Questions and Answers_Kodiak CDC Changing Stations.pdf
PDF 67 KB Posted
- Attached to
- Kodiak CDC Changing Tables Federal contract opportunity
- Solicitation number
- FA500023R0020
About this file
This document contains questions and answers regarding the removal of existing changing stations and installation of new changing tables in three rooms at a child development center. The contractor will be responsible for removing three changing stations from rooms 9 and 15, demolishing a sink and water fountain in room 5, moving any furniture out of the work areas, and installing vinyl flooring to match the existing flooring if any becomes exposed. Asbestos testing found no asbestos in the walls. The related federal contract opportunity is solicitation number FA500023R0020 for changing tables at the Kodiak Child Development Center through the Department of the Air Force Pacific Air Forces.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Kodiak CDC Changing Stations Questions and Answers.docx | DOCX document | |
| Solicitation Amendment FA500023R00200001 SF 30.pdf | ||
| Solicitation - FA500023R0020 (1).pdf | ||
| Attachment 2_Schematic.pdf | ||
| Attachment 3_Davis-Bacon Act WD AK20230001.pdf | ||
| Attachment 1_ Statement of Work.pdf | ||
| Solicitation - FA500023R0020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kodiak CDC Changing Table Questions and Answers
Q1. Are there only 3 existing changing stations to be removed, two in room 15 and one in room 9?
A1. In Room 9 existing changing station will be removed and in room 15 two changing statin will be removed.
Q2. Will furniture in rooms be cleared from the work areas; or is that the responsibility of the contractor?
A2. Contractors will move furniture and equipment out of the room while working in the designated area. The center POC will designate where items can be stored.
For the items that cannot be moved the contractors will cover with drop cloth or similar protective layering.
Q3. In Room 5, is the water fountain being replaced or demo’d?
A3. The water fountain will be demo’d with the sink.
Q4. Does the current stations in Rooms 5, 9 and 15 sit on the floor or will there be vinyl flooring repair when those come up?
A4a. It is unknown if the tables are currently sitting on top of vinyl flooring. Any floor that becomes exposed as a result of installing new changing tables must be replaced with vinyl flooring to match existing flooring.
A4b. Do you have surplus vinyl floor in storage?
There is no extra vinyl flooring available from government. The contractor will provided additional vinyl flooring as required.
Q5. Is there any known asbestos?
A5. Asbestos testing was conducted on the walls. There was no asbestos found in walls.