JA-4__Submittal_Register.pdf

PDF 537 KB Posted

Attached to
F-35 (NDI) Renovate Engine MX (B1346) Federal contract opportunity
Solicitation number
FA500419BA009
Issued by
Department of the Air Force Pacific Air Forces

About this file

Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to F-35 (NDI) Renovate Engine MX (B1346), newest first.
File Type Posted
NDI_Bidder_Inquiries_Clarifications.pdf PDF
Solicitation_-_FA500419BA009.pdf PDF
JA-1_Synopsis_of_Work.pdf PDF
JA-3_Drawings.pdf PDF
JA-5_Wage_Determination.pdf PDF
JA-2_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final Construction Documents Engine Maintenance Facility, Bldg 1346 Eielson Air Force Base

FTQW 18-0203

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Trans-mittal #

Specification

Section Submittal Description Item Submitted

Paragraph

Classificati on: GOVT or A/E

Revwr Submit

Approval

Needed

By

Material

Needed

By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date

FWD To

Other

Revwr

Date RCD

From

Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority Remarks

1 01 30 00 Preconstruction Submittals View Location Map 1.3 G

2 01 30 00 Preconstruction Submittals Progress and Completion Pictures 1.4 G

3 01 30 00 Samples Color Boards 1.2 G

4 01 32 01.00 10 Preconstruction Submittals Project Schedule G

5 01 32 16.00 20 Preconstruction Submittals Construction Schedule G

6 01 35 26 Preconstruction Submittals Accident Prevention Plan (APP) 1.6 G

7 01 35 26 Test Reports Notifications and Reports 1.11 G

8 01 35 26 Test Reports Accident Reports 1.11.2 G

9 01 35 26 Test Reports LHE Inspection Reports 1.11.3 G

10 01 35 26 Certificates Crane Operators/Riggers 1.5.1.4 G

11 01 35 26 Certificates Standard Lift Plan 1.6.2.2 G

12 01 35 26 Certificates Critical Lift Plan 1.6.2.3 G

13 01 35 26 Certificates Activity Hazard Analysis (AHA) 1.7 G

14 01 35 26 Certificates Confined Space Entry Permit 1.8.1 G

15 01 35 26 Certificates Hot Work Permit 1.8.1 G

16 01 35 26 Certificates Certificate of Compliance 1.11.4 G

17 01 35 26 Certificates License Certificates 1.13 G

18 01 45 00.00 10 Preconstruction Submittals Contractor Quality Control (CQC) Plan 3.2 G

19 01 45 00.00 10 Test Reports Verification Statement 3.5.2 G

20 01 45 35 Preconstruction Submittals SIOR Letter of Acceptance G

21 01 45 35 Preconstruction Submittals Written Practices 3.1.2 G

22 01 45 35 Preconstruction Submittals Ndt Procedures And Equipment

Calibration Records

3.1.2 G

23 01 45 35 Preconstruction Submittals Project Manual G

24 01 45 35 Test Reports Daily Reports 3.1.2 G

25 01 45 35 Test Reports Biweekly Reports 3.1.1 G

26 01 45 35 Certificates Fabrication Plant 2.1 G

27 01 45 35 Certificates Steel Truss Plant G

28 01 45 35 Certificates Wood Truss Plant G

29 01 45 35 Certificates Ac472 Accreditation G

30 01 45 35 Certificates Steel Joist Institute Membership G

31 01 45 35 Certificates Certified Plant G

32 01 45 35 Certificates Certificate Of Compliance 2.1 G

33 01 45 35 Certificates Qualification Records 3.1.2 G

APPROVING AUTHORITY

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE:

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

April 2018

Eielson Air Force Base

FTQW 18-0203

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

APPROVING AUTHORITY

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE:

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

34 01 45 35 Certificates Special Inspector of Record G

35 01 45 35 Certificates Special Inspector 1.5 G

36 01 45 35 Closeout Submittals Interim Final Report 3.1.2 G

37 01 45 35 Closeout Submittals Comprehensive Final Report 3.1.2 G

38 01 50 00 Preconstruction Submittals Construction Site Plan 1.3 G

39 01 50 00 Preconstruction Submittals Traffic Control Plan 3.4.1 G

40 01 50 00 Test Reports Backflow Preventer Tests G

41 01 50 00 Certificates Backflow Tester 1.4.1 G

42 01 50 00 Certificates Backflow Preventers 1.4 G

43 01 57 19 Preconstruction Submittals Preconstruction Survey 1.6.1 G

44 01 57 19 Preconstruction Submittals Regulatory Notifications 1.6.2 G

45 01 57 19 Preconstruction Submittals Environmental Protection Plan (EPP) G

46 01 57 19 Preconstruction Submittals Stormwater Notice of Intent and copy of

ADEC approval G

47 01 57 19 Preconstruction Submittals Dirt and Dust Control Plan 1.7.11.1 G

48 01 57 19 Preconstruction Submittals Employee Training Records 1.6.5 G

49 01 57 19 Preconstruction Submittals Environmental Manager Qualifications 1.6.4 G

50 01 57 19 Preconstruction Submittals Completed Checklist For Spruce Lake

Disposal, if applicable G

51 01 57 19 Preconstruction Submittals Notice of Intent For Asbestos

Abatement, if applicable G

52 01 57 19 Preconstruction Submittals Notice Of Building Demolition, if applicable G

53 01 57 19 Preconstruction Submittals Contaminated Soil Sampling And

Analysis Plan (SAP) G

54 01 57 19 Preconstruction Submittals Contaminated Soil Sampling And

Analysis Field Report G

55 01 57 19 Preconstruction Submittals Initial Contractor Hazardous Material

Inventory G

56 01 57 19 Test Reports Laboratory Analysis 3.7.1.1.2 G

57 01 57 19 Test Reports Inspection Reports G

58 01 57 19 Test Reports Solid Waste Management Report 3.7.2.1 G

59 01 57 19 Certificates Employee Training Records 1.6.5 G

60 01 57 19 Certificates Erosion and Sediment Control

Inspector

1.6.5 G

61 01 57 19 Certificates

ADEC Transport, Treatment, &

Disposal Approval Form For

Contaminated Media (ATT), if applicable

G

62 01 57 19 Closeout Submittals Waste Determination Documentation 3.7.1 G

63 01 57 19 Closeout Submittals

Disposal Documentation for Hazardous and Regulated Waste, monthly (weight tickets, invoices, receipts, manifests)

G

64 01 57 19 Closeout Submittals Assembled Employee Training Records 1.6.5 G

65 01 57 19 Closeout Submittals Solid Waste Management Permit G

66 01 57 19 Closeout Submittals Solid Waste Management Report, monthly G

Eielson Air Force Base

FTQW 18-0203

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

APPROVING AUTHORITY

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE:

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

67 01 57 19 Closeout Submittals Hazardous Waste/Debris Management 3.7.3.1 G

68 01 57 19 Closeout Submittals Regulatory Notifications 1.6.2 G

69 01 57 19 Closeout Submittals Sales Documentation 3.7.2.1 G

70 01 57 19 Closeout Submittals Contractor Certification G

71 01 57 19 Closeout Submittals

ADEC Approved Disposal Facility

Weight And/Or Acceptance Ticket For

Contaminated Soil

G

72 01 57 19 Closeout Submittals

ADEC Approved Disposal Facility

Certificate Of Thermal Incineration Or

Disposal Of Contaminated Soil Along

With Confirmatory Sample Results

G

73 01 58 00 Shop Drawings Preliminary Drawing Indicating Layout

And Text Content

1.3.1 G

74 01 74 19 Preconstruction Submittals Waste Management Plan 1.6 G

75 01 74 19 Closeout Submittals Records 1.7 G

76 01 78 00 Product Data Warranty Management Plan 1.6.1 G

77 01 78 00 Product Data Warranty Tags 1.6.3 G

78 01 78 00 Product Data Spare Parts Data 1.4 G

79 01 78 00 Manufacturer’s Instructions Instructions 1.6.1 G

80 01 78 00 Operation and Maintenance Data Operation and Maintenance Manuals 3.6 G

81 01 78 00 Closeout Submittals As-Built Drawings 3.1 G

82 01 78 00 Closeout Submittals Record Drawings 3.2 G

83 01 78 00 Closeout Submittals As-Built Record Of Equipment And

Materials

3.5 G

84 01 78 00 Closeout Submittals Final Approved Shop Drawings 3.3 G

85 01 78 00 Closeout Submittals Construction Contract Specifications 3.4 G

86 01 78 00 Closeout Submittals Interim DD Form 1354 3.8 G

87 01 78 00 Closeout Submittals Checklist For DD Form 1354 3.8 G

88 01 78 23 Operation and Maintenance Data O&M Database 1.3 G

89 01 78 23 Operation and Maintenance Data Training Plan 3.1.1 G

90 01 78 23 Operation and Maintenance Data Training Outline 3.1.3 G

91 01 78 23 Operation and Maintenance Data Training Content 3.1.2 G

92 01 78 23 Closeout Submittals Training Video Recording 3.1.4 G

93 01 78 23 Closeout Submittals Validation of Training Completion 3.1.6 G

94 02 82 16.00 20 Product Data Local Exhaust Equipment 3.1.4 G

95 02 82 16.00 20 Product Data Vacuums 3.1.5 G

96 02 82 16.00 20 Product Data Respirators 3.1.1.1 G

97 02 82 16.00 20 Product Data Pressure Differential Automatic

Recording Instrument

3.1.4 G

98 02 82 16.00 20 Product Data Amended Water 1.2.2 G

99 02 82 16.00 20 Product Data Glovebags 3.1.7 G

100 02 82 16.00 20 Product Data Safety Data Sheets (SDS) For All

Materials

1.3.8 G

101 02 82 16.00 20 Product Data Encapsulants 2.1 G

102 02 82 16.00 20 Test Reports Air Sampling Results 1.5.5 G

Eielson Air Force Base

FTQW 18-0203

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

APPROVING AUTHORITY

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE:

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

103 02 82 16.00 20 Test Reports Pressure Differential Recordings For

Local Exhaust System

1.5.6 G

104 02 82 16.00 20 Test Reports Asbestos Disposal Quantity Report 3.3.3.2 G

105 02 82 16.00 20 Test Reports Encapsulation Test Patches G

106 02 82 16.00 20 Test Reports Clearance Sampling 3.2.5.3 G

107 02 82 16.00 20 Certificates Asbestos Hazard Abatement Plan 1.3.9 G

108 02 82 16.00 20 Certificates Testing Laboratory 1.3.10 G

109 02 82 16.00 20 Certificates Private Qualified Person

Documentation

1.5.1 G

110 02 82 16.00 20 Certificates Contractor's License 1.5.4 G

111 02 82 16.00 20 Certificates Competent Person 1.5.2 G

112 02 82 16.00 20 Certificates Worker's License 1.5.3 G

113 02 82 16.00 20 Certificates Landfill Approval 1.3.11 G

114 02 82 16.00 20 Certificates Employee Training 1.3.3 G

115 02 82 16.00 20 Certificates Medical Certification 1.3.12 G

116 02 82 16.00 20 Certificates Waste Shipment Records 1.3.11 G

117 02 82 16.00 20 Certificates Respiratory Protection Program 1.3.6 G

118 02 82 16.00 20 Certificates Delivery Tickets 1.3.11 G

119 02 82 16.00 20 Certificates Vacuums 3.1.5 G

120 02 82 16.00 20 Certificates Water Filtration Equipment 3.1.2.3 G

121 02 82 16.00 20 Certificates Ventilation Systems 3.1.5 G

122 02 82 16.00 20 Certificates Equipment Used To Contain Airborne

Asbestos Fibers

3.1 G

123 02 82 16.00 20 Certificates Encapsulants 2.1 G

124 02 82 16.00 20 Certificates Notifications 1.3.4 G

125 02 82 16.00 20 Closeout Submittals Notifications 1.3.4 G

126 02 82 16.00 20 Closeout Submittals Rental Equipment 1.6.1 G

127 02 82 16.00 20 Closeout Submittals Respirator Program Records 1.3.6.1 G

128 02 82 16.00 20 Closeout Submittals Permits and Licenses 1.3.4 G

129 02 82 16.00 20 Closeout Submittals Protective Clothing Decontamination

Quality Control Records

1.5.7 G

130 02 82 16.00 20 Closeout Submittals Protective Clothing Decontamination

Facility Notification

1.5.8 G

131 02 83 13.00 20 Preconstruction Submittals Occupational and Environmental

Assessment Data Report

1.5.2.3 G

132 02 83 13.00 20 Preconstruction Submittals Lead Compliance Plan 1.5.2.2 G

133 02 83 13.00 20 Preconstruction Submittals Competent Person 1.5.1.1 G

134 02 83 13.00 20 Preconstruction Submittals Training Certification 1.5.1.2 G

135 02 83 13.00 20 Preconstruction Submittals Lead Waste Management Plan 1.5.2.8 G

136 02 83 13.00 20 Preconstruction Submittals Written Evidence 3.5.2.1 G

137 02 83 13.00 20 Preconstruction Submittals Medical Examinations 1.5.2.4 G

138 02 83 13.00 20 Test Reports Sampling Results 1.5.2.3 G

Eielson Air Force Base

FTQW 18-0203

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

APPROVING AUTHORITY

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE:

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

139 02 83 13.00 20 Test Reports Occupational and Environmental

Assessment Data Report

1.5.2.3 G

140 02 83 13.00 20 Certificates Testing Laboratory 1.5.1.3 G

141 02 83 13.00 20 Certificates Occupant Notification G

142 02 83 13.00 20 Certificates Third Party Consultant Qualifications 1.5.1.4 G

143 02 83 13.00 20 Certificates Clearance Certification 3.5.1.1 G

144 02 83 13.00 20 Closeout Submittals hazardous waste manifest 3.5.2.1 G

145 02 83 13.00 20 Closeout Submittals turn-in documents or weight tickets 3.5.2.1 G

146 03 30 00 Product Data Joint Sealants 2.3.7 G

147 03 30 00 Product Data Joint Filler 2.3.6 G

148 03 30 00 Product Data Cementitious Materials 2.3.1 G

149 03 30 00 Product Data Reinforcement 2.4 G

150 03 30 00 Design Data Mix Design 2.2.1 G

151 03 30 00 Test Reports Concrete Mix Design 1.6.1.1 G

152 03 30 00 Test Reports Compressive Strength Tests 3.12.2.3 G

153 03 30 00 Test Reports Air Content 3.12.2.4 G

154 03 30 00 Test Reports Slump Tests 3.12.2.1 G

155 05 40 00 Product Data Studs, Joists 2.1 G

156 05 40 00 Certificates Welds 3.1.1 G

157 07 84 00 Product Data Firestopping Materials 2.1 G

158 08 11 13 Shop Drawings Doors 3.1.2 G

159 08 11 13 Shop Drawings Frames 3.1.1 G

160 09 29 00 Product Data Accessories 2.1.5 G

161 09 29 00 Product Data Gypsum Board 2.1.1 G

162 09 90 00 Product Data Coating 2.1 G

163 09 90 00 Product Data Manufacturer's Technical Data Sheets 2.1 G

164 09 90 00 Samples Color 1.7 G

165 13 49 10 Shop Drawings X-Ray Shielding 2.1 G

166 13 49 10 Product Data Lead-Lined Wood Doors 2.5 G

167 13 49 10 Product Data Lead-Lined Steel Doors and Frames G

168 13 49 10 Product Data Lead-Lined Gypsum Board G

169 13 49 10 Product Data Lead Sheet G

170 13 49 10 Product Data Lead Clips or Tabs G

171 13 49 10 Test Reports Testing and Certification G

172 21 13 17.00 10 Shop Drawings Shop Drawings 1.4.3 G

173 21 13 17.00 10 Shop Drawings As-Built Drawings 3.6 G

174 21 13 17.00 10 Product Data List of Submittals G

175 21 13 17.00 10 Product Data Materials and Equipment 2.1 G

176 21 13 17.00 10 Product Data Spare Parts 1.6 G

Eielson Air Force Base

FTQW 18-0203

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

APPROVING AUTHORITY

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE:

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

177 21 13 17.00 10 Product Data Fire Protection Specialist 1.4.1 G

178 21 13 17.00 10 Product Data Installer Qualifications 1.4.2 G

179 21 13 17.00 10 Product Data Onsite Training 3.7 G

180 21 13 17.00 10 Design Data Sway Bracing 3.4.1 G

181 21 13 17.00 10 Design Data Hydraulic Calculations 1.2.1.2 G

182 21 13 17.00 10 Test Reports Preliminary Tests 3.5 G

183 21 13 17.00 10 Test Reports Final Acceptance Test 3.6 G

184 21 13 17.00 10 Certificates Inspection by Fire Protection Specialist 3.3 G

185 21 13 17.00 10 Operation and Maintenance Data Operating and Maintenance

Instructions

3.7 G

186 21 30 00 Preconstruction Submittals Fire Pump Installation Related

Submittals

1.3 G

187 21 30 00 Preconstruction Submittals Fire Protection Specialist 1.7.1 G

188 21 30 00 Shop Drawings Installation Drawings 3.3.1 G

189 21 30 00 Shop Drawings As-Built Drawings 3.9.2 G

190 21 30 00 Shop Drawings Piping Layout 3.3.2 G

191 21 30 00 Shop Drawings Pump Room 3.3.2 G

192 21 30 00 Product Data Catalog Data 2.1 G

193 21 30 00 Product Data Spare Parts 1.6 G

194 21 30 00 Product Data Preliminary Tests 3.7.2 G

195 21 30 00 Product Data Field Tests 3.7 G

196 21 30 00 Product Data Manufacturer's Representative 1.7.6 G

197 21 30 00 Product Data Field Training 3.9.1 G

198 21 30 00 Test Reports Preliminary Tests 3.7.2 G

199 21 30 00 Certificates Fire Protection Specialist 1.7.1 G

200 21 30 00 Certificates Qualifications of Welders 1.7.2 G

201 21 30 00 Certificates Qualifications of Installer 1.7.3 G

202 21 30 00 Certificates Preliminary Test Certification 1.7.4 G

203 21 30 00 Certificates Final Test Certification 1.7.5 G

204 21 30 00 Operation and Maintenance Data Operating and Maintenance

Instructions

3.9.1 G

205 21 30 00 Operation and Maintenance Data Flow Meter 2.12 G

206 22 00 00 Product Data Pipe Identification 2.1.3 G

207 22 00 00 Product Data Floor Drains 2.4.1 G

208 22 00 00 Test Reports Tests, Flushing and Disinfection 3.3 G

209 23 00 00 Product Data Louvers 2.5.4 G

210 23 00 00 Product Data In-Line Centrifugal Fans 2.6.1.1 G

211 23 00 00 Manufacturer’s Instructions Manufacturer's Installation Instructions 3.2 G

212 23 00 00 Manufacturer’s Instructions Operation and Maintenance Training 3.8.2 G

213 23 00 00 Operation and Maintenance Data Operation and Maintenance Manuals 3.8.1 G

214 23 00 00 Operation and Maintenance Data In-Line Centrifugal Fans 2.6.1.1 G

215 23 05 15 Product Data Pipe and Fittings 2.1 G

Eielson Air Force Base

FTQW 18-0203

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

APPROVING AUTHORITY

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE:

SUBMITTAL REGISTER

JOB NAME:

LOCATION:

CONTRACT NO:

CONTRACTOR:

216 23 05 15 Product Data Piping Specialties 2.2 G

217 23 05 15 Product Data Valves 2.3 G

218 23 05 15 Product Data Supporting Elements 2.4 G

219 23 05 15 Operation and Maintenance Data Operation and Maintenance Manuals 3.5 G

220 23 05 93 Shop Drawings TAB Schematic Drawings and Report

Forms

1.3.3 G

221 23 05 93 Product Data Equipment and Performance Data 1.3 G

222 23 05 93 Test Reports TAB Reports 3.4 G

223 23 05 93 Certificates Independent TAB Agency and

Personnel Qualifications

1.5.1 G

224 23 07 00 Product Data Pipe Insulation Systems 2.3 G

225 23 07 00 Product Data Duct Insulation Systems 3.3 G

226 23 07 00 Certificates Adhesives And Sealants 1.4.1 G

227 23 07 00 Manufacturer’s Instructions Pipe Insulation Systems 2.3 G

228 23 07 00 Manufacturer’s Instructions Duct Insulation Systems 3.3 G

229 26 08 00 Test Reports Acceptance tests and inspections 3.1 G

230 26 08 00 Certificates Qualifications 1.4.1 G

231 26 08 00 Certificates Acceptance test and inspections procedure

1.4.3 G

232 26 20 00 Product Data Receptacles 2.9 G

233 26 20 00 Product Data Circuit breakers G

234 26 20 00 Product Data Switches 2.8 G

235 26 20 00 Product Data Manual motor starters 2.11 G

236 26 20 00 Test Reports Grounding system test 3.4.4 G

237 26 20 00 Test Reports Ground-fault receptacle test 3.4.3 G

238 26 20 00 Operation and Maintenance Data Electrical Systems G

239 26 51 00 Product Data Luminaires 2.2 G

240 31 00 00 Product Data Utilization of Excavated Materials G

241 31 00 00 Product Data Field report G

242 31 00 00 Test Reports Testing 3.16 G

243 31 00 00 Test Reports Borrow Site Testing 2.1 G

244 31 00 00 Certificates Testing 3.16 G

245 31 00 00 Certificates Waste Manifests G

246 31 00 00 Certificates

ADEC Approved Disposal Facility

Weight And/Or Acceptance Ticket For

Contaminated Soil

G

247 31 00 00 Certificates

ADEC Approved Disposal Facility

Certificate Of Thermal Incineration Or

Disposal Of Contaminated Soil

G

248 31 00 00 Certificates

ADEC Transport, Treatment, &

Disposal Approval Form For

Contaminated Media (ATT)

G

File details come from the government source that posted it.