FA500420B0007 RFIs (04-23-2020).xlsx

XLSX spreadsheet 10 KB Posted

Attached to
FTQW 19-1002, Maintain Turbine Generator #4 Federal contract opportunity
Solicitation number
FA500420B0007
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document contains a federal solicitation seeking maintenance services for a turbine-generator at Eielson Air Force Base. The solicitation requests potential contractors to perform work including tear down, inspection, cleaning and repair of turbine-generator number four and auxiliary equipment at the base's Central Heat and Power Plant. Services include replacement of the electronic governor and machine monitoring system, as well as preparation of technical notes and tear-down/repair reports. The solicitation is contemplated as a firm fixed price sealed bid contract between $1-5 million. The response due date is May 7, 2020, with any questions due by April 20. Interested parties must be registered in the System for Award Management and contact points are provided. The document also contains questions and answers relating to the work space and equipment available on site.

View the file

Other files for this federal contract opportunity

Other files attached to FTQW 19-1002, Maintain Turbine Generator #4, newest first.
File Type Posted
FA500420B00070002 SF 30.pdf PDF
FA500420B00070001 SF 30.pdf PDF
Attachment 1 - Turbine Generator 4 Specifications.pdf PDF
Attachment 4 - Wage Determination AK20200001.pdf PDF
Solicitation - FA500420B0007.pdf PDF
Attachment 3 - Turbine Generator 4 Submittal Register.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QuestionAnswer
I see reference to the floor loading and the bracing under it (saw the bracing last time I was there as well). There were cabinets stored there last time and I thought there was talk of installing something in that area.. My questions is - the spec states the areas are free and clear and ready for use, is this correct?The reinforced areas of the floor will be clear and available for turbine contractor use. There are new electrical cabinets installed adjacent to the reinforced floor area closest to turbine #4, but there should still be sufficient room to work.
I see a balance is required and a low speed that extrapolates to 3600RPM is acceptable and we understand this process and can complete this on or off site, onsite would be easier.. My question is - where is there room and stable ground for a balance lathe/machine to sit "onsite"? I remember this in the last RFQ so it must have been accomplished before onsite?Previous turbine contractors have brought balancing equiipment on site for use. The plant made space in their adjacent parts warehouse avaialble for set-up of the equipment.
Grit Blasting - that is done onsite, My question is - if I remember correctly there is a hooch/area for use?There is an area adjacent to the plant for the contractor to erect his blasting shed. The Government is not providing a shed, however.
Outside Movement - My questions is- will there be a fork truck or small crane to move parts in the blast area and the rotor out of the building - or do we include that in our pricing? (saw a carry deck of sorts in the pictures).The Government is NOT providing any forklift or other material handling equipment, with the exception of the bridge crane inside the turbine room. The contractor WILL be allowed to use the bridge crane. Bidders should plan and price their bids accordingly.