DEPARTMENT OF THE ARMY
US ARMY GARRISON - JAPAN
DIRECTORATE OF PUBLIC WORKS
APO Area Pacific 96343-5006
CONTRACT SPECIFICATION
FOR
A-11-135
(HF-00109-1J)
INDEFINITE DELIVERY / INDEFINITE QUANTITY CONTRACT
FOR
BUILDING EXTERIOR /INTERIOR WORK
AT
KANTO PLAIN
8 FEB 2011
A11135
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 35 43 ENVIRONMENTAL MANAGEMENT
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 14 ASBESTOS HAZARD CONTROL ACTIVITIES
02 82 33 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY (WOOD SIDING)
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 41 13 METAL ROOF PANELS
07 42 13 WALL PANELS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 72 00 ROOF VENTILATORS, GRAVITY-TYPE
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 DOORS AND FRAMES
08 51 13 ALUMINUM WINDOWS
08 62 00 SKYLIGHTS
DIVISION 09 - FINISHES
09 22 00 METAL SUPPORT ASSEMBLIES
09 29 00 GYPSUM BOARD
09 29 01 SILICATE CALCIUM BOARD
09 30 00 TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23 RESISTIVE RESINOUS FLOORING
09 68 00 CARPET
09 72 00 WALL COVERINGS
09 90 00 PAINTS AND COATINGS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
PROJECT TABLE OF CONTENTS Page 1
DIVISION 22 - PLUMBING
22 00 00 MECHANICAL AND ELECTRICAL WORK
DIVISION 26 - ELECTRICAL
26 00 00 ELECTRICAL
DIVISION 31 - EARTHWORK
31 23 00 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13 PORTLAND CEMENT CONCRETE PAVEMENT
32 92 23 SODDING
32 96 01 TRIMMING, PRUNING, AND REMOVAL OF TREES
ATTACHMENTS - INSTALLATION MAPS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2 shigeru.akata Typewritten Text
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SCOPE
The work covered by these contract documents consist of furnishing all supervision, labor, equipment, and materials necessary to perform all operations required to complete ready for use unless otherwise specified herein this specification.
1.2 SUBMITTALS
The following shall be submitted to the Contracting Officer for approval.
SD-01 Preconstruction Submittals
Safety Plan
Environmental Plan
Memorandum for Hazardous Material Usage
SD-07 Certificates
Site Safety and Health Officer
Site Manager
SD-11 Closeout Submittals
As-Built Drawing
1.3 PRINCIPAL FEATURES OF WORK
The following principal features are expressed in general terms and in no way shall limit the responsibility of the contractor in performing all work indicated.
The work items for sustainment / restoration, modernization, (S/RM) work for maintenance of building exterior, repair/construction of building exterior, maintenace of building interior, repair /construction of building interior, removal of existing building (demolition work ), removal / control of hazardous materials to include asbestos and lead base paint, affected work in removal process, and temporary work; and all other incidental work for above work which are described in Exhibits.
All work to be performed under this contract are listed in the pricing exhibits attached to the solicitation document. The principal features not mentioned in the Exhibits are described in this contract specification. Prices for the items in the Exhibits shall cover all necessary costs to complete the work in accordance with the contract specification and terms of the contract. Payments under this contract will be made for the work actually performed and accepted by the Government.
The indefinite delivery / indefinite quantity (IDIQ) contract projects shall cover the Kanto Plain, including Camp Zama, Sagamihara Family Housing Area, Sagami General Depot, Yokohama North Dock and Akasaka Press Center.
SECTION 01 11 00 Page 1
Maintain a management office within commuting distance of Camp Zama, in order to receive requests for joint measurement & task order & other management services related to this contract accomplishment.
Individual jobs will vary in size and scope.
1.4 Performance Periods
The contractor shall be given the following number of calendar days as a performance period to complete individual project(s) assigned by each Task Order (TO). Each performance period includes the time for contractor's material procurement, mobilization, submission of all necessary material submittals, quality control, on-site work, etc., to complete each project within required performance period. Material submittals include all necessary technical documents such as shop drawings, test reports, work plans, qualifications, and all other requirements described in this contract specification.
Project Value Performance Period
2,500,000 YEN or less 45 Calendar Days 2,500,001 YEN to 10,000,000 YEN 90 Calendar Days 10,000,001 YEN or 20,000,000 YEN 135 Calendar Days 20,000,001 YEN or above 210 Calendar Days
NOTE: The Government may provide the contractor a list of necessary material submittals for each project at the time of TO issuance. The Government may request submission of additional material submittals to the contractor. The Government reserves the right to request additional submittal items to the contractor during the performance period.
Additional Time 1: The contractor shall be given additional (14) calendar days for procurement of materials for skylights (Item Nos. BB 33,34,35,36,and 37) in each project.
Additional Time 2: The contractor shall be given additional (21) calendar days for procurement of materials for ventilator (Item No. BB
31) in each project.
Additional Time 3: The contractor shall be given additional (90) calendar days for procurement of materials for AT/FP window (Item No. BD
11) in each project.
Additional Time 4: For each project that requires to construct decontamination room(Item No EA 9), fourteen (14) calendar days will be added to the TO's performance period specified at the above.
Additional Time 5: For each project that requires to construct sound proofing doors (Items Nos. DD 6, and 7), seven (7) calendar days will be added to the TO's performance period specified at the above.
In case plural different additional items specified above are applied to items and included in a project, only the longest time shall govern to establish a total performance period for each project.
1.5 INSTALLATION/BASE PASS
The U.S. Government will issue all required Installation/Base Passes and Controlled Area Badges to contractor personnel at no cost to the contractor. The Prime contractor shall be responsible for all passes issued to his own or his subcontractor's employees under this contract.
The contractor shall return all applicable passes upon termination of employment or completion of this contract to the Japanese Pass Section, and a certificate of receipt shall be obtained. Final payment will be
SECTION 01 11 00 Page 2 withheld until the contractor has been relieved of all accountability and/or obtained the necessary pass clearance certificate for Government issued installation/base passes used in the performance of this contract.
1.6 AVAILABILITY OF WORK SITE AND WORKING DAYS & HOURS
The work site will be made available for the contractor's performance as follows:
The normal working hours are generally Monday - Friday, 5 days a week, from 8:00 am - 5:00 pm (excluding U.S. holidays).
However, the working days and hours may vary depending on individual project work sites such as hospital, child care center/school, restricted area, etc., and work scopes requiring utility outages, noisy demolition work (such as removal of concrete), physical removal of hazardous materials from occupied space, etc., which may be required to perform after the normal working hours or on weekends (including U.S.
holidays).
Considering such factors, working days and hours will be determined by the government. The working conditions will be addressed at each project site visit/survey and jointly be confirmed. At that time, if any adjustment is required by the contractor due to variance to the normal working conditions above, the contractor shall submit the intent to the government. Variance to the normal working conditions including adjustment, if any and as mutually agreed upon, will be incorporated into task order.
If the contractor desires to work other than normal working days and hours for his convenience, the contractor must have approval from the government. If approval is authorized, the contractor should refrain from any work that covers, conceals, or buries any portion of the work requirements. All work done during other than normal working conditions will be readily visible and available for the government inspections the following normal work day. Work performed under other than normal working conditions when required by the contractor will not be entitled to any adjustment to the contract terms.
All work under this contract shall be coordinated through and approved by the government construction inspector.
U.S. Holidays:
1st of January New Year's Day 3rd Monday of January Martin Luther King Jr. Birthday 3rd Monday of February Washington's Birthday Last Monday of May Memorial Day 4th of July Independence Day 1st Monday of September Labor Day 2nd Monday of October Columbus Day 11th of November Veterans Day 4th Thursday of November Thanksgiving Day 25th of December Christmas Day
1.7 UTILITIES
Water and electric utilities will be furnished by the U.S. Government at no cost to the contractor.
Cross Connection: Contractor shall be responsible for preventing actual or potential cross connections between potable and non-potable water supply during the construction work. The contractor must notify the Construction Inspector for use, SECTION 01 11 00 Page 3 installation or maintenance of potable water service connection to ensure the following provision:
a. No water service connection will be installed / maintained to / at any premises where actual or potential cross connections to the potable water system may exist, unless such actual or potential cross connections are properly abated or controlled.
b. No connection will be installed or maintained whereby an auxiliary water supply may enter a public water system, unless such auxiliary water supply will have been approved by the Construction Inspector.
c. No water service connection will be installed / maintained to / at any premises in which the plumbing system, facilities and fixtures have not been constructed and installed using acceptable plumbing practices.
1.7.1 Utility Outage
The contractor shall submit a schedule of outage to the Construction Inspector and shall notify the Construction Inspector in writing no less than 21 days in advance of the proposed interruptions. Coordinate with the Construction Inspector when this requirement of 21 days cannot be met.
1.7.2 Fire Protection System Outage
Provide at least 21 calendar days advance notice of planned utility outages including fire systems. Coordinate with the Construction Inspector when this requirement of 21 days cannot be met. In each request, specify each utility disconnected, the time and date the service will be deactivated and the anticipated time and date service will be reactivated. Do not disconnect or deactivate any base utility systems without advance Government Construction Inspector approval.
Fire system disconnection and reactivation requires the coordination with Fire and Emergency Service Division through the Construction Inspector. No utility outages will be permitted until the contractor has submitted the request form and receives an approval of the Construction Inspector, and other applicable personnel.
1.8 TEMPORARY TELEPHONE
Upon request, the contractor may install in his field office a Government telephone (Class B) for his use, based on his normal submission of a work order to the area communication officer. All expenses generated from, or related to his use of such instrument will be borne by the contractor.
1.9 OCCUPANCY
The facilities/areas will and/or will not be occupied. The contractor shall provide the construction plan and schedule to be coordinated with the Construction Inspector for all work to be performed.
1.10 REGULATIONS
1.10.1 Fire
The contractor shall comply with all pertinent requirements of the U.S.
Army and USAG-J Regulations 420-90, and ensure compliance by all subcontractors. All temporary wiring at the construction site shall be installed with ground fault protection.
SECTION 01 11 00 Page 4
1.10.2 Safety
The contractor shall not commence work at the job site until an Accident Prevention Plan and Job Hazard Analysis are submitted for review and approved by the Contracting Officer. The contractor is responsible for reviewing Section 1 of EM 385-1-1, the U.S. Army Corps of Engineers' Safety and Health Requirements manuals. The contractor shall be responsible to submit the Accident Prevention Plan, Job Hazard Analysis. The Contractor shall obtain approval and signature from the Safety Office prior to submitting to the Contracting Officer.
1.10.3 Environmental
All work pertinent to environmental protection such as storm water, hazardous waste, solid waste and lead-based paint shall follow the requirements of Japan Environmental Governing Standards (JEGS) and Army Technical Manual 38-410. Per the AR200-1 and the Installation Environmental Management System Implementation Plan (EMSIP) of latest edition, all the contractor personnel are required to complete the Environmental Management System Awareness training prior to commencing operation on any United States Army Garrison Japan facilities. The certificates shall be submitted for review and approved by the Contracting Officer.
1.10.4 Site Safety and Health Officer (SSHO)
Per EM 385-1-1, the contractor shall appoint SSHO for this project. The contractor shall submitt the copy of training certificate to the Contracting Officer for approval.
1.10.5 Site Manager (Genba-kantoku)
Site manager shall be selected for every contract as a minimum. Site mangers shall be licensed for appropriate discipline of architecture, mechanical, piping, electrical, civil, or landscape suitable for each contract; 1st or 2nd Sekoukanri-gishi. The contractor shall submit the copy of licenses to the Contracting Officer for approval.
1.11 GUIDANCES AND REFERENCES
The matters that have not been described in Government drawings and/or specifications shall refer to the latest editions of following the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) publications:
Public Building Master Guide Specifications for Architectural Work ( Kohkyou Kenchiku Kouji Hyoujyun Shiyou-sho Kenchiku Kouji hen)
Public Building Master Guide Specifications for Electrical Work ( Kohkyou Kenchiku Kouji Hyoujyun Shiyou-sho Denki Setsubi Kouji-hen)
Public Building Master Guide Specifications for Mechanical Work ( Kohkyou Kenchiku Kouji Hyoujyun Shiyou-sho (Kikai Setsubi Kouji hen)
Public Building Standard Detail Drawings for Architectural Work ( Kenchiku Kouji Hyoujyun Shousaizu)
Building Standard Detail Drawings for Electrical Work (Koukyou Kenchiku Setsubi Kouji Hyoujyunzu (Denki Setsubi Kouji hen)
Building Standard Detail Drawings for Mechanical Work (Koukyou Kenchiku Setsubi Kouji Hyoujyunzu (Kikai Setsubi hen)
SECTION 01 11 00 Page 5
1.12 DAMAGE TO FACILITIES
1.12.1 General
All damaged portions incurred due to replacement and installation work shall be repaired and restored to match the original condition by the contractor at no cost to the Government.
1.12.2 Utilities
In the event of the contractor-caused utility failure/disruption, the contractor will first make the area safe, then immediately contact the Construction Inspector and the Contracting Officer. The Construction Inspector is responsible for coordination with the Engineering Division, DPW. If the damaged utilities were previously known or shown to the contractor, and there was negligence on his part, the utilities will be repaired by the contractor in a timely manner at no cost to the Government.
1.13 SCHEDULE, PERMIT, AND PLAN
1.13.1 Work Schedule
The contractor shall provide and submit to the Construction Inspector a detailed work progress schedule in the form of a Bar Chart Work Schedule showing the step-by-step phases of work to be accomplished prior to performing actual work. The contractor shall require coordination with the Construction Inspector to make a work progress schedule.
1.13.2 Directorate of Public Works (DPW) Excavation Permit
It is the contractor's responsibility to prepare the Excavation Permit at their own expense. The contractors shall not commence work for any excavation, 300 mm or more in depth at the job site until the DPW Excavation Permit form is submitted to the Construction Inspector reviewed and approved by the listed DPW organizations, Security Police, Safety, Communications, Commercial Utility Company and Chief of Engineering Division, DPW. Only after the permit is approved and signed by organizations and other agencies listed in the DPW Excavation Permit, may the contractor commence with the excavation work. Without a permit, the excavation work will be stopped, until such the time an approved permit is obtained.
1.13.3 Temporary Protection Plans (Kasetsu Keikaku-sho)
Upon request by the Government the Contractor shall provide appropriate temporary protection measures to protect workers and Government personnel at construction work site during construction, and submit the temporary protection plans to the Construction Inspector for approval prior to on-site work. The Contractor shall be responsible to minimize the inconvenience and avoid any danger to Government personnel and workers.
1.13.4 License for Heavy Equipment Operators
In the case of using heavy equipment in the Government properties, the Contractor shall provide a copy of the license for heavy equipment to the Safety Office through the Construction Inspector prior to actual commencement.
1.14 QUALITY CONTROL/CONSTRUCTION INSPECTION
The contractor shall establish and maintain an effective quality control (QC) system in compliance with the contract clause entitled Inspection
SECTION 01 11 00 Page 6 of Construction. The quality control system shall consist of plans, procedures, and organization necessary to provide materials, equipment, workmanship, fabrication, construction and operations, which comply with contract requirements. The system shall cover construction operations both onsite and offsite, and shall be keyed to the proposed construction sequence.
1.15 OFF LIMITS AND WET PAINT SIGNS
The contractor shall make stenciled 2'-0" x 3'-0", "OFF LIMITS" and "Wet Paint" signs made of sheet metal or plywood as required and prominently post these at the job site.
1.16 SOLID WASTES
Solid waste (construction and demolition debris, etc.) generated from this project shall be recycled/disposed of at an authorized off-base facility/facilities in accordance with Chapter 7 of JEGS, ARs-200-1 (Environmental Protection and Enhancement) and 420-49 (Utility Services) as well as applicable host nation's laws and regulations.
1.17 WORK RECORDS
1.17.1 As-Built Drawing
The Government may provide the Contractor current As-Built Drawings (hard copy) to develop new As-Built Drawings reflecting all completed work. A copy of the drawings shall be kept at the work site during construction to show all changes from the original documents generated by modifications and the exact as-built locations, sizes, types of equipment, hidden utilities or other items. Upon completion of the installation and prior to final inspection, the contractor shall submit a copy of draft As-Built drawings and CADD data. The final As-Built CADD drawing files shall be submitted and formatted with the DPW format in DGN or DWG file format.
1.17.2 Photographic Records
The contractor shall furnish the Construction Inspector with the photographic records of each sequence of work which will be hidden or if it is difficult to examine the condition of work, such as reinforcement for concrete, underground piping system, air duct system above ceiling and etc.
1.18 ENGLISH COMMUNICATION
1.18.1 Written Communication in English
All submittals required under this contract (including but not limited to: safety analysis plan, quality control plan, all correspondence, and all other written communications, documents, drawings, reports, manuals, etc.) shall be written in English or translated into English before being provided to the Government by the contractor.
1.18.2 English Speaking Representative
At all times during the contract period the contractor shall have an employee capable of fluent bilingual (Japanese & English) speech at the job site. The bilingual interpreter shall have the capability to receive and issue technical explanations and instructions between the Government representative and the contractor.
SECTION 01 11 00 Page 7
PART 2 PRODUCTS
2.1 LIMITATIONS FOR USE OF MATERIALS
The contractor shall submit the memorandum for hazardous material usage that pledges the conformance of the following requirements signed and sealed by the authority of the contractor. The contractor shall be responsible for selecting and determining the materials used for this contract for conformance with this specification. The contractor shall provide the Contracting Officer a hazardous material (HM) inventory and Material Safety Data Sheets (MSDSs in English) prior to such HM being delivered to the job sites.
a. Do not use materials containing greater than 0.1 % asbestos.
b. Do not use materials containing greater than 0.06 % lead by weight in the total nonvolatile content of liquid paint and 0.5 % (5000 ppm) by weight of Paint in Place. Further, do not use materials containing detectable lead, mercury, chromium and cadmium by atomic absorption spectrum (AAS) deemed as Heavy Metal-Based Paint (HMBP).
c. Do not use materials containing chlorpyrifos.
d. Use Formaldehyde Rated of 4-stars for all products.
2.2 INSPECTION AND RANDOM SAMPLING BY THE GOVERNMENT
The Government reserves the right to inspect all materials to be used in performance of the project and to take samples to examine the contents of asbestos, lead, etc. to measure the compliance with these requirements specified in this specifications. Whenever the Government becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public, Government personnel or workers, the Government will notify the Contractor orally, with written confirmation, and direct immediate initiation of corrective action at the Contractor's sole cost. This notice, when delivered to the Contractor or the Contractor' representative at the work site, is considered sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor must immediately take corrective action to replace the noncompliance with materials/equipment complied with the requirements. If the Contractor fails or refuses to promptly take corrective action, the Government may issue an order stopping all or part of the work until satisfactory corrective action has been taken.
The Contractor is not entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this contract.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 8
SECTION 01 35 29
SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety -- Safety and Health Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1926 Safety and Health Regulations for Construction
1.2 SUBMITTALS
The following shall be submitted to the Contracting Officer for approval.
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP)
SD-07 Certificates
Certificate of Competent Person
Confined Space Entry Permits
1.3 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, work performed shall comply with USACE EM 385-1-1, and the following federal, state, and local, host nation laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.
1.4 ACCIDENT PREVENTION PLAN (APP) ON CONFINED SPACE WORK
The Contractor shall use a qualified person to prepare the written site-specific Accident Prevention Plan (APP). Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for
SECTION 01 35 29 Page 1 informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Certificate of Competent person (Sanso Ketsubo Kiken Sagyou Shuninsha):
Provide a competent person for confined space in accordance with local regulation and OSHA.
Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.
The APP shall be continuously reviewed and amended, as necessary, throughout the life of the contract. Unusual or high-hazard activities not identified in the original APP shall be incorporated in the plan as they are discovered.
1.5 DISPLAY OF SAFETY INFORMATION
Within 1 calendar day after commencement of work, erect a safety bulletin board at the job site. The safety bulletin board shall include information and be maintained as required by EM 385-1-1, section 01.A.06. Confined Space Entry Permit shall also be posted as an additional items.
1.6 EMERGENCY MEDICAL TREATMENT
The contractor will arrange for their own emergency medical treatment.
Government has no responsibility to provide emergency medical treatment.
PART 2 PRODUCTS
Not Used.
2.1 CONFINED SPACE SIGNAGE
The Contractor shall provide permanent signs integral to or securely attached to access covers for new permit-required confined spaces.
Signs wording: "DANGER--PERMIT-REQUIRED CONFINED SPACE - DO NOT ENTER -" in bold letters a minimum of 25 mm (one inch) in height and constructed to be clearly legible with all paint removed. The signal word "DANGER" shall be red and readable from 1.52 m (5 feet).
PART 3 EXECUTION
3.1 WORK IN CONFINED SPACES
The Contractor shall comply with the requirements in Section 06.I of USACE EM 385-1-1, OSHA 29 CFR 1910.146 and OSHA 29 CFR 1926.21(b)(6).
Any potential for a hazard in the confined space requires Confined Space Entry Permits system to be used, USAG-J Form 1835 and Appendix D to
1910.146 -Permits.
a. Entry Procedures. Prohibit entry into a confined space by personnel for any purpose, including hot work, until the qualified person has conducted appropriate tests to ensure the confined or enclosed space is safe for the work intended and that all potential hazards are controlled or eliminated and documented. (See Section 06.I.06 of USACE EM 385-1-1 for entry procedures.)
SECTION 01 35 29 Page 2
b. Forced air ventilation is required for all confined space entry operations and the minimum air exchange requirements must be maintained to ensure exposure to any hazardous atmosphere is kept below its' action level.
3.2 MEASUREMENT RULE
Miscellaneous: The item listed below shall be added when the work area is considered as confined space. The item listed shall include all labor, equipment, tools, and materials necessary to perform work in confined space.
The item shall cover the confied space up to 5 square meter in area and 2.5 m in depth. Space exceeding the size indicated shall be considered separately.
SECTION 01 35 29 Page 3
SECTION 01 35 43
ENVIRONMENTAL MANAGEMENT
PART 1 GENERAL
The contractor shall perform the work minimizing environmental pollution and damage as the result of construction and/or demolition operations.
Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the utility of the environment for aesthetic, cultural and/or historical purposes. The control of environmental pollution and damage requires consideration of land, water, and air, and includes management of visual aesthetics, noise, solid waste, as well as other pollutants.
The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this contract.
1.1 REFERENCE
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
JAPAN ENVIRONMENTAL GOVERNING STANDARDS (JEGS)
1.2 PRECONSTRUCTION MEETING
After award of Contract and prior to commencement of the work, the Contractor shall schedule and conduct a meeting with the Construction Inspector to discuss the proposed Environmental Protection Plan and to develop a mutual understanding relative to the details of environmental protection. The requirements for this meeting may be fulfilled during the coordination and mutual understanding meeting.
1.3 ENVIRONMENTAL PROTECTION PLAN
Prepare and submit an Environmental Protection Plan to the Environmental Division office through the Construction Inspector. At a minimum, address the following elements in accordance with this section:
a. Methods for protection of features to be preserved within authorized work areas like trees, shrubs, vines, grasses and ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, archaeological, and cultural resources.
b. Procedures to be implemented to provide the required environmental protection, to comply with the applicable laws and regulations, and to correct pollution due to accident, natural causes, or failure to follow the procedures of the environmental protection plan.
c. Traffic control plan including measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather, and the amount of mud transported onto paved public roads by vehicles or runoff.
Revise and resubmit Plan as required by the Environmental Division office. Approval of Contractor's Plan will not relieve the Contractor of responsibility for compliance with applicable environmental
SECTION 01 35 43 Page 1 regulations.
1.4 PERMITS
The contractor shall obtain all needed permits or licenses. The Government will not obtain any permits for the subject project; see Contract Clause PERMITS AND RESPONSIBILITIES. The contractor shall be responsible for implementing the terms and requirements of the appropriate permits as needed and for payment of all fees.
1.5 NOTIFICATION
The Construction Inspector will notify the contractor in writing of any observed noncompliance with the previously mentioned local laws or regulations, permits, and other elements of the contractor's environmental protection plan. The contractor shall, after receipt of such notice, inform the Construction Inspector of proposed corrective action and take such action when approved. If the contractor fails to comply promptly, the Construction Inspector may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions shall be granted or costs or damages allowed to the contractor for any such suspensions.
1.6 SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC)
The contractor shall follow the installation SPCC plan and Oil and Hazardous Substance (OHS) pollution Contingency Plan in case of spill or release of POL and/or hazardous substances. The Contractor shall immediately notify Fire and Emergency Services, Directorate of Emergency Services (DES), U.S. Army Garrison Japan of any spill incidents that occur on the installation through the Emergency Phone Number. The Contractor shall be liable for containment and clean-up of the site.
1.7 CONTRACTOR FACILITIES AND WORK AREAS
The contractor's field offices, staging areas, stockpile storage, and temporary buildings shall be placed in areas designated on the drawings or as directed by the Construction Inspector. Temporary movement or relocation of contractor facilities shall be made only when approved by the Construction Inspector.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 PROTECTION OF NATURAL RESOURCES
Comply with applicable regulations and these specifications. Preserve the natural resources within the project boundaries and outside the limits of permanent work performed under this Contract in their existing condition or restore to an equivalent or improved condition as approved by the Contracting Officer.
3.1.1 Water Resources
Comply with requirements of JEGS. Prevent oily or other hazardous substances from entering the ground, drainage areas, or local bodies of water. Store and service construction equipment at areas designated for collection of oil wastes. Prevent ponding of stagnant water conducive to mosquito breeding habitat. Prevent run-off from site during demolition and construction operations.
SECTION 01 35 43 Page 2
3.1.2 Land Resources
Prior to construction, identify land resources to be preserved within the work area. Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms without permission from the Contracting Officer.
3.1.2.1 Erodible Soils
Plan and conduct earthwork to minimize the duration of exposure of unprotected soils, except where the constructed feature obscures borrow areas, quarries, and waste material areas. Clear areas in reasonably sized increments only as needed to use the areas developed. Form earthwork to final grade as shown. Immediately protect side slopes and back slopes upon completion of rough grading.
3.1.2.2 Erosion and Sedimentation Control Devices
Construct or install temporary and permanent erosion and sedimentation control features as required.
3.1.2.3 Tree and Plant Protection
Prior to start of construction, tag each tree and plant scheduled to remain. In the event of damage to tree or plant, the Government may, at the Contracting Officer's discretion, deduct the indicated value of the damaged tree or plant from the Contract Sum.
3.1.3 Air Resources
Equipment operation and activities or processes performed by the contractor in accomplishing the specified demolition work shall be in accordance with the performance laws and standards. Monitoring of air quality shall be the contractor's responsibility.
a. Dust particles; aerosols and gaseous by-products from construction activities; and processing and preparation of materials shall be controlled at all times, including weekends, holidays and hours when work is not in progress. The contractor shall maintain excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil area, borrow areas, and other work areas within or outside the project boundaries free from particulate which would cause the air pollution standards to be exceeded or which would cause a hazard or a nuisance shall be performed as the work proceeds and whenever a particulate nuisance or hazard occurs.
b. Odors shall be controlled at all times for all construction activities, processing and preparation of materials.
c. The contractor shall keep construction activities under surveillance and control to minimize environment damage by noise.
3.2 WASTE DISPOSAL
Solid wastes shall be placed in containers which are emptied on a regular schedule. Handling and disposal shall be conducted to prevent contamination. Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste. Solid waste generated from this project shall be recycled/disposed at an authorized off-base facilities in accordance with JEGS as well as applicable host nation's laws and regulations. Asbestos containing materials shall be disposed at an off-base in accordance with the requirements of JEGS. Burning at the project site will not be permitted. Hazardous Waste generated from this project shall be
SECTION 01 35 43 Page 3 accumulated at the designated Hazardous Waste Accumulation Point (HWAP) permitted by the DPW Environmental Division and DES Fire and Emergency Services Division until for off-post disposal. HWAP shall be maintained IAW the JEGS, to include storage limits, secondary containment, and weekly inspections.
3.3 CLEANUP AND RESTORATION
The contractor shall clean up all areas used for construction or demolition. The contractor shall restore landscape features damaged or destroyed during construction operations outside the limits of the approved work areas.
SECTION 01 35 43 Page 4
SECTION 01 74 19
CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)
1.2 GOVERNMENT POLICY
Government policy is to apply sound environmental principles in the design, construction and use of facilities. As part of the implementation of that policy the Contractor shall: (1) practice efficient waste management when sizing, cutting, and installing products and materials and (2) use all reasonable means to divert construction and demolition waste from landfills and incinerators and to facilitate their recycling or reuse. A minimum of 50 percent by weight of total project solid waste shall be diverted from the landfill.
1.3 MANAGEMENT
Take a pro-active, responsible role in the management of construction and demolition waste and require all subcontractors, vendors, and suppliers to participate in the effort. Construction and demolition waste includes products of demolition or removal, excess or unusable construction materials, packaging materials for construction products, and other materials generated during the construction process but not incorporated into the work. In the management of waste, consideration shall be given to the availability of viable markets, the condition of the material, the ability to provide the material in suitable condition and in a quantity acceptable to available markets, and time constraints imposed by internal project completion mandates. The Contractor is responsible for implementation of any special programs involving rebates or similar incentives related to recycling of waste. Revenues or other savings obtained for salvage, or recycling accrue to the Contractor.
Appropriately permit firms and facilities used for recycling, reuse, and disposal for the intended use to the extent required by local regulations. Also, provide on-site instruction of appropriate separation, handling, recycling, salvage, reuse, and return methods to be used by all parties at the appropriate stages of the project.
1.4 SUBMITTALS
The following shall be submitted to the Contracting Officer for approval.
SD-01 Preconstruction Submittals
Waste Management Plan; (LEED)
SD-11 Closeout Submittals
Manifest
SECTION 01 74 19 Page 1
1.5 MEETINGS
Conduct Construction Waste Management meetings. After award of the Contract and prior to commencement of work, schedule and conduct a meeting with the Construction Inspector to discuss the proposed Waste Management Plan and to develop a mutual understanding relative to the details of waste management. The requirements for this meeting may be fulfilled during the coordination and mutual understanding meeting. At a minimum, environmental and waste management goals and issues shall be discussed.
1.6 WASTE MANAGEMENT PLAN
The plan shall demonstrate how the project waste diversion goal shall be met and shall include the following:
a. Name of individuals on the Contractor's staff responsible for waste prevention and management.
b. Actions that will be taken to reduce solid waste generation, including coordination with subcontractors to ensure awareness and participation.
c. Description of the regular meetings to be held to address waste management.
d. Description of the specific approaches to be used in recycling/reuse of the various materials generated, including the areas on site and equipment to be used for processing, sorting, and temporary storage of wastes.
e. Characterization, including estimated types and quantities, of the waste to be generated.
f. Name of landfill and/or incinerator to be used and the estimated costs for use.
g. Identification of local and regional reuse programs, including non-profit organizations such as schools, local housing agencies, and organizations that accept used materials such as materials exchange networks and Habitat for Humanity. Include the name, location, and phone number for each reuse facility to be used, and provide a copy of the permit or license for each facility.
h. List of specific waste materials that will be salvaged for resale, salvaged and reused on the current project, salvaged and stored for reuse on a future project, or recycled. Recycling facilities that will be used shall be identified by name, location, and phone number, including a copy of the permit or license for each facility.
i. Identification of materials that cannot be recycled/reused with an explanation or justification, to be approved by the Construction Inspector.
j. Description of the means by which any waste materials identified in item (h) above will be protected from contamination.
k. Description of the means of transportation of the recyclable materials (whether materials will be site-separated and self-hauled to designated centers, or whether mixed materials will be collected by a waste hauler and removed from the site).
SECTION 01 74 19 Page 2
l. Anticipated net cost savings determined by subtracting Contractor program management costs and the cost of disposal from the revenue generated by sale of the materials and the incineration and/or landfill cost avoidance.
Revise and resubmit Plan as required by the Construction Inspector.
Approval of Contractor's Plan will not relieve the Contractor of responsibility for compliance with applicable environmental regulations or meeting project cumulative waste diversion requirement. Distribute copies of the Waste Management Plan to each subcontractor, the Quality Control Manager, and the Construction Inspector.
1.7 MANIFEST
Manifest shall be maintained to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed by landfill or incineration. Quantities must be measured by weight and must be consistent throughout. List each type of waste separately noting the disposal or diversion date. Identify the landfill, recycling center, waste processor, or other organization used to process or receive the solid waste. Provide explanations for any waste not recycled or reused. The records shall be made available to the Construction Inspector during construction, and a copy of the records shall be delivered to the Contracting Officer upon completion of the construction.
1.8 CONSTRUCTION AND DEMOLITION WASTE DATA SUMMARY
Data of construction and demolition waste generated from the project shall be summarized onto the C&D Waste Data Summary form. The instructions for preparation on the form shall be followed in order for data entry to be done properly. The form shall be sent to the Construction Inspector upon completion of the project.
1.9 COLLECTION
Separate, store, protect, and handle at the site identified recyclable and salvageable waste products in a manner that maximizes recyclability and salvagability of identified materials. Provide the necessary containers, bins and storage areas to facilitate effective waste management and clearly and appropriately identify them. Provide materials for barriers and enclosures around recyclable material storage areas which are nonhazardous and recyclable or reusable. Locate out of the way of construction traffic. Provide adequate space for pick-up and delivery and convenience to subcontractors. Recycling and waste bin areas are to be kept neat and clean, and recyclable materials shall be handled to prevent contamination of materials from incompatible products and materials. Clean contaminated materials prior to placing in collection containers. Use cleaning materials that are nonhazardous and biodegradable. Handle hazardous waste and hazardous materials in accordance with applicable regulations and coordinate with Section 01 35 43 ENVIRONMENTAL MANAGEMENT. Separate materials by one of the following methods:
1.9.1 Source Separated Method.
Waste products and materials that are recyclable shall be separated from trash and sorted and then transported to the respective recycling facility for further processing. Deliver materials in accordance with recycling or reuse facility requirements (e.g., free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process). Separate materials into the following category types as appropriate to the project waste and to the available recycling and reuse programs in the project area. The recommended recyclable
SECTION 01 74 19 Page 3 materials shall include all but not limited to the followings:
a. Land clearing debris.
b. Asphalt.
c. Concrete and masonry.
d. Metal (e.g. banding, stud trim, ductwork, piping, rebar, roofing, other trim, steel, iron, galvanized, stainless steel, aluminum, copper, zinc, lead brass, bronze).
e. Wood (nails and staples allowed).
f. Debris.
g. Glass (colored glass allowed).
h. Paper.
i. Plastic.
j. Gypsum.
k. Non-hazardous paint and paint cans.
l. Carpet.
m. Ceiling tiles.
n. Insulation.
o. Beverage containers.
1.9.2 Co-Mingled Method.
Waste products and recyclable materials shall be placed into a single container and then transported to a recycling facility where the recyclable materials are sorted and processed.
1.9.3 Other Methods.
Other methods proposed by the Contractor may be used when approved by the Construction Inspector.
1.10 DISPOSAL
Control accumulation of waste materials and trash. Recycle or dispose of collected materials off-site at intervals approved by the Construction Inspector and in compliance with waste management procedures. Except as otherwise specified in other sections of the specifications, disposal shall be in accordance with the following:
1.10.1 Reuse.
First consideration shall be given to salvage for reuse since little or no re-processing is necessary for this method, and less pollution is created when items are reused in their original form. Coordinate reuse with the Construction Inspector. Sale or donation of waste suitable for reuse shall be considered.
1.10.2 Recycle.
Waste materials not suitable for reuse, but having value as being
SECTION 01 74 19 Page 4 recyclable, shall be made available for recycling. Arrange for timely pickups from the site or deliveries to recycling facilities in order to prevent contamination of recyclable materials.
1.10.3 Waste.
Materials with no practical use or economic benefit shall be disposed at a landfill or incinerator.
1.10.4 Return
Set aside and protect misdelivered and substandard products and materials.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 74 19 Page 5
SECTION 02 41 00
DEMOLITION AND DECONSTRUCTION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety -- Safety and Health Requirements
1.2 GENERAL REQUIREMENTS
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site daily; do not allow accumulation inside or outside buildings. The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Construction Inspector. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
1.3 SUBMITTALS
The following shall be submitted to the…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Pre-proposal Conference Minutes.pdf | ||
| Exhibits.xls | XLS spreadsheet | |
| Attachment 3 | — | |
| Exhibits.xls | XLS spreadsheet | |
| SF1442.pdf | ||
| OF17.pdf | ||
| Attachment 4 | — | |
| DD1707.pdf | ||
| Government Policy Letter | — | |
| Attendees List.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .