Attachment 3b
11 KB Posted
- Solicitation number
- FA5209-11-R-0012
About this file
Attachment 3b
Text of this file
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
X-11-802
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVED
SECTION 01 11 00
1.9.2 Safety *
SECTION 01 11 00
1.9.3 Environmental **
SECTION 01 11 00
2.1 Memo for HM Usage
SECTION 01 11 00
1.9.4 SSHO*
SECTION 01 11 00
1.9.5 Site Manager
SECTION 01 11 00
1.16.1 As Built Drawing
SECTION 01 74 19
1.6 Waste Managt Plan**
SECTION 01 74 19
1.7 Manifest
SECTION 02 41 00
1.8 Dem / Deconst Plan
SECTION 26 20 00
1.5 Fabrication Drawings
SECTION 26 20 00
2.7 Panelboards
SECTION 26 20 00
2.5 Wire and Cable
SECTION 26 20 00
2.6 Receptacles
SECTION 26 20 00
2.7.3 Circuit Breakers
SECTION 26 20 00
3.3.2 600-volt wiring test
A
E15
A
A
A
A
D
A
D
A or E
A or E
A or E
A
A
X
X
X7
X2
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
C
EN
SE
S
Install Solar Power System, Bldg1285
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
O
PE
R A
T.
M A
IN
T.
X
W O
R K
P R
O C
ED
U
R E
PL
A
N S
O
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
X
X
X
X
11 X
12 X
13 X
X
14 X
5 AX
SUBMISSION DATE:
A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.
E. Consult w/ CI
* Safety Office Only ** Env. Div Only
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
X-11-802
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVED
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
C
EN
SE
S
Install Solar Power System, Bldg1285
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
O
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
SECTION 26 20 00
3.3.3 Grounding System Test
SECTION 48 14 13
2.2 Photovoltaic System
SECTION 48 14 13
2.5 Power Conditioner
SECTION 48 14 13
2.5 Transformer
SECTION 48 14 13
2.2 Photovoltaic System
SECTION 48 14 13
2.5 Power Conditioner
SECTION 48 14 13
2.5 Transformer
SECTION 48 14 13
2.9 Reflective Paint
SECTION 48 14 13
3.2 Factory Testing
SECTION 48 14 13
3.3 Field Quality Control
SECTION 48 14 13
1.3 Qualifications and Certifications
SECTION 48 14 13
1.4 Solar Collector Warranty
SECTION 48 14 13
3.1 Installation
SECTION 48 14 13
1.3.1 Operation and Maintenance Da
X E16
X
X
A
X A
X A
X A
X A
X
A
A
AX
X
X E
E
X E
AX
X D
SUBMISSION DATE:
A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.
E. Consult w/ CI
* Safety Office Only ** Env. Div Only
Other files
| File | Type | Posted |
|---|---|---|
| OF17.pdf | ||
| Government Policy Letter.pdf | ||
| Attachment 4 | — | |
| DD1707 | — | |
| Attachment 1a | — | |
| Attachment 3a | — | |
| SF1442.pdf | ||
| Attachment 1b | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .