PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

X-11-801

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SECTION 01 11 00

1.9.2 Safety *

SECTION 01 11 00

1.9.3 Environmental **

SECTION 01 11 00

2.1 Memo for HM Usage

SECTION 01 11 00

1.9.4 SSHO*

SECTION 01 11 00

1.9.5 Site Manager

SECTION 01 11 00

1.16.1 As Built Drawing

SECTION 01 74 19

1.6 Waste Managt Plan**

SECTION 01 74 19

1.7 Manifest

SECTION 02 41 00

1.8 Dem / Deconst Plan

Section 03 30 00

1.4.1 Reinforcing Steel

Section 03 30 00

2.1.1 Mix Design

Section 03 30 00

2.2.1 Cement

Section 03 30 00

2.2.4 Admixtures

Section 03 30 00

2.3 Reinforcement

Section 03 30 00

2.4 Joint Filler

AX5

A

A

X

A

X

A

X

A

X

X

X

X

X4

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

X

W O

R K

P R

O C

ED

U

R E

PL

A

N S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

LI

C

EN

SE

S

Replace UST with AST

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

X

A or E

A or E

A

A

X

X

10 X

D

A

D

A or E

X

A or E

SUBMISSION DATE:

A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

W O

R K

P R

O C

ED

U

R E

PL

A

N S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

LI

C

EN

SE

S

Replace UST with AST

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Section 03 30 00

2.2.3 Aggregates

Section 03 30 00

3.8.1.1 Slump Tests

Section 03 30 00

3.8.1.2 Comp Strength Tests

Section 03 30 00

3.8.1.3 Air Content

Section 03 30 00

3.8.1.4 Ion Concentration

Section 26 20 00

1.5 Fabrication Drawings

Section 26 20 00

2.7 Panelboards

Section 26 20 00

2.2 Conduit

Section 26 20 00

2.5 Boxes and Fittings

Section 26 20 00

2.6 Wire and Cable

Section 26 20 00

2.7.3 Circuit Breakers

Section 26 20 00

2.11 Grounding System

Section 26 20 00

3.3.2 600-volt Wiring Test

Section 26 20 00

3.3.3 Grounding Sys Test

Section 31 23 00

1.5.1 Shor & Sheet Plan

30 A or E

X D

X

X D

AX

A

A

X

X

X

X

X

A

A

A or EX

X C

A or E

X C

X D

A

X C

X

SUBMISSION DATE:

A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

W O

R K

P R

O C

ED

U

R E

PL

A

N S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

LI

C

EN

SE

S

Replace UST with AST

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Section 31 23 00

3.9.1.1 Density Tests

Section 32 11 23

1.6 Plant, Equip, &Tools

Section 32 11 23

1.4.1.1 Sieve Analysis

Section 32 11 23

1.4.1.2 LqdLim&PlastIndex

Section 32 11 23

1.4.1.3 Wear Test

Section 32 11 23

1.4.1.4 Compaction Test

Section 32 11 23

1.4.1.5 Thickness Test

Section 32 12 16

2.4 Mix Design

Section 32 12 16

1.6 Calibration

Section 32 12 16

2.1 Aggregates

Section 32 12 16

2.2 Asphalt Binder

Section 32 12 16

2.3 Prime & Tack Coat

Section 33 56 13

2.1 AST

Section 33 56 13

2.2.5 Reservoir Tank

Section 33 56 13

2.2.7 Maintenance Stair

A or EX

X A or E

A or EX

X A

X A

X A

X A

A

X D

X

X D

X C

X A

X A

A

X D

X

SUBMISSION DATE:

A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVEDO

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

W O

R K

P R

O C

ED

U

R E

PL

A

N S

TO BE COMPLETED BY PROJECT ENGINNER

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

LI

C

EN

SE

S

Replace UST with AST

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Section 33 56 13

2.2.8 Handrail for Tank

Section 33 56 13

2.2.4 Level Gauges

Section 33 56 13

2.2.5 Pump

Section 33 56 13

2.3.1 Pipes

Section 33 56 13

2.3.2 Containment Pipe

Section 33 56 13

2.3.2.1 Leak Detector

Section 33 56 13

2.3.3 Flexible Connector

Section 33 56 13

3.2 Acceptance Test

Section 33 56 13

3.1.1 Installation Inst

Section 33 56 13

2.1 AST

Section 33 56 13

2.3.2.1 Leak Detector

Section 33 56 13

1.5 Warranty

X D

DX

A

X D

X

A

A

X

A

X

A

X

A

X

A

X

X

A or E46 X

X D56

SUBMISSION DATE:

A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

Other files

File Type Posted
OF17.pdf PDF
Attachment 3b —
Government Policy Letter.pdf PDF
Attachment 4 —
DD1707 —
Attachment 1a —
SF1442.pdf PDF
Attachment 1b —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .