PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

X-11-802

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SECTION 01 11 00

1.9.2 Safety *

SECTION 01 11 00

1.9.3 Environmental **

SECTION 01 11 00

2.1 Memo for HM Usage

SECTION 01 11 00

1.9.4 SSHO*

SECTION 01 11 00

1.9.5 Site Manager

SECTION 01 11 00

1.16.1 As Built Drawing

SECTION 01 74 19

1.6 Waste Managt Plan**

SECTION 01 74 19

1.7 Manifest

SECTION 02 41 00

1.8 Dem / Deconst Plan

SECTION 26 20 00

1.5 Fabrication Drawings

SECTION 26 20 00

2.7 Panelboards

SECTION 26 20 00

2.5 Wire and Cable

SECTION 26 20 00

2.6 Receptacles

SECTION 26 20 00

2.7.3 Circuit Breakers

SECTION 26 20 00

3.3.2 600-volt wiring test

A

E15

A

A

A

A

D

A

D

A or E

A or E

A or E

A

A

X

X

X7

X2

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

C

EN

SE

S

Install Solar Power System, Bldg1285

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

X

W O

R K

P R

O C

ED

U

R E

PL

A

N S

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

X

X

X

X

11 X

12 X

13 X

X

14 X

5 AX

SUBMISSION DATE:

A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

X-11-802

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

C

EN

SE

S

Install Solar Power System, Bldg1285

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

SECTION 26 20 00

3.3.3 Grounding System Test

SECTION 48 14 13

2.2 Photovoltaic System

SECTION 48 14 13

2.5 Power Conditioner

SECTION 48 14 13

2.5 Transformer

SECTION 48 14 13

2.2 Photovoltaic System

SECTION 48 14 13

2.5 Power Conditioner

SECTION 48 14 13

2.5 Transformer

SECTION 48 14 13

2.9 Reflective Paint

SECTION 48 14 13

3.2 Factory Testing

SECTION 48 14 13

3.3 Field Quality Control

SECTION 48 14 13

1.3 Qualifications and Certifications

SECTION 48 14 13

1.4 Solar Collector Warranty

SECTION 48 14 13

3.1 Installation

SECTION 48 14 13

1.3.1 Operation and Maintenance Da

X E16

X

X

A

X A

X A

X A

X A

X

A

A

AX

X

X E

E

X E

AX

X D

SUBMISSION DATE:

A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only

Other files

File Type Posted
OF17.pdf PDF
Government Policy Letter.pdf PDF
Attachment 4 —
DD1707 —
Attachment 1a —
Attachment 3a —
SF1442.pdf PDF
Attachment 1b —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .