ceiling access door w/new aluminum framed door | 1 | EA | ¥0 |
| C3 | AX | Remove damaged rough lumber and replace with new | 15 | BF | ¥0 |
| C3 | AY | Remove damaged curtain box & replace w/new paint finish curtain box | 1 | EA | ¥0 |
| C3 | AZ | Remove damaged curtain rails and replace with new steel rails | 8 | EA | ¥0 |
| C3 | BA | Maintenance of Windows & Door Glass 2 BR/3 BR Units | 542 | HSG UNIT | ¥0 |
| C3 | BB | Maintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ | 74 | HSG UNIT | ¥0 |
| C3 | BC | Maintenance of Windows & Door Glass GOQ | 2 | HSG UNIT | ¥0 |
| C3 | BD | Remove damaged window/door trims & replace with new wood trims | 1 | EA | ¥0 |
| C3 | BE | Repair wooden A/C port door including plywood cover and weather stripping | 1 | EA | ¥0 |
| C3 | BF | Replace damaged cabinet bottom and back | 25 | SF | ¥0 |
| C3 | BG | Replace damaged plastic laminated sheets | 700 | SF | ¥0 |
| C3 | BH | Replace damaged cabinet shelf | 12 | LF | ¥0 |
| C3 | BJ | Recoat bathtub with ceramic finish | 150 | EA | ¥0 |
| C3 | BK | Replace commode/water closet with new | 12 | EA | ¥0 |
| C3 | BL | Replace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min | 1 | EA | ¥0 |
| C3 | BM | Replace bathroom ceiling exhaust fan 115V | 5 | EA | ¥0 |
| C3 | BN | Remove/replace lavatory, stop valves & brackets | 22 | EA | ¥0 |
| C3 | BP | Remove and replace damaged medicine cabinet w/new and built-in lamp | 19 | EA | ¥0 |
| C3 | BQ | Remove and replace damaged medicine cabinet with new (no built-in lamp) | 7 | EA | ¥0 |
| C3 | BR | Replace "P" trap for lavatory or sink | 104 | EA | ¥0 |
| C3 | BS | Replace water tank for water closet | 1 | EA | ¥0 |
| C3 | BT | Replace water tank lid | 1 | EA | ¥0 |
| C3 | BU | Installation of Occupant Name Tag | 591 | EA | ¥0 |
| C3 | BV | Install Government-furnished Window AC Unit 8,000 BTU | 5 | EA | ¥0 |
| C3 | BW | Install Government-furnished Window AC Unit 18,000 BTU | 5 | EA | ¥0 |
| C3 | BX | Remove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking | 15 | EA | ¥0 |
| C3 | BY | Remove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking | 3 | EA | ¥0 |
| C3 | BZ | Asbestos Work-Clean, HEPA Vac & Wet Wipe | 3,900 | SM | ¥0 |
| C3 | CA | Asbestos Work-Inst/Demo Decon Chamber: | 300 | SM | ¥0 |
| C3 | CB | Asbestos Work-Protect, Walls, 6 Mil Poly | 3,200 | SM | ¥0 |
| C3 | CC | Asbestos Work-Protect, Openings/Critical Barriers, 6 Mil Poly | 1,800 | SM | ¥0 |
| C3 | CD | Asbestos Work-Demo, ACM Floor Tile/Mastic | 1,960 | SM | ¥0 |
| C3 | CE | AsbestosWork-Demo, ACM Carpet/Mastic | 1,960 | SM | ¥0 |
| C3 | CF | Asbestos Work-Demo, ACM Cove Base/Mastic | 2,120 | SM | ¥0 |
| C3 | CG | Asbestos Work-Disposal, ACM Collect/Bag/Transport to outside of Kanto Area | 200 | CM | ¥0 |
| C3 | CH | AsbestosWork-Encapsulate, Walls/Ceilings/Floor | 1,700 | SM | ¥0 |
| C3 | CJ | Asbestos Work-Sample/Analyze/Use NVLAP or AIHA approved lab, Air Sampling, PCM | 90 | EA | ¥0 |
| C400 | Carpet Steam Cleaning and Replacement Work: PWS Para 1.1.5 | ¥0 | |||
| C4 | AA | Steam Clean Carpets (other than SOQ/SEQ/GOQ) | 325 | HSG UNIT | ¥0 |
| C4 | AB | Steam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ) | 14 | HSG UNIT | ¥0 |
| C4 | AC | Remove existing wall-to-wall carpet. | 350 | SY | ¥0 |
| C4 | AD | Replace/Install wall-to-wall carpet | 24,045 | SY | ¥0 |
| C4 | AE | Repair/patch of wall-to-wall carpet | 189 | SY | ¥0 |
| C500 | Cleaning Work (Clean & Clear): PWS Para 1.1.6. | ¥0 | |||
| C5 | AA | Perform COM Basic Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| C5 | AB | Perform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| C5 | AC | Perform COM Bathroom Cleaning (2/3 Bedroom Units) | 381 | HSG UNIT | ¥0 |
| C5 | AD | Perform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units) | 62 | HSG UNIT | ¥0 |
| C5 | AE | Perform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ) | 442 | HSG UNIT | ¥0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .