Statement of work.pdf
PDF 396 KB Posted
- Attached to
- Notice of Intent to Single Source - Potter Fitness 24/7 Security Relocation Service, Misawa AB, Japan
- Solicitation number
- FA520526QB047
About this file
This is a Statement of Work (SOW) for the relocation and upgrade of a 24/7 Access Control and Surveillance System at Potter Fitness Center, Misawa Air Base, Japan, current as of 30 March 2026.
The contractor shall relocate existing access control and surveillance equipment from Building 622 to Building 620 and install 16 of 20 cameras in Building 1006 (Community Commons). Specific relocatable items include one maglock, one card scanner, one motion sensor, two hub panels, audio-visual equipment from fitness rooms (projectors, speakers, screens, amplifiers, training systems), and 20 cameras. The contractor must provide all mounting, wiring, configuration, and system integration equipment; install fiber optic cabling between Buildings 622 and 620 through SANWA Engineering subcontract; provide a new portable Audio/Visual system for the New Aerobics Room in Building 620 (not surface-mounted); and supply a new 24/7 locking system for Building 1006's front door integrated with the Building 620 system. Work must comply with OSHA standards, U.S. Air Force safety requirements, and Japanese environmental regulations. Installation occurs in five coordinated phases with equipment removal and fiber optic installation completed by 30 April 2026, followed by relocation to Building 620, camera installation in Building 1006, and final integration and testing. Normal work hours are Monday through Friday, 0830 to 1630, excluding U.S. Federal holidays. The contractor must obtain base passes for all employees using Form 35 SFS 5-1 and return employees upon completion. Contractor personnel require security systems and camera installation certifications and experience, must present professional appearance with company identification, and cannot include U.S. Government employees without ethics approval. Required submittals include equipment specifications, wiring diagrams, as-built drawings, and operation and maintenance manuals in electronic format.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1_RFQ_FA520526QB047.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
24/7 Access Contral & Surveillance System
Relocation and Upgrade Potter Fitness
Center
Current as of 30 March
BLDG. 620, 622, and 1006 MISAWA AIR BASE, JAPAN
TABLE OF CONTENTS
1. Description / Purpose
2. Scope of Work
3. System Requirements
4. Installation Phasing
5. Schedule and Hours of Operation
6. Quality Control Requirements
7. Safety Requirements
8. Security and Base Access Requirements
9. Submittals and Documentation
10. Environmental Requirements
11. Applicable Standards and References
12. Contractor Personnel
13. Appendices
1. DESCRIPTION / PURPOSE
The contractor shall provide all management, labor, and equipment necessary to relocate the existing 24/7 Access Control and Surveillance System from Potter Fitness Center (BLDG 622) to BLDG 620 and the Community Commons (BLDG 1006) at Misawa Air Base Japan.
2. SCOPE OF WORK
2.1 The contractor shall relocate the following equipment with attached cables in accordance with (IAW) Appendix A – BLDG 6220 & 622 Drawing and Appendix B – BLDG 1006 Drawing:
Item Quantity Description From To 0001 1 Maglock 622 Front Entrance 620 Front Entrance 0002 1 Card Scanner 622 Front Entrance 620 Front Entrance 0003 1 Motion Sensor 622 Front Entrance 620 Front Entrance 0004 2 Hub Panels 622 Front Entrance 620 Front Entrance 0005 1 Panasonic PT-
CMZ50
622 Spin Room 620 New Aerobics Room
0006 1 Projector mount 622 Spin Room 620 New Aerobics Room 0007 4 4kg speakers 622 Spin Room 620 New Aerobics Room 0008 1 Projector screen 622 Spin Room 620 New Aerobics Room 0009 2 5kg Speakers 622 Aerobics Room 620 New Aerobics Room 0010 4 4kg Speakers 622 Aerobics Room 620 New Aerobics Room 0011 1 Projector 622 Aerobics Room 620 New Aerobics Room 0012 1 Projector mount 622 Aerobics Room 620 New Aerobics Room 0013 1 Projector screen 622 Aerobics Room 620 New Aerobics Room
0014 1 TASCAM CD
200-85 622 Aerobics Room 620 New Aerobics Room
0015 1 Amp system 622 Aerobics Room 620 New Aerobics Room 0016 1 ICG Training
System 622 Spin Room 620 New Aerobics Room
0017 20 Cameras (only 16 cameras to be installed in BLDG 1006)
622 1006
2.2 The contractor shall provide all mounting, wiring, configuration, and system integration equipment necessary for the installation of cameras in BLDG 1006
2.3 The contractor shall ensure that the cameras installed in BLDG 1006 are compatible with the existing network and electrical infrastructure
2.4 The contractor shall perform system configuration and operational setup prior to project completion.
2.5 The contractor shall install fiber optic from BLDG 622 to BLDG 620. SANWA Engineering is the only contractor capable of performing this service; thus the contractor shall order through SANWA Engineering to subcontract the fiber optic installation service.
2.6 The contractor shall not perform penetration into any surface without prior coordination and approval from Ms. Michiko Kogawa.
2.7 The contractor shall provide a new portable Audio/Visual (A/V) system for the New Aerobics Room in BLDG 620. The A/V system shall not be installed into any surface. All components of the A/V system shall be fully compatible.
2.8 The contractor shall provide a new 24/7 locking system for the front door of BLDG 1006 in accordance with Attachment 2 1006 Drawing. The locking system shall be fully integrated with the new system at BLDG 620.
3. SYSTEM REQUIREMENTS
The integrated system shall support centralized monitoring capability.
Cameras shall provide full operational coverage of designated areas without dead spots.
4. INSTALLATION PHASING
Installation shall be performed in coordinated phases to support renovation activities and maintain operational capability.
Phase 1 – Removal and relocation preparation
The contractor shall disconnect and remove existing access control equipment, surveillance cameras and audio-visual/training systems from BLDG 622 prior to 30 April 2026.
Phase 2 – Installation of Fiber Optic from BLDG 622 to BLDG 620
The contractor shall ensure that Fiber Optic cabling is laid between buildings 622 and 620 prior to 30 April 2026
Phase 3 – Relocation to BLDG 620
Phase 4 – Camera relocation and new system installation in BLDG 1006
Phase 5 – Integration, testing, and operational verification
The contractor shall complete full system integration, configuration, functional testing, and verification prior to final Government acceptance.
5. SCHEDULE AND HOURS OF OPERATION
5.1 Normal work hours are Monday through Friday, 0830 to 1630, excluding U.S. Federal holidays. Extended hours may be approved by the Contracting Officer. Work scheduling shall be coordinated with facility renovation timelines and network readiness conditions.
5.2 Recognized Holidays. The contractor is not required to provide service on the following days:
New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth 19 June Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans' Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
6. QUALITY CONTROL REQUIREMENTS
The Contractor shall perform internal quality control inspections throughout the project to verify proper installation and system functionality. Any deficiencies identified shall be corrected at no additional cost to the Government.
7. SAFETY REQUIREMENTS
The Contractor shall perform all work in accordance with applicable OSHA standards, U.S.
Air Force safety requirements, and Japanese environmental and safety regulations. The Contractor shall maintain a safe work environment and be responsible for protecting personnel, facilities, and Government property during all installation activities.
8. SECURITY AND BASE ACCESS REQUIREMENTS
8.1 Contractor personnel shall obtain required base access credentials prior to performing work on the installation. The Contractor shall comply with all base security procedures, escort requirements, and coordination instructions issued by the Government. Failure to comply with security requirements may result in work delays or removal from the installation.
8.2 Request for contractor’s employee passes
8.2.1 Prior to the start of on-site work, the Contractor shall submit applications for base passes
(listed below) to the contracting officer, for all employees, including Subcontractor employees, requiring access to Misawa Air Base in order to perform this contract.
35 SFS Form 5-1, Application for Base Pass, for employees.
8.2.2 Upon completion of this contract, the Contractor shall return all employees to the Visitor
Control Section (35 SFS/SFOP), Bldg. 301, and obtain a certification of receipt. Final Payment will be withheld until the Contractor has accomplished required clearances.
9. SUBMITTALS AND DOCUMENTATION
The Contractor shall submit the following for Government review and acceptance prior to installation activities:
• Equipment technical specifications and wiring diagrams
• As-built drawings reflecting final installation configuration
• Operation and maintenance (O&M) manuals for all installed systems
All documentation shall be provided in electronic format unless otherwise directed by the Contracting Officer.
10. ENVIRONMENTAL REQUIREMENTS
The Contractor shall comply with all applicable U.S. Air Force, Japanese environmental, and installation-specific environmental regulations. The Contractor shall ensure proper handling, storage, and disposal of any materials or waste generated during relocation and installation activities.
11. APPLICABLE STANDARDS AND REFERENCES
All work shall be performed in accordance with applicable DoD, USAF, installation communications, electrical, and safety standards. Where conflicts exist, the most stringent requirement shall apply as determined by the Government.
12. CONTRACTOR PERSONNEL
12.1 contract Manager and/or Contract Employee: the contractor shall provide a contract manager/employee who shall be responsible for the performance of the services. The names of the contract manager/employee shall be provided to the CO in writing prior to the beginning of the performance period. Additionally, the contractor must assign qualified personnel for this project. All personnel should possess the necessary certifications, relevant experience in security systems and camera installation associated with this project installation.
12.2 The contractor shall not employ persons for work on this contract if such an employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
12.3 Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English.
12.4 The contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DOD 5500-7-R Joint Ethics Regulation. The contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies in AFI 64-106.
13. Appendices
Appendix A BLDG 620 & 622 Drawing Appendix B BLDG 1006 Drawing
B A
Lock system
PC/Monitor
New Spin/ Aerobics room
Bldg 620
Bldg 622
Aerobics Room
Spin Room
Appendix A BLDG 620 & 622 Drawing
1299583992U Highlight
1299583992U Highlight
HUB BOXHUB BOXHUB BOXHUB BOXHUB BOXHUB BOXHUB BOX
HUB BOXHUB BOXHUB BOXHUB BOXHUB BOXHUB BOXHUB BOX
WV-S2130WV-S2130WV-S2130WV-S2130WV-S2130WV-S2130WV-S2130
P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200
WV-S2130WV-S2130WV-S2130WV-S2130WV-S2130WV-S2130WV-S2130
WV
-S
WV
-S
WV
-S
WV
-S
WV
-S
WV
-S
WV
-S
WV-S1130VWV-S1130VWV-S1130VWV-S1130VWV-S1130VWV-S1130VWV-S1130V
WV-S3530WV-S3530WV-S3530WV-S3530WV-S3530WV-S3530WV-S3530
P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200
HUB BOXHUB BOXHUB BOXHUB BOXHUB BOXHUB BOXHUB BOX
HDDHDDHDDHDDHDDHDDHDD
MoniterMoniterMoniterMoniterMoniterMoniterMoniter
Relocation equipmentRelocation equipmentRelocation equipmentRelocation equipmentRelocation equipmentRelocation equipmentRelocation equipment
HDDHDDHDDHDDHDDHDDHDD
MoniterMoniterMoniterMoniterMoniterMoniterMoniter
P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200P-BOX 200×200Momiji RoomMomiji RoomMomiji RoomMomiji RoomMomiji RoomMomiji RoomMomiji Room
Sakura RoomSakura RoomSakura RoomSakura RoomSakura RoomSakura RoomSakura Room
Himawari RoomHimawari RoomHimawari RoomHimawari RoomHimawari RoomHimawari RoomHimawari Room
Appendix B BLDG 1006 Drawing
| 1. DESCRIPTION / PURPOSE |
| 2. SCOPE OF WORK |
| 3. SYSTEM REQUIREMENTS |
| 4. INSTALLATION PHASING |
| 5. SCHEDULE AND HOURS OF OPERATION |
| 6. QUALITY CONTROL REQUIREMENTS |
| 7. SAFETY REQUIREMENTS |
| 8. SECURITY AND BASE ACCESS REQUIREMENTS |
| 9. SUBMITTALS AND DOCUMENTATION |
| 10. ENVIRONMENTAL REQUIREMENTS |
| 11. APPLICABLE STANDARDS AND REFERENCES |
| 12. CONTRACTOR PERSONNEL |
| 13. Appendices |
File details come from the government source that posted it. Updated .