JA-2_Statement_of_Work.pdf
PDF 528 KB Posted
- Attached to
- Arctic Survival Roof Repair Federal contract opportunity
- Solicitation number
- FA5004-16-B-C004
About this file
JA-2 Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JA-6_Site_Map_ _As_Built_Drawings.pdf | ||
| JA-8_UFC_3-530-01.pdf | ||
| JA-2_Statement_of_Work.pdf | ||
| FA5004-16-B-C004-0001.pdf | ||
| Site_Visit_Record.pdf | ||
| JA-3_Specifications.pdf | ||
| JA-5_AF_Form_66.pdf | ||
| JA-1_Other_Contract_Requirements.pdf | ||
| JA-6_Site_Map_ _As_Built_Drawings.pdf | ||
| JA-4_Wage_Determination.pdf | ||
| FA5004-16-B-C004.pdf | ||
| JA-7_AF_Forms.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
PROJECT FTQW 16-1023
REPAIR ROOF AT ARCTIC SURVIVAL (B3347)
1.0 SCOPE: Furnish all plant, labor, supplies, parts, transportation, tools, equipment, and facilities necessary to perform work required to complete project FTQW 16-1023 in strict accordance with this Statement of Work, project specifications, and the contract.
2.0 DESCRIPTION OF WORK: Repair the entire roof of Bldg 3347 by replacement. The roof system shall be installed in accordance with manufacturers' specifications, as stated in
Specifications Section 072353, SD-08.
2.1 Remove the existing 20,347 sq. ft. BUR roof system, including insulation. Remove all flashing.
2.2 Remove 20,347 sq. ft. concrete pavers.
2.3 Install 20,347 90-mil EPDM system insulated to R38 and tapered, where necessary, in accordance with manufacturer's specifications and in the specifications, section 07530.
2.4 Install 20,347 5/8” gypsheeting thermal barrier in accordance with manufacturer’s specifications
2.5 Install new 12,000 SF flashing, expansion joints, and scuppers. Flashings shall be chosen and installed to withstand wind gusts at speeds of up to 24 knots and in accordance to Specifications, Section 07650 and manufacturing specifications. Roof flashing color must match roof material.
2.6 Install manufactured flashing for 43 vents though roof (VTRs) in accordance to
Specifications, Section 07720.
2.9 Install 20,347 SF FFP 8mil polyethylene vapor barrier in accordance to manufacturer’s specifications and to Specifications, Section 07650 8.8.
2.10 Install 10 new roof drains with 2-4” drain extensions and install flashing for drains in accordance to manufacturer’s specifications and Specifications, Section 07650 14.14.
2.11 Install roof warranty signs on exterior of building near roof access points.
2.11.1 Post a 12" x 12" x 1/8" brown sign with white lettering at any and all access points to the roof. These signs will be posted at or near eye level on the nearest vertical surfaces to the access points to the roof and will read
FA5004-16-B-C004
EIELSON AFB, AK
ATTACHMENT JA-2
as follows:
a. THIS ROOF IS UNDER WARRANTY UNTIL EXPIRATION DATE:
[expiration date of warranty] DO NOT PENETRATE THIS ROOF
WITHOUT NOTIFYING 354 CES Roofing Engineer, 377-3157
3.0 SUBMITTALS: Documents shall be submitted according to the attached AF Form 66.
3.1 Work Plans (WPs) - Prior to commencement of work, the Contractor shall submit a
Work Plan (WP) delineating methodology, material, manpower, etc. necessary to perform the work. The Work Plan shall also include a schedule. This plan shall cover each major definable feature of the work to be performed (Contractor’s work as well as Subcontractor’s work).
4.0 GOVERNMENT FURNISHED MATERIALS: None.
5.0 ATTACHMENTS:
5.1 AF Form 66, Schedule of Material Submittals
5.2 B3347 As-Builts
5 April 2016
END OF STATMENT
FA5004-16-B-C004
EIELSON AFB, AK
ATTACHMENT JA-2