This document outlines a federal contract opportunity for Project No. QKKA204002 to repair 29 multi-family housing units at Misawa Air Base in Japan. The solicitation is being conducted by the Department of the Air Force Pacific Air Forces. Work includes repairs to buildings 221, 712, 716, 718, 723, 812, 817, and 818. The scope of work involves repairs to exterior walls, roofs, interiors, plumbing and HVAC systems. A pre-proposal site visit was held on February 9, 2024. Proposals are due by the amended date of March 28, 2024 with a projected award date in April 2024. The period of performance is 700 calendar days.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 11 Mar 24
Target Document Section Para.
1 General N/A Is it correct to assume that this project is a construction-only project and that the contractor is not responsible for the design?
Yes.
2 N/A N/A We would like to request that Government provide the as-built drawings for reference purposes. Due to the large file size, the as-built drawings will be provided through the
DoD SAFE upon a request.
3 Specification Section 01 00 01 Specification Section 01 00 00, Para, 2.1 Laptop Computer provide specification of a laptop computer. Does this mean that we are required to deliver a laptop with the stated specs to the government?
Yes.
4 General N/A Regarding GFCI item, is there anything other items other than described in "Atch6 LIST OF
GOVERNMENT FURNISHED CONTRACTOR INSTALLED ITEMS" in the package of documents the goverment provides? Also, will the contractor be responsible for the transportation and transportation costs for these items from the designated location/storage to the project site?
Contractor is responsible for the Transportation cost of the items.
Government will provide location of items as required / requested.
5 General N/A Can we assume that parking lots, material storage/laydown areas, and space for temporary on-site offices and toilets, etc. for the project will be provided near the construction site?
Construction office and parking area will be coordinated with CE for approval. The area(s) should be close to construction area, however, not guaranteed. Fencing must be provided in accordance with Section 01 00 00 para 1.3.1.
6 General N/A It is stated that the construction period is 634 calendar days (240 days for B221), but due to the recent labor shortage and new working hour regulations that will be implemented from April
2024, it seems to be difficult to comply with the construction period. Is it possible to extend the entire construction period to 700 days (300 days for B221)?
Also, since B221 requires an advance preparation period in, is it possible to put the construction period for B221 at the last part of the overall construction period?
Yes, the construction period will be extended from 634 calendar days
(CDs) to 700 CDs. The construction period for B221 will be extended from 240 CDs to 300 CDs. The construction schedule for B221 will be dependent on when the building will be vacated by the current occupants.
7 On-site briefing materials
Sheet 13
Other construction in project area
It is mentioned that coordination with other construction will be required at the areas of B712 to
B723 in the site tour on Feb 9, 2024.
We suppose that temporary fencing, scaffolding, loading ramp steel plates, material storage areas, etc. for this construction would be conducted at the time of the completion inspection of that the other construction. Will those operations not interfere with the other construction? Should we assume the interruption of the work and the dismantling and reassembly of the scaffolds?
B712 to B723 are accessible from entrance during this project. However, any exterior work including temporary fence and scaffolding shall be done at a time after the completion of other project.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
Attachment 2 to
FA520524R00010003
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
8 General N/A After demolition of existing finishes, there is a possibility that uneven surfaces may be found on the existing concrete walls and floors that will affect the new finishes.
If the contractor has to repair them, can we assume that we will receive an additional repair fee?
Or should we include the quantity in the bid amount? If so, please indicate the quantity.
There will be no additional repair fees. The contractor is responsible for providing level surfaces in accordance with the contract documents.
Refer to A-001 GENERAL NOTES, Note 3.
All existing areas outside, abutting or adjacent to the various work areas that are damaged or disturbed during construction shall be restored by the contractor to the original condition as directed by the contracting officer at no additional cost to the U.S. government.
Contractor is responsible for Demolition and Surface Preparation.
Refer to the following specifications sections
- 09 65 00 Resilient Flooring, para 3.2, for flooring preparation and leveling.
- 09 64 29 Wood Strip and Plank Flooring, para 3.1, for preparation and flooring surface condition requirements.
- 09 3010 Ceramic Tiling, para 3.1, for preparation for different setting beds for Wall tile and floor tile requirements.
Government shall provide Addendum with revised drawings clarifying requirements for the surface preparation.
9 General N/A Are there any standards that require the installation of ceiling, floor or wall inspection ports?
Also, please specify sizes of access doors.
Refer to Sheets 3B-A-104, 3B-A-105, 3B-A-107, and A-103. Ceiling
Access Panels as indicated on 3B-A-104, 600mm x 600mm. Telecom
Ceiling Access Panels as indicated on 3B-A-104, 700mm x 800mm.
Specifications for ceiling access panel see specification section 09 51 00, para 2.3.
10 General N/A Is it correct to assume that there will be no crack repair on the exterior walls of any of the subject buildings in this project?
Refer to A-001 GENERAL NOTES, Note 1 & 2. Contractor shall repair exterior wall cracks and as indicated in Specification 09 90 00 para 3.2. and para 3.5.1.c.
The exterior wall surfaces is assumed to have no structural cracks over
1mm width. After award, the contractor shall survey and report the existing condition, then the government may recognize the existense of structural cracks.
11 Drawing 3B-G-101、102 The OCCUPANT LOAD FACTOR calculation for OCCUPANCY LEGEND does not match.
69/4=17.25 Notation: 18.6
Which is correct?
The occupancy legend is correct. 18.6 is the occupant load factor for a residential use measured in square meters (NFPA 101, Table 7.3.1.2).
69 m / 18.6 m per person = 3.7 = 4 occupants.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
12 Drawing HAZARDOUS
MATERIALS
Can we assume that the mortar used to fill around the existing sash does not contain asbestos? Refer to H-101 note 1 regarding known HAZMAT.
Refer to H-101 note 3 and specification section 02 82 00 para 1.3.1 regarding previously untested materials.
13 Drawing HAZARDOUS
MATERIALS
Can we assume that there is no asbestos content in paints and/or plaster repair materials for existing exterior walls?
Refer to H-101 note 1 regarding known HAZMAT.
Refer to H-101 note 3 and specification section 02 82 00 para 1.3.1 regarding previously untested materials.
14 Drawing HAZARDOUS
MATERIALS
If asbestos is contained in the above questions, please indicate the qualifications and work methods required to perform the work of coring and anchoring of exterior walls.
Asbestos related work shall be conducted in accordance with specification section 02 82 00.
15 Drawing 3B-H-101
3B-H-102
3B-H-103
3B-H-104
3B-H-105
3B-H-106
3B-H-107
ACM is listed on the waterproofing layer under the existing floor tiles in the master bathroom and bathroom on the second floor of JNCO. Is it correct to assume that we should include the cost of
ACM Abatement and disposal for the entire asphalt waterproofing material in the master bathroom and bathroom in this proposal.? If so, can we assume that the ACM abatement workers will perform all demolition/ACM abatement work from the demolition of the tiles to the removal of the waterproofing material?
Also, how does the waterproof layer related with positions of the existing tiles, mortar, sanitary fixtures, bathtub, piping, etc.? We need to consider the construction method for both the demolition of the existing fixtures and the ACM waterproofing layer depending on the relationship between their placement and position. We would appreciate it if you could provide the as built drawing or other drawings describing details of cross section for existing bathrooms to verify the condition.
For bidding purpose assume membrane is ACM.
Means and methods for work execution should be outlined by Contractors in the post award Work Plan and/or Asbestos Hazard Abatement Plan.
16 Drawing 3B-H-101
3B-H-102
3B-H-103
3B-H-104
3B-H-105
3B-H-106
3B-H-107
Is it correct to assume that there is no ACM under the HALF BATH floor on the first floor of the
JNCO/SNCO units?
Refer to H-101 note 1 regarding known HAZMAT.
Refer to H-101 note 3 and specification section 02 82 00 para 1.3.1 regarding previously untested materials.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
17 Drawing 3B-H-102 Drawing 3B-H-102, 2nd Floor Plan, there is no notation (4) only for unit C, 2F_BATH2.
Please advise.
(4) Should be included in unit C; Government shall provide Addendum for revised sheet.
18 Drawing 3B-H-103 Drawing ③B-H-103, 1ST FLOOR PLAN, ① (FLOORING VINYL TILE WITH GREY
MASTIC) is indicated in 1F_FAMILYRM, Unit C, but the "LOCATIONS" for ① in the ACM
List "Units "A" "B" KITCHEN AND FAMILY ROOM " but Unit C is not mentioned.
Please advise.
Government shall provide Addendum for revised sheet.
Location of ACM Item 1 will be corrected from Unit C to Unit B FAMILY
ROOM.
19 Drawing 3B-H-105 In Item ② of the ACM List on Drawing B-H-105, "LOCATIONS" in Item ② says "ALL UNITS
BEDROOMS, HALL AND STAIRS", but there is no mention of ② in the HALL of Unit A in the
2ND FLOOR PLAN. Also, in the same place in the listing it says "UNITS "B" "C" "D"
HALLWAY, DINING AND LIVING RM" but no mention of Unit C. There is also a mention of
(2) in LIVING in Unit A of the 1ST FLOOR PLAN.
Please advise.
Government shall provide Addendum for revised sheet.
Location of ACM Item 2 will be added to Unit A in 2ND FLOOR PLAN
HALLWAY and Unit B in 1ST FLOOR PLAN HALLWAY. ACM Item 2 will be deleted from Unit A 1ST FLOOR PLAN LIVING ROOM.
20 Drawing 3B-H-106 In Item ⑥ of the ACM List on Drawing B-H-105, "LOCATIONS" in Item ⑥ says "ALL UNITS
EBS, IBS, CLOSET, BATHROOMS , , , ", but there is no mention of ⑥ for CLOSET in the
HALL in the 2ND FLOOR PLAN.
Please advise.
Government shall provide Addendum for revised sheet.
Location of ACM Item 6 will be added to 2ND FLOOR PLAN CLOSET in the HALL.
21 Drawing 3B-C-106 In DWG 3B-C-106, it is described as REMOVE EXST TREE, TYP OF 5 and pointed with X marks for the locations of those trees.
Three out of the five trees to be removed are numbered to indicate the type of tree, but the remaining two trees are not numbered. What are the types of these trees?
Two trees name are Tochinoki and Mominoki.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
22 Drawing 3B-C-508
C-504
For the temporary enclosure (KARIKAKOI), a 3m high panel and sheet gate is required. May we use a 1.8m high fence barricade and a retractable aluminum gate instead?
3m hight temporary enclosure (KARIKAKOI) is required as following:
23 Drawing A-413 The drainage at the joint between the canopy and the existing roof is shown in the figure on the right. Since the canopy is
351 mm in height and fixed at the top and bottom with only a thin steel plate, it may be damaged in high winds, and the deflection of the steel plate due to high winds may cause a noise. Is it not possible to use the existing installation as shown in the photo below? Please advise.
Provide and install sheet metal flashing as indicated in the drawings and specs.
The designed transparent canopy is a standard height, therefore roof will not reach the existing roof edge.
24 Drawing PD-101 We would like to remove the piping in the room to remove the buried pipe in the SOQ, but is there enough space under the floor to perform work? Also, please provide us with the AS-built drawings.
Piping below grade is accessible in the crawl space below. Dashed lines on
PD101 indicate the crawl space compartments.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
25 Drawing S101 There is no structural diagram for restoration after the removal work at SOQ. Please provide instructions.
The removal and restoration details at SOQ are Detail drawings C3 and C5 of S-301 sheet.
26 Drawing 3B-A-311 Please provide the W dimensions of the following wall types with light-weight steel wall sheathing:
Type A2, B2, C2, A1, B1, G2
For Wall types A1, A2, B1, B2, C1, C2, the width of light gauge steel furring is dependent on width of the insulation required to meet the R-
Value.
For Wall Type G2, provide W65 Metal Studs.
27 Drawing and
Specification
3B-A-311 and
Section 09 22 00
There is a mention of MTL STUDS60, but there is no W60 available in JIS A6517.
Is it correct to read W60 as W65 in JIS A6517?
Provide W65.
28 Drawing 3B-A-605 Is it correct to assume that LVP-1 RESILIENT PLANK FLOORING for floor finish can be adopted with equivalent Japanese products?
See sheet 3B-A-605 and sheet A-601, Finish Note 2. The materials in table is for basis of design qualtiy, texture, color for estimate.
Refer to specification section 01 11 00.00 10 paragraph 1.5 for mandatory
U.S. tested products. For other products, Japanese standards not referenced in the project specifications as being acceptable alternatives to US standards, may be submitted to the Contracting Officer for consideration as acceptable alternatives after contract award using the variation request process set forth in specification section 01 33 00 SUBMITTAL
PROCEDURES. Prior to the use of such proposed additional alternative
Japanese standards, written approval by the Contracting Officer is required.
29 Drawing A-002 Please provide the information on the Japanese manufacturer and part number of the METAL
ROOF in the finish table N22?
Refer to Sheet 3B-A-605 and Sheet A-601, "COLOR/MATERIAL FINISH
INDEX" for "MTL RF" information.
Refer to specification section 01 11 00.00 10 paragraph 1.5 for mandatory
U.S. tested products. For other products, Japanese standards not referenced in the project specifications as being acceptable alternatives to US standards, may be submitted to the Contracting Officer for consideration as acceptable alternatives after contract award using the variation request process set forth in specification section 01 33 00 SUBMITTAL
PROCEDURES. Prior to the use of such proposed additional alternative
Japanese standards, written approval by the Contracting Officer is required.
30 Drawing 3B-A-311 How far apart should the members that appear to be metal fittings for fixing the insulation shown on the right in wall TYPE A1 be installed?
Verify spacing with manufacter's recommendations. As required to secure metal framing to the concrete structure.
31 Drawing 3B-A-505 Please provide the drawing that has details of 9/3B-A-505. Government shall provide Addendum showing this detail.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
32 Drawing 3B-A-311 The wall on the kitchen side of wall TYPE E1 is to be replaced after the existing wall is removed;
does this include removing the light-weight steel substrate? Also, please provide the specifications of the mortar base board to be replaced. Also, is it possible to bond tiles to the calcium silicate board?
Metal framing is required. Provide cementitious Backer Units/Cilicon
Dioxide Calcium Board over the metal framing.
33 Drawing AD-101, A-101 The porch floor is shown as a tiled renovation on the A-101 diagram, but the AD-101 diagram does not show a demolition number.
Is it correct to assume that the existing tiled floor is to be removed and a new tile floor is to be installed? Please advise.
Government shall provide Addendum.
Existing tile flooring to be remain. The note on the renovated drawing A-
101 to be removed. The floor finished on the indicated to be removed and labeled as existing.
34 Drawing A-001, A-201, 202 In the description of the exterior renovation work, there is "repainting of the exterior of the building", is it correct to assume that B221 is also included?
If so, is it correct to assume that the painting is code: PT-4?
Please advise on both inquiries.
Government shall provide Addendum for revision on Sheet A-601.
Work to include painting exterior of B221. See Color/Material Index for paint color. The B221-Finish Schedule will be revised to show paint color for Ext Field Walls.
35 Drawing A-201, 202 There is no details of the external skirting board repair work available. Is it correct to assume that it will remain as existing?
Please provide us with your instructions.
Do not paint unpainted concrete foundation.
36 Drawing A-202 On the west elevation drawing, there is a small eave at the outdoor unit storage area, but the details of the repair work are unknown.
Is it correct to assume that the existing eaves will remain? Please advise.
Existing small eaves above the heat pump to remain.
37 Drawing A-501 Please indicate the following items for the roof renovation work.
・Is it correct to assume that the steel roof sheathing (purlin, rafters, etc.) will be used for the existing roof?
・Are the roof sheathing materials for the new roof (vertical and horizontal cleats) made of wood? Also, the size of the base material is not clear. Please also indicate the size of the roof sheathing.
・Insulation material (R-30) is shown on the vertical and horizontal roof sheathing of the new roof. Please indicate the thickness.
・Is it correct to assume that the existing gable board and the roof coverings (except for the fire protection equipment storage area) are used for the new roof?
・Is it correct to assume that the existing gable board and nose cover (except for the renovated part of the fire protection facility) are used?
・Is individual certification for 30-minute fire resistance required for the roof by the manufacturer? If so, the drawings show 19mm plywood, However, the details of the manufacturer's recommendation indicate polystyrene foam boards and fire-resistant baseboards, Is it correct to assume that the substrate material should follow the manufacturer's recommendation as well?
Government shall provide Addendum to show revised detail.
- The existing steel roof sheathing, purlins, rafters and cement board substrate to remain.
- Provide vertical and horizontal wood nailers in order to provide R-30 insulation. Existing base material is 25mm cement board.
- Insulation thickness is dependent on manufactuer, provide R-30 insulation.
- The existing steel roof sheathing to remain. Remove existing asphalt roofing to existing cement board substrate.
- The existing steel roof sheathing and fascia to remain.
- Follow manufacturer's recommendation.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
38 Drawing A-501 Please indicate the following items for the canopy roof renovation.
・Is the canopy roof to be off the shelf goods? If it is a premade product, please provide the manufacturer, product name, and reference part number.
・Is the cover plate connecting the roof an existing product?
・specifications of the drainage hardware that connects the nose of the large roof to the canopy roof is not clear. Please indicate the specifications.
Government shall provide Addendum to revise notes:
The intent is to provide pre-manufacturered canopy.
- The Canopy is to be off the shelf good and is pre-manufactured.
- The cover plate is not an existing product. Provide sheet metal flashing as indicated in the drawings.
- Provide stainless steel fastners or as indicated in SECTION 07 60 00 para
2.2.10.
- On Sheet A-412, A note will be provided on the drawing indicating the
Manufacturer name and model number of the canopy and that product names and numbers of materials and finishes are intended to be used as references only for quality standard, texture and color. Products of other manufacturers are acceptable if the product conforms to specified requirements.
39 Drawing AD-101.A-101 Is it correct to consider that the following rooms are outside the scope of the renovation work?
Please give me instructions.
□GAREGE
□GAREGE CLOSET
□GARBAGE
□EXTERIOR STORAGE
□MACHANICAL ROOM
These room are within scope. Refer to other discipline drawings.
40 Drawing A-101.A-601 The floor finish of Closet 1 and Closet 2 is a carpet hatch in the floor plan, but it is different from flooring in the finish table. The floors in the bedroom and closet have the same finish, so is it safe to assume that they are exactly as shown in the floor plan? Please advise.
Government shall provide Addendum to revise flooring finish.
The flooring at Closet 1 and Closet 2 to be Carpet. See Addendum for corrected Finish Schedule.
41 Drawing A-311 Please indicate the following items to confirm the contents of wall renovation.
・In the wall renovation shown in Figure A-311, is it correct to assume that wall surfaces without a sign are to be painted (PT-1) finish after base preparation?
・Is it correct to assume that the tiles on the walls of the bathroom and ante room are to be removed and newly installed (including mortar adjustment)?
- All gypsum and concrete walls to be painted after base preparation.
- All walls in bathrooms and ante room to receive new tile finish.
42 Drawing A-311 From the above question, the wall tiles in the bathroom and ante room are shown in dashed lines in the cross section if the removal and new installation is correct. If that is a waterproof layer shown, please indicate the specification of the waterproof layer.
Dashed line to indicate waterproof layer. Refer to SPECIFICATION 09 30
10 para 2.7.
43 Drawing A-103 The sizes of the ceiling in Specificationtion openings shown in the ceiling floor plans are different.
Is it correct to assume that the small size is 450 square and the large size is 600 square? Please advise.
Government shall provide Addendum with revised panel sizes and specification.
Provide 600mmx600mm ceiling access panels and 450mm x450mm ceiling access panels.
44 Drawing A-103 Wooden cut-off edges are shown in the figure for the outside and inside corners of the folded ceiling, but the details are not clear.
If it is a premade product, please provide the reference manufacturer's part number. In case it is a custom-made product, please provide the size and finish.
Refer to Sheet A-502 Details 1,2,3 for 30x30 Moulding and 75x75
Moulding.
45 Drawing A-301 The ceiling insulation is shown in the figure. Is it correct to assume that glass wool (R-19) thickness is 100? Please advise.
Provide R-19 (IP) insulation, thickness is dependent by the manufactuer.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
46 Drawing A-407 In Closet 2 of the master bedroom in Figure A-407, there are expressions such as a pillow shelf, storage shelf, and hanger pipe, but this is not a closet other than Closet 2. Is it correct to assume that the other closets than Closet 2 have similar pillow shelf/storage shelf and hanger pipe? The details of the modification are unknown. Is it okay to leave it as is? Please provide
Specificationific details.
The existing shelf storage and hanger pipe are to be NEW at B221 Closet 2 and B221 Closet 4. Government shall provide Addendum with revised drawing.
For TYPE 3B bedroom 2 and 3 closets, existing closets are to be demolished, and new closets, new closet doors, new hangar rods, and new upper storage are to be provided. The upper shelf is drawn incorrectly and will be revised in the Addendum. Government shall provide Addendum with revised drawing.
47 Drawing AD-101, A-101 The pantry and closet 8 are shown in Figure A-101, but not in Figure AD-101. Considering the scope of the renovation, is it okay to match it with the details of the closet renovation? Please advise.
Existing Pantry and Closet 8 to remain.
48 Drawing A-505 In drawing A-505, the detail of the closet shelf is shown in the symbol A-505/4. If the question above is positive about existing use, is it possible to adopt the details of the shelves shown in the diagram? If the installation is required, please provide the closet number.
Government shall provide Addendum.
Detail Section Bubble indicator will be added to Sheet A-101 at closets where Detail 4/A-505 is applicable.
49 Drawing A-505 Please tell us the details of where A-505/5 wall cabinet and A-505/6 base cabinet will be used. Details show typical construction of Wall and Base Cabinet to be provided at the Kitchen.
50 Drawing A-405~409, 503 Please clarify the following items in the blind.
□Figures A-405 to 409: The installation of the blind is illustrated in the development elevation, but it is not shown in detail like the details of numbers A-503/5 and A-503/6 in figure A-503. Is it okay to assume that the contents shown in the development elevation are correct?
□Is it correct to think of blinds as virtual blinds? If so, please also indicate the reference manufacturer's part number.
Contractor to provide Vertical Blinds.
51 Drawing 3B-A-311
3B-A-313
Is it correct to assume that the insulation material under the concrete exterior walls and roof is equivalent to Asahi Kasei Neomaform?
Provide insulation that meets plans and specifications.
52 Drawing 3B-A-406
3B-A-407
Is the medicine box with 3 mirror panels in bathroom shall be installed on the wall surface or embedded in the wall?
Medicine Cabinet with 3 Mirror Panel to be wall mounted.
53 Drawing 3B-A-406
3B-A-408
Does the wall-mounted soap dish need to be ceramic? Recessed Soap Niche at shower to be Ceramic. Soap holder at lavatory to be stainless steel.
54 Drawing 3B-A-601
3B-A-604
Please specify the required anchor pitch for all metal doors and windows (ei. steel door, aluminum doors and windows).
Provide pitch as recommended by the manufacturer.
See spec sec 08 11 13 steel door, para 2.6.2.1 that says "at least 3 for each jamb", and over 2285mm, then add one.
See spec sec 08 11 16 alum door, para 3.1 says per maker's instruction.
55 Drawing 3B-A-311
3B-A-312
Can we assume that the partition material between the ceiling and walls is made of PVC? PVC trim to be provided between wall and ceiling joint as indicated.
56 Drawing 3B-AD-101
3B-AD-
For the partition wall of the current dwelling unit, is it correct to assume that the LGS studs in the partition wall will be replaced with new studs since it would be difficult to reuse the existing LGS studs after the existing gypsum board is demolished at the LGS stud base.
Remove existing LGS and provide new LGS studs in the new partitions as indicated.
57 General N/A Are there any standards that require the installation of ceiling, floor or wall inspection ports?
Also, please specify sizes of access doors.
See Query No. 9 above.
58 Drawing 3B-A-601
3B-A-604
Is it correct to assume that all interior doors, door frames, and window frames are to be newly installed?
Correct. All interior doors, door frames and exterior windows to be new.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
59 Drawing 3B-A-505 Drawing 3B-A-505, 9 PIPE PENETRATION DETAIL does not show piping details. Would you provide the details.
See Query No. 31 above.
60 Specification Section 06 20 01 Regarding the material of interior doors, is it correct to assume that the core of doors is a "lumber core" that made of solid wood boards laid closely together in the vertical direction?
Interior door material to be Stave Lumber or Solid core.
61 Specification Section 06 20 00 Para. 3.1.4 Do the door and window frames (wooden) joints have to be "miter joint" as shown in the figure below?
Correct. The door and window frames (wooden) are to be miter joint.
62 Specification Section 06 20 00 Page 4
Para. 2.1.3
There is a section in the list of wood finishes where the text is cut off.
Please provide complete information.
Government shall provide Addendum.
Cut off text will be shown in Addendum.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
63 Drawing 3B-A-605
A-601
3B COLOR/MATERIAL FINISH INDEX, in DWG 3B-A-605 indicates that the finishing material for WD-1 is described as HARDWOOD (PAINT/VARNISH), but is it acceptable to use laminated wood? Also, is it acceptable to use VARNISH finish instead of PAINT?
COLOR/MATERIAL FINISH INDEX in DWG A-601, also indicates that the finishing material for WD-2 is described as HARDWOOD, but is it acceptable to use laminated wood with a
VARNISH finish?
Government shall provide Addendum for corrected finish schedule.
WD-1 to be Hardwood with Varnish finish.
64 Specification 06 20 00 Regarding the material of furniture (and/or cabinets), would you accept to use particle board for this project?
Particle Board is not allowed.
65 Drawing 3B-A-602 ⑤⑦ Regarding the core material of wooden fittings, sliding and swinging doors, is it correct to assume that the material is HONEYCOMB CORE as shown in the figure (7) below?
Provide door as indicated on Schedule. Government shall provide
Addendum.
"SDCW" to be changed to "SCWD" (Solid Core Wood Door).
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
66 Drawing 3B-A-602 ② With regard to the sweep-out window, is it correct that the "WOOD TRIM", "THRESHOLD", "FLUSH WITH INTERIOR", and "FLOOR FINISH" on the lower drawing are not required and that the floor finish material extends to the bottom frame of the window?
Provide wood trim as indicated in the drawings.
67 Drawing 3B-A-602 ④ Regarding the entrance door, it is described "max 12mm" on 3B-A-602, ④, as shown in the figure below. Is it correct to think that the floor on the exterior side should be raised from the current level? (Currently, the floor is considerably lower than the door's sliding door.)
Correct. The existing exterior floor to be demolished and a new landing to be poured to 12mm max from interior floor finish.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
68 Drawing 3B-A-601 The manufacturer and product name are listed in REMARKS in the DOOR SCHEDULE. Does this mean that the specific item has to be used?
No. Product names and numbers of materials and finishes are intended to be used as references only for quality standard, texture and color. Products of other manufacturers are acceptable if the product conforms to specified requirements.
69 Drawing 3B-A-605 The tile CT-1 LIXIL MISTY PALETTE is being discontinued in 2023.
Please advise.
Product names and numbers of materials and finishes are intended to be used as references only for quality standard, texture and color. Products of other manufacturers are acceptable if the product conforms to specified requirements. See finish note 2. The materials in table is for qualtiy, texture, color for estimate.
Contractor will find the closest color/texture material to submit, and the one of idea is to use Jikina/Lixil, JIN-100NET/01/02.
70 Drawing 3B-A-605
3B-A-404
Type 3 Color/Material Finish Insdex on DWG 3B-A-605 says the tile CT-3 is using for Living
Room, but the location of the use of tile CT-3 is not indicated on DWG 3B-A-404.
Can we assume that tile CT-3 is not applicable?
CT-3 to be wall mounted in living room. Government shall provide
Addendum.
71 Drawing 3B-AD-101
3B-AD-102
After inspecting the site on 2/9, we found that the existing floor finish in each building was different from house to house and room to room.
Please provide the information about the current floor finish material for each building or unit?
Government shall provide Addendum indicating different floor finishes.
DEMOLITION KEYNOTE 17 to be revised .
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
72 Drawing 3B-AD-101, 001
3B-AD-301
The description of the new CONC_LANDING on D line, exterior, in drawings 3B-A-001, 101, and 3B-A-301 is not clear and ambiguous.
i.e.:
Drawing 3B-A-001 and 101 are shown in the existing shape of the landing.
Drawing 3B-A-301 states "CONCRETE LANDING EXTENSION".
Drawing 3B-S-101 includes <4> NEW CONCRETE STEP.
The description differs depending on the drawing, so please provide clear information.
Refer to Sheet 3B-A-106 and 3B-A-201. Keynote N04.
73 Drawing A-201 There is no description of the location or details of the building number on the wall for B221. Is it correct to assume that the building number on the wall is not necessary? If the building number is required, please indicate the location and details.
Building number to be coordinated with Contracting Officer.
Contractor shall record its building number, location, size before repaint, and restore as the original condition.
74 Drawing 3B-SD-101 Is it correct to read the demolition of the porch dirt floor as including the structural frame?
・There is no mention of demolition in C5 and B2 of 3B-SD-201. There is a notation of remaining.
・RESTORE is indicated in 3B-S-101.
・It is not included in the scope of demolition in 3B-AD-101.
The concrete slab of the porch in front of the family room will be remained.
The shape of the porch will match Architectural drawing.
75 Drawing 3B-SD-201
3B-SD-101
DWG 3B-SD-201, in B2 WALL ELEVATION - DEMOLITION, the indication number "1"
(SHEET KEY NOTE 1. DEMOLISH EXISTING CONCRETE WALL) is indicated as "4"
(SHEET KEY NOTE 4. DEMOLISH EXISTING CONCRETE WALL FOR OPENING) in 3B-
SD-101. Is it correct to understand that the content is the same in both cases?
Yes. The content is same in both cases.
76 Drawing 3B-S-101 In the drawing, the indication number pointing to the concrete slab of the porch is described as
"3" (SHEET KEY NOTES 4. DEMOLISH EXISTING CONCRETE WALL FOR DOOR
OPENING), but we assume that it should be "2" (SHEET KEY NOTES 2. DEMOLISH
EXISTING CONCRETE SLAB). Please clarify.
The correct keynote for the concrete slab of the porch should be 2.
Government shall provide Addendum.
77 Drawing 3B-S-103 The location of the A5 and A3 cross sections are not shown on drawing 3B-S-102. Please provide the information.
The relevant location will be provided on 3B-S-102.
78 Specification &
Drawing Plumbing
Section 01 00 00 Page
5 & PH-MP101
GENERAL NOTES:2
1.1 Please provide the list of buildings that would be affected when the hot water supply system in
Pump House 822 is cut off.
Pump House 822 is serving Buildings 712, 716, 718, 723, 724, 804, 806, 808, 810, 812, 817, and 818.
79 Drawing 3B-P-101 Is it not necessary to install a BACKFLOW PREVENTER in the water supply piping? Backflow preventers shall only be required prior to the domestic hot water heating system. Government shall provide Addendum showing backflow preventers on drawings.
80 Drawing 3B-P-101 GENERAL NOTES:3 Even though it is stated "all", do we need to install jacket on the drainage piping? Insulation and Jacketing shall be required for all piping in crawl space including drainage piping.
81 Specification Section 23 05 93 Can a First-class plumbing construction management engineer perform TAB and
COMMISSIONING work?
A first-class plumbing construction management engineer is acceptable to perform TAB and COMISSIONING work.
82 Drawing 3B-M-101 Is a BDD required if the range hood is missing a CD? BDD (Backdraft Dampers) are required on all exhaust ducts.
83 Drawing EM003, PH-EM503 In DIAGRAM there is one WM but in LIST there are two listed.
Please clarify the quantity.
There should be Qty. 1 water meter to be installed and connected to the
DDC for pump house B822.
84 Drawing EM003, PH-EM503 Are we correct in understanding that FM1 and 2 are monitoring the amount of circulation, not the amount of hot water used?
FM1 and FM2 are monitoring the amount of hot water used downstream of the mixing valve.
85 Drawing EM003 Even tough the water is always full at DHWT tank, is it still necessary to install the level gauge
(FL1, 2)?
Install FL 1 and FL 2 level sensors as noted on drawings.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
86 Drawing EM003 Where is the power supply for the anti-freeze heaters (HT1-3) supplied from? Heat trace for HWU to be powered separately from mechanical equipment.
Government shall provide addendum indicating heat trace on mechanical and electrical drawings.
87 Drawing 3B-EM101~107
EM002
There are four hot water temperature sensors, but the system diagram shows only one.
It is correct to understand that there are four?
There should be Qty. 1 hot water temperature sensor at the hot water line serving each unit (4 units per building). Location of hot water temperature sensors are shown on the plumbing plans. Government shall provide addendum indicating 4 hot water temperature sensors per building on
EMCS diagrams.
88 Drawing 3B-EM503~504 There is no piping for the temperature sensor, but is it correct to assume that it will be housed in the piping for the water volume meter?
Temperature sensor and water meter wiring may share the same conduit.
89 N/A N/A N/A Are there any construction zones? If so, please indicate the number of buildings and duration of construction for each construction section. Also, is there any construction schedule we need to follow?
The 800 area including buildings 812, 817 and 818 could be considered one construction zone. The 700 area including buildings 712, 716, 718 and
723 could be considered another construction zone. There is no set duration for each construction zone, except for the total construction duration indicated in the specifications. The construction schedule for building 221 will be dependent on when the building will be vacated by the current occupants.
90 Drawing F-001 FIRE SPRINKLER
NOTES 4
The drawings say that Buildings 712, 716, 718, 723, 812, 817, and 818 should follow NFPA13R standards, but considering the size of the building, NFPA13D would be applicable. Please verify the standard requirements.
NFPA 13R must be used. The buildings are categorized as Garden Style
Apartments according to the US Air Force Family Housing Guide for
Planning, Programming, Design and Construction, section 4-18.2. This document takes precedence over NFPA and requires a design in accordance with NFPA 13 or NFPA 13R for the Garden Style Apartment type of housing.
91 Drawing 3B-FX101 & FX102, FX103
May we assume that the interior of each residential closet consists of non-combustible materials and that no sprinkler heads are required to be installed?
NFPA 13R section 6.6.3 does not require sprinklers in linen closets or pantries less than 2.2 square meters in area. The closets are 0.85 square meters.
92 Drawing 3B-FX101 & FX102, FX103
Heat retention is required for all fire suppression system piping; is heat tracing required? Heat tracing will not be required as the above ceiling spaces will be conditioned to avoid freezing. Insulation must be provided on piping.
93 Drawing 3B-FX101 There is no mention of backflow, but is it correct to install it on the primary side of each alarm valve? Also, is a pressure reducing type Specificationified?
The riser details 1/3B-F-501 and 1/F-501 indicate a double check valve assembly, this is the backflow preventer. A pressure reducing valve is not necessary.
94 Drawing 3B-FX101 The Mechanical room on the 1st floor where the alarm valves are located needs to be kept at a temperature of 4°C or higher. Is it correct to assume that a panel heater will be installed?
An electric wall heater will be provided for the fire riser enclosures. See mechanical schedule on Sheet 3B-M-601, unit UH-1 for reference.
95 Drawing 3B-P-603 There is no list of JIS acceptable substitutes in Specification. Is it possible to use Japanese products for all equipment listed in the PLUMBING EQUIPMENT SCHEDULE on drawing 3B-
P-603?
JIS compliant products are acceptable, however items included in CFUSM list shall be U.S. materials.
96 Drawing 3B-M-601
M-601
There is no list of JIS acceptable substitutes in Specification. Is it possible to use Japanese products for all equipment listed in the fan coil unit, heat pump, fan, and electric heater
SCHEDULEs on drawing 3B-M-601?
JIS compliant products are acceptable.
97 Drawing PH-M-601 There is no list of JIS acceptable substitutes in Specification. Is it possible to use Japanese products for all the equipment listed in the reSpecificationtive SCHEDULE for hot water heat pumps, circulation pumps, and water meters in drawing PH-M-601?
JIS compliant products are acceptable.
98 Specification Section 21 13 13 Specification does not have a list of JIS acceptable substitutes. Is it possible to use Japanese-made steel pipe and fitting materials for sprinkler piping?
Yes, Japanese piping and fittings are acceptable.
99 Specification Section 22 00 00 Specification does not have a list of JIS acceptable substitutes. Is it possible to use Japanese materials for water supply pipes, hot water pipes, drainage pipes, and fittings?
JIS compliant products are acceptable.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
100 Specification Section 22 00 00 Specification does not have a list of JIS acceptable substitutes. Is it possible to use Japanese product valves?
JIS compliant products are acceptable.
101 Specification Section 23 23 00 Specification does not have a list of JIS acceptable substitutes. Is it possible to use Japanese-made refrigerant pipes and fittings?
JIS compliant products are acceptable.
102 Specification Section 23 23 00 Specification does not have a list of JIS acceptable substitutes. Is it possible to use ducts made in
Japan for ventilation?
JIS compliant products are acceptable.
103 Specification Section 23 07 00 Specification does not have a list of JIS acceptable substitutes. Is it possible to use Japanese-made insulation material for piping?
JIS compliant products are acceptable.
104 Specification Section 26 20 00
Interior Distribution
System
Para 2.5.4
Bonding Conductors
Section 26 20 00 para 2.5.4 mentions the use of bonding conductors conforming to JIS 3101, JIS
C 3105 and JCS 1226, Class B.
But standard of copper wire is annealed copper conductor conforming to JIS C 3102. Therefore, we will submit with supplemental documents for material submittal, so please consider them.
(For reference)
JIS C 3101 is standard for hard drawn copper conductor.
JIS C 3105 is standard for stranded of hard drawn copper conductor.
JIS H 3260 is standard for stranded of annealed copper conductor.
JIS C 3102 is acceptable. Government shall provide Addendum with revised specfications.
105 Specification Section 26 20 00
Interior Distribution
System
Para 2.9.2
Weatherproof
Receptacle
Spec 26 20 00 para 2.9.2 Weatherproof Receptacles describes UL listed for use “wet location” with integral GFCI protection, and to include cast metal box with gasketed, hinged, lockable and weatherproof while-in-use, polycarbonate, die-cast, metal/aluminum cover plate.
However, lockable products are not general-purpose products.
Please consider non-lockable products.
Please check with the catalogs of major manufactures for UL products or JIS products.
Non-lockable covers are acceptable. Government shall provide Addendum with revised specfications.
106 Specification Section 26 20 00
Interior Distribution
System
Para 2.9
Receptacles
Section 26 20 00 para 2.9 indicates receptacles to meet JIS C 8303, JIS C 8281-1, or UL 498 hard use (also designated heavy-duty), grounding-type. However, there are no products of receptacles with designated heavy-duty in Japan. Please revise the specification, or to delete
“designated heavy-duty type”
The wording will be changed to "extra-duty", and this is applicable to all receptacles in wet conditions. Government shall provide Addendum revising the specfications.
107 Specification Section 26 20 00
Interior Distribution
System
Para 2.4
Cabinets, Junction
Boxes, and
Pull Boxes.
Section 26 20 00 para 2.4 requires cabinets, junction boxes, and pull boxes to comply with JIS C
8340 and hot-dip, zinc-coated.
Regarding pull boxes, could the Government consider accepting rust-proof coated steel sheet?
This is a common standard in Japan.
Rust-proof coated steel sheet is acceptable. Government shall provide
Addendum with revised specfications.
108 Specification Section 26 20 00
Interior Distribution
System
Para 2.10.3
Circuit Breakers
Specification 26 20 00 para 2.10.3 states that circuit breaker shall comply with JIS C 8201-2-1 or
UL 489, and thermal magnetic type having a minimum short-circuit current rating equal to the short-circuit current rating of the panelboards in which the circuit breaker will be mounted.
Regarding 1P 20A circuit breaker per JIS standard, the maximum short-circuit current rating is
5KA. Consequently, it does not meet full rated system in panel schedule as described on each drawing of Electrical Panel Schedules.
This is inconsistent with the specification and drawings.
In this case, should we use the UL and NEMA standards so that US products can also be considered?
For JIS standard panels no 1P20A breakers are called for. Only 2P20A breakers, see panel shcedules on sheets 3B-E-701. Government shall provide Addendum for revised sheet PH-E-701 to show 2P20A breakers instead of 1P20A breakers. One-line on sheet PH-E-601 correctly shows
2P20a breakers for these loads.
109 Specification Section 26 20 00
Interior Distribution
System
Para 2.7
Device Pates
Switch cover and outlet cover are only required “zinc-coated sheet steel” or “cast metal”.
Can we consider using manufacturer standard “nylon” or “lexan” covers for general indoor switch and outlet? Please confirm.
Provide nylon or lexan cover plates for all indoor switch and outlets.
Government shall provide Addendum with revised specfications.
RFP No. FA520524R0001, Repair JNCO 29 units, Misawa Air Base, Japan
Consolidated List of Prospective Offerors' Submitted Questionnaire and U.S. Government Response/Clarification
Gov't Response/Clarification ReferenceQuery
No.
Question Submitted by Prospective Offerors
110 Specification Section 26 20 00
Interior Distribution
System
Para 2.12
Transformers
Specification for transformer is JES 2200 and JIS C61558-1, and requirements for transformer insulation system is: 220 degrees C for transformers 15KVA and greater, with temperature rise not exceeding 150 degrees C under full-rated load in maximum ambient of 40 degrees C.
However, the maximum temperature rises for high-grade transformer that apply to JES 2200 is
180 degrees C.
Therefore, for approval of Japanese product please consider revising the requirements.
For this project, there are only transformers below 15KVA.
111 Specification Section 26 20 00
Interior Distribution
System
Para 2.14
Lockout Requirements
Regarding Spec 26 20 00 para 2.14 LOCKOUT REQUIREMENTS, please advise what equipment is to be installed and its specification.
If this is not applicable, please delete this paragraph.
Provide disconnect switches according to this specification section.
112 Specification Section 26 20 00
Interior Distribution
System
Para 3.1.4.4
Underground Conduit
Spec 26 20 00 para 3.1.4.4 Underground Conduit mentions plastic-coated rigid steel; plastic-coated steel IMC; PVC, Type EPC-40, Type VE, HIVE, VP, and HIVP. In addition, it mentions steel conduit before rising through floor slab, and to provide plastic coating to extend minimum
150 mm above floor.
Therefore, we propose the use of anti-corrosion tape with double winding instead of the plastic-coated steel. This construction method is a normal standard of MLIT (Ministry of Land, Infrastructure and Transport) in Japan. Please consider the above.
Provide plastic-coated rigid steal for all underground transitions above grade.
113 Specification Section 26 51 00
Interior Lighting
Para 2.2.1
LED Luminaires
Specification section 26 51 00 para 2.2.1 states that luminaires must have a minimum 5-year manufacturer’s…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .