PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
A-11-135
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVED
SECTION 01 11 00
1.10.2 Safety *
SECTION 01 11 00
1.10.3 Environmental **
SECTION 01 11 00
2.1 Memo for HM Usage
SECTION 01 11 00
1.10.4 SSHO*
SECTION 01 11 00
1.10.5 Site Manager
SECTION 01 11 00
.17.1 As-Built Drawing
SECTION 01 35 29
1.4 APP*
SECTION 01 35 29
1.4 Competent Person
SECTION 01 35 29
3.1 CSE Permits*
SECTION 01 74 19
1.6 Waste Managt Plan*
SECTION 01 74 19
1.7 Manifest*
SECTION 02 41 00
1.8 Demo/DeconPlan
SECTION 02 41 00
1.4.1 Registration Certificate
SECTION 02 82 14
1.7 Accident Prevention Plan
SECTION 02 82 14
1.11 Training Program
X13
14 X
X
11 X
X
10 X
7 X
X
X
O
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
X
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
2 X
X
X
X6
A
A
A
A
A
E
A
A
A
A
A
A
E
A
15 X A
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
* Safety Office Only ** Env. Div Only Page 1 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 02 82 14
1.4 Detailed Drawings
SECTION 02 82 14
1.14 PPE
SECTION 02 82 14
1.22 Air Monitoring Equipment
SECTION 02 82 14
1.19 Local Exhaust System
SECTION 02 82 14
1.15 Hygiene Facilities
SECTION 02 82 14
1.23 Expendable Supplies
SECTION 02 82 14
2.1 Encapsulants
SECTION 02 82 14
3.9 Exposure Assessment and Air Mo
SECTION 02 82 14
1.5 Qualifications
SECTION 02 82 14
3.11.3 Weight Bills and Delivery Tic
SECTION 02 82 14
3.11.4.1 Asbestos Waste Shipment R
SECTION 02 82 33
1.6.2.2 Lead-Based Paint Removal/C
SECTION 02 82 33
1.4 Occupant Protection Plan
SECTION 02 82 33
1.7 Materials and Equipment
SECTION 02 82 33
Lead Based Paint Encapsulate Coatin A
A
X
A
X
A
X E
X
X E
X E
X C
AX
A
A
X
A
X
X
A
A
X
A
X
X
X
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 2 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 02 82 33
Occupational and Environmental Sam
SECTION 02 82 33
3.4.1 Test
SECTION 02 82 33
1.6.1.1 Qualifications of CP
SECTION 02 82 33
1.6.1.2 Testing Laboratory
SECTION 02 82 33
3.5.1.1 Clearance Certification
SECTION 02 82 33
3.5.2.1 Hazardous Waste Manifest
SECTION 02 82 33
3.6 Abatement Report
SECTION 03 30 00
1.4.2.1 Reinforcing steel
SECTION 03 30 00
2.4.1 Cement
SECTION 03 30 00
2.5 Reinforcement
SECTION 03 30 00
2.4.4 Admixtures
SECTION 03 30 00
1.4.1.1 Concrete mix design
SECTION 03 30 00
2.3.1 Mix Design
SECTION 03 30 00
2.4.3 Aggregates
SECTION 04 20 00
2.1 Concrete Masonry Units (CMU)45 X A
X A44
X43 D
X B42
41 X A
A40 X
39 X A
A38 X
37 X E
X E36
35 X E
X A34
33 X B
X D32
X31 D
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 3 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 04 20 00
2.1 Concrete Masonry Units (CMU)
SECTION 04 20 00
2.3 Reinforcing Steel Bars and Rods
SECTION 04 20 00
3.8.1 Filling Concrete Testing
SECTION 04 20 00
3.2.1 Reinforced Concrete Masonry U
SECTION 05 12 00
1.4.2.1 Welding Procedures
SECTION 05 12 00
1.4.1 Fabrication Drawings
SECTION 05 12 00
2.1 Steel Member
SECTION 05 12 00
2.2 Bolts, Nuts, and Washers
SECTION 05 12 00
1.4.2.1 Qualifications
SECTION 05 30 00
1.3.2 Fabrication Drawings
SECTION 05 30 00
2.2 Deck Units
SECTION 05 30 00
2.3 Eaves Gutter and Downspout
SECTION 05 30 00
1.5 Warranty
SECTION 06 10 00
2.2 Plywood
SECTION 06 10 00
2.3 Preservative Treated Wood A60 X
59 X A
X A58
57 X A
A56 X
55 X A
AX54
53 X A
A52 X
51 X A
A50 X
49 AX
X D48
47 X A
A46 X
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 4 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 06 10 00
2.4 Cement Bonded Flake Board
SECTION 06 10 00
2.5 Fiber Reinforced Cement Boards
SECTION 06 10 00
2.1 Certificates of Grade
SECTION 06 20 00
1.2 Detail Drawings
SECTION 06 20 00
2.1.2.1 Wood Siding
SECTION 06 20 00
2.1.1 Certificates of grade
SECTION 07 41 13
1.4.4 Roofing Panels
SECTION 07 41 13
1.4.4 Flashing and Accessories
SECTION 07 41 13
1.4.4 Gutter/Downspout Assembly
SECTION 07 41 13
2.1 Roof panels
SECTION 07 41 13
2.3 Prefabricated Seam Roofing
SECTION 07 41 13
1.4.4 Factory-Applied Color Finish
SECTION 07 41 13
2.5 Accessorie
SECTION 07 41 13
1.4.4 Fasteners
SECTION 07 41 13
1.4.4 gaskets and sealant/insulating c75 X A
A74 X
73 X A
A72 X
71 X A
A70 X
69 X A
A68 X
67 X A
AX66
65 X A
A64 X
63 AX
A62 X
61 X A
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 5 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 07 41 13
2.1 Roof Panels
SECTION 07 41 13
2.3 Prefabricated Seam Roofing
SECTION 07 41 13
1.4.4 Factory-applied Color Finish
SECTION 07 41 13
2.1 Roof Panels
SECTION 07 41 13
1.4.1 Qualification of Manufacturer
SECTION 07 41 13
1.4.4 INSTALLATION MANUAL
SECTION 07 41 13
1.8 Warranties
SECTION 07 42 13
2.1.1 Metal Wall Panel
SECTION 07 42 13
2.5 Trapl A84 X
83 X A
X A82
81 AX
AX80
79 AX
AX78
77 AX
AX76
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 6 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 07 42 13
2.1.1 Metal Wall panel
SECTION 07 42 13
2.2 Accessories
SECTION 07 42 13
2.3 Fasteners
SECTION 07 42 13
2.4 Sealant
SECTION 07 42 13
.1 Installation
SECTION 07 42 13
1.4 Warranties
SECTION 07 52 00
1.4.3 Roof plan
SECTION 07 52 00
2.1 Waterproofing Protective Curing
SECTION 07 52 00
2.2 Modified Bitumen Sheets
SECTION 07 52 00
2.5 Primer
SECTION 07 52 00
2.6 Cant and Tapered Edge Strips
SECTION 07 52 00
2.7.3 Vapor Pressure Relief Vents
SECTION 07 52 00
3.2.7 waterproof cement mortar
SECTION 07 52 00
1.4.1 Qualification of Manufacturer
SECTION 07 52 00
1.4.2 Qualification of Applicator
SECTION 07 52 00
3.2.5 Modified Bitumen Membrane A X A100
X A99
X A98
A97 X
A96 X
A95 X
A94 X
A93 X
A92 X
A91 X
X A90
89 AX
A88 X
87 X A
A86 X
85 X A
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 7 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 07 52 00
3.2.6 Flashing
SECTION 07 52 00
3.1.2.2 Torches
SECTION 07 52 00
3.2.8.1 Coating Application
SECTION 07 52 00
1.9 Manufacturer and Installer Warra
SECTION 07 72 00
2.2 Roof ridge ventilators
SECTION 07 72 00
2.3 Stationary roof ventilators
SECTION 07 72 00
2.2 Roof ridge ventilators
SECTION 07 72 00
2.3 Stationary roof ventilators
SECTION 07 72 00
1.7.1 warranty
SECTION 07 92 00
2.1 Sealants
SECTION 07 92 00
2.2 Primers
SECTION 07 92 00
2.3 Bond breakers
SECTION 07 92 00
2.4 Backstops
SECTION 07 92 00
2.1 Sealants
SECTION 08 11 13
2.1 Steel Doors and Frame A115 X
X A114
A113 X
A112 X
A111 X
A110 X
X A109
A108 X
A107 X
A106 X
A105 X
X A104
X A103
X A102
X A101
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 8 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 08 11 13
2.2 Aluminum Door and Frame
SECTION 08 11 13
2.1 Steel Doors and Frame
SECTION 08 11 13
2.2 Aluminum Door and Frame
SECTION 08 11 13
2.3 Hardware and Accessories
SECTION 08 51 13
2.1 Windows
SECTION 08 51 13
2.2.2 Blast Resistant Window
SECTION 08 51 13
2.1 Windows
SECTION 08 51 13
2.2.2 Blast Resistant Window
SECTION 08 51 13
2.2.2 Structural Blast Calculations
SECTION 08 62 00
3.2 Shop Drawings
SECTION 08 62 00
2.3.1.1 Skylights
SECTION 08 62 00
1.5 Warranty
SECTION 08 62 00
1.3 Qualifications
SECTION 09 22 00
2.1 Metal support systems
SECTION 09 22 00
2.2 Access Panels A130 X
A129 X
X A128
X A127
A126 X
A125 X
X A124
A123 X
A122 X
A121 X
A120 X
A119 X
A118 X
A117 X
A116 X
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 9 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 09 29 00
2.1.1 Gypsum Board
SECTION 09 29 00
2.1.2 Gypsum Sheathing Board
SECTION 09 29 00
2.1.3 Joint Treatment Materials
SECTION 09 29 00
2.1.6 Cornerbead and Edge Trim
SECTION 09 29 00
2.1.5 MSDS
SECTION 09 29 01
2.1.1 Silicate Calcium Board
SECTION 09 29 01
2.1.2 Glass Coated Silicate Calcium B
SECTION 09 29 01
2.1.4.1 Screws
SECTION 09 29 01
2.1.5 Adhesives
SECTION 09 29 01
2.1.6 Cornerbead and Edge Trim
SECTION 09 30 00
1.5 Detail Drawings
SECTION 09 30 00
2.1 Tile
SECTION 09 30 00
2.2 Setting-Bed
SECTION 09 30 00
2.4 Mortar, grout, and adhesive
SECTION 09 30 00
2.1 Tile A145 X
A144 X
A143 X
A142 X
A141 X
A140 X
A139 X
A138 X
A137 X
A136 X
X A135
A134 X
A133 X
A132 X
A131 X
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 10 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 09 51 00
1.3 Detail Drawings
SECTION 09 51 00
2.1.1 Acoustic Ceiling Tiles
SECTION 09 51 00
2.1.1 Adhesive
SECTION 09 51 00
2.1.1 Aluminum Corner Edges
SECTION 09 51 00
2.3 Aluminum Spandrel Ceiling
SECTION 09 51 00
2.1.1 Acoustic Ceiling Tiles
SECTION 09 65 00
2.1 Vinyl Composition Tile
SECTION 09 65 00
2.2 Sheet Vinyl Flooring
SECTION 09 65 00
2.3 Moulding
SECTION 09 65 00
2.4 Wall Base
SECTION 09 65 00
2.5 Adhesives
SECTION 09 65 00
2.1 Vinyl Composition Tile
SECTION 09 65 00
3.3 Moisture, Alkalinity and Bond Te
SECTION 09 65 00
3.2 Surface Preparation
SECTION 09 65 00
3.4 Installation Instructions A160 X
A159 X
X C158
A157 X
A156 X
A155 X
A154 X
A153 X
A152 X
A151 X
A150 X
A149 X
A148 X
A147 X
A146 X
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 11 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 09 67 23
2.1 Flooring
SECTION 09 67 23
3.3.2 Floor Surfacing
SECTION 09 67 23
3.2 Mixing
SECTION 09 67 23
2.4 Crackseal
SECTION 09 67 23
1.3 Qualifications of Installer
SECTION 09 67 23
3.1.2 Manufacture repair instruction
SECTION 09 67 23
3.3 Application
SECTION 09 67 23
2.2 Flooring Systems
SECTION 09 68 00
2.1 Carpet
SECTION 09 68 00
2.3 Carpet Moldings
SECTION 09 68 00
2.5 Adhesives and Concrete Primer
SECTION 09 68 00
2.1 Carpet
SECTION 09 72 00
2.1.1 Vinyl Wall Covering
SECTION 09 72 00
2.2 Primer and Adhesive
SECTION 09 72 00
2.1.1 Vinyl Wall Covering A175 X
A174 X
A173 X
A172 X
A171 X
A170 X
A169 X
X D168
X A167
A166 X
X A165
A164 X
A163 X
A162 X
A161 X
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 12 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 09 72 00
2.2 MSDS
SECTION 09 90 00
3.2 sruface prepartion plan
SECTION 09 90 00
2.1 Surface Preparation Materials for
SECTION 09 90 00
2.2 Coating
SECTION 09 90 00
1.8 Color and Texture
SECTION 09 90 00
1.4 MSDS
SECTION 09 90 00
2.4 high pressure water wash cleanin
SECTION 12 21 00
3.2 Installation
SECTION 12 21 00
2.1 Window Blinds
SECTION 12 21 00
3.2 Installation
SECTION 22 00 00
2.1.1 Plug
SECTION 22 00 00
2.3 Termination Sets
SECTION 31 23 00
1.5.1 Shoring and Sheeting Plan
SECTION 31 23 00
3.8.1.1 Density Tests
SECTION 32 11 23
1.6 Plant, Equipment, and Tools A190 X
X A189
A188 X
A187 X
A186 X
A185 X
A184 X
A183 X
X A182
X A181
A180 X
A179 X
A178 X
A177 X
X A176
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 13 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 32 11 23
1.4.1.1 Sieve Analysis
SECTION 32 11 23
1.4.1.2 Liquid Limit and Plasticity In
SECTION 32 11 23
1.4.1.3 Wear Test
SECTION 32 11 23
1.4.1.4 Compaction Test
SECTION 32 11 23
1.4.1.5 Thickness Test
SECTION 32 12 16
2.3 Mix Design
SECTION 32 12 16
1.6 Calibration
SECTION 32 12 16
2.1 Aggregates
SECTION 32 12 16
2.2 Asphalt Cement Binder
SECTION 32 13 13
2.1.3 Aggregate
SECTION 32 13 13
2.1.6 Curing materials
SECTION 32 13 13
2.1.4 Admixtures
SECTION 32 13 13
2.1.1 Cementitious materials
SECTION 32 13 13
2.3 mix design
SECTION 32 13 13
2.1.3 Aggregate X A205
X A204
A203 X
A202 X
A201 X
A200 X
X A199
X A198
X A197
A196 X
X E195
X E194
X A193
X A192
X A191
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 14 of 15
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
LI
C
EN
SE
S
IDIQ for Bldg Exterior/Interior Work FA5209-11-R-0006
TO BE COMPLETED BY PROJECT ENGINNER
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 32 13 13
3.6.2 Concrete slump tests
SECTION 32 13 13
3.6.4 Air content tests
SECTION 32 13 13
3.6.3 Compressive Strength Tests
SECTION 32 13 13
1.4.1 Ready-mixed concrete plant
SECTION 32 13 13
1.4.3 Batch tickets
SECTION 32 92 23
2.4 Fertilizer
SECTION 32 92 23
2.1 Sods
SECTION 32 96 01
1.3.1 Work Plan
SECTION 32 96 01
1.3.5 Photographs
SECTION 32 96 01
3.2.1 Tree-Wound Paint
A215 X
X E214
A213 X
X A212
A211 X
X A210
X A209
X E208
X E207
X E206
SUBMISSION DATE:
A. Within 15days after Basic Contract Award B. W/in 15days after TO C. Within 5days after commencement of appl. work D. Prior to compl. of Const. Pd. of TO E. Consult w/ CI
** Env. Div Only Page 15 of 15
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Pre-proposal Conference Minutes.pdf | ||
| Exhibits.xls | XLS spreadsheet | |
| Exhibits.xls | XLS spreadsheet | |
| SF1442.pdf | ||
| OF17.pdf | ||
| Attachment 4 | — | |
| DD1707.pdf | ||
| Attachment 1 | — | |
| Government Policy Letter | — | |
| Attendees List.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .