AMENDED Install Water Fountains Multiple Buildings Federal contract opportunity
Solicitation number
FA500023Q0068
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document is an amendment to a solicitation for the installation of water fountains at multiple buildings on Joint Base Elmendorf-Richardson in Alaska. The scope of work involves installing nine water fountains, including repairs to walls, painting, electrical, plumbing and structural support work. Lead paint abatement is also required. The period of performance is 120 days from notice to proceed. The estimated value is between $100,000 and $250,000. A pre-proposal site visit will be held on July 19, 2023 at 10:00 AM at Building 11551, with questions due by July 24, 2023. Offerors must submit proposals electronically in parts including a technical proposal limited to two pages demonstrating the ability to meet requirements, as well as pricing. The solicitation was issued by the Department of the Air Force Pacific Air Forces for work at Joint Base Elmendorf-Richardson.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

I N F O R M A T I O N

FROM TO

C o nt ra ct D es cr ip ti o n

Project to install nine (9) Government furnished water drinking fountains in Buildings 10555, 11525, 11551, 17534, 18727, 18762, 33415, and 32433. This requirement involves repairs to existing walls to include painting to match existing color, electrical, plumbing, and structural support for water fountains.

Contractor shall assume that the existing interior paint is lead-based paint (LBP). Abatement procedures are required to remove the lead paint. Only abate as minimal area necessary to install each water drinking fountain.

This requirement must meet all specifications outlined in the Statement of Work. The estimated Period of Performance for this project is 120 calendar days from issuance of the Notice to Proceed.

The subject project Magnitude of Construction in accordance with FAR 36.204(c) is between $100,000 and $250,000.

Alternate payment protections or bonding requirements are anticipated under the magnitude of this project. The contractor is to include any required alternate payment protections anticipated based upon their proposed pricing as prescribed in FAR 28.102-3 and IAW FAR 52.228-13 if applicable.

Project Location: Buildings 11551, 11525, 10555, 18727, 18762, 17534, 32433, 33415, Joint Base Elmendorf-Richardson (JBER), AK. Please refer to Attachment 8 - Site Visit Map for Facility Locations and the order of the walk through.

A pre-proposal site visit is planned and will be held on Wednesday, 18 July 2023, at 10:00 AM AKT. Parties will meet in front of Building 11551. All questions are due by Monday, 24 July 2023, 10:00 AM AKT.

Project to install nine (9) Government furnished water drinking fountains in Buildings 10555, 11525, 11551, 17534, 18727, 18762, 33415, and 32433. This requirement involves repairs to existing walls to include painting to match existing color, electrical, plumbing, and structural support for water fountains.

Contractor shall assume that the existing interior paint is lead-based paint (LBP). Abatement procedures are required to remove the lead paint. Only abate as minimal area necessary to install each water drinking fountain.

This requirement must meet all specifications outlined in the Statement of Work. The estimated Period of Performance for this project is 120 calendar days from issuance of the Notice to Proceed.

The subject project Magnitude of Construction in accordance with FAR 36.204(c) is between $100,000 and $250,000.

Alternate payment protections or bonding requirements are anticipated under the magnitude of this project. The contractor is to include any required alternate payment protections anticipated based upon their proposed pricing as prescribed in FAR 28.102-3 and IAW FAR 52.228-13 if applicable.

Project Location: Buildings 11551, 11525, 10555, 18727, 18762, 17534, 32433, 33415, Joint Base Elmendorf-Richardson (JBER), AK. Please refer to Attachment 8 - Site Visit Map for Facility Locations and the order of the walk through.

A pre-proposal site visit is planned and will be held on Wednesday, 19 July 2023, at 10:00 AM AKT. Parties will meet in front of Building 11551. All questions are due by Monday, 24 July 2023, 10:00 AM AKT.

Section C - Description/Specifications/Statement of Work

The Requirements text has been modified to:

Project to install nine (9) Government furnished water drinking fountains in Buildings 10555, 11525, 11551, 17534, 18727, 18762, 33415, and 32433. This requirement involves repairs to existing walls to include painting to match existing color, electrical, plumbing, and structural support for water fountains. Contractor shall assume that the existing interior paint is lead-based paint (LBP). Abatement procedures are required to remove the lead

FA500023Q00680001

paint. Only abate as minimal area necessary to install each water drinking fountain.

This requirement must meet all specifications outlined in the Statement of Work. The estimated Period of Performance for this project is 120 calendar days from issuance of the Notice to Proceed.

The subject project Magnitude of Construction in accordance with FAR 36.204(c) is between $100,000 and $250,000.

Alternate payment protections or bonding requirements are anticipated under the magnitude of this project. The contractor is to include any required alternate payment protections anticipated based upon their proposed pricing as prescribed in FAR 28.102-3 and IAW FAR 52.228-13 if applicable.

Project Location: Buildings 11551, 11525, 10555, 18727, 18762, 17534, 32433, 33415, Joint Base Elmendorf- Richardson (JBER), AK. Please refer to Attachment 8 - Site Visit Map for Facility Locations and the order of the walk through.

A pre-proposal site visit is planned and will be held on Wednesday, 19 July 2023, at 10:00 AM AKT. Parties will meet in front of Building 11551. All questions are due by Monday, 24 July 2023, 10:00 AM AKT.

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

(Non-commercial)

PROPOSAL PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of Three (3) separate parts; Part I - Summary and Miscellaneous Data, Part II - Price Proposal and, Part III - Technical Proposal.

B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists within the parameters of FAR 13.106-2, no additional data will be requested. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit other than certified cost or pricing data IAW FAR 15.402(a)(2) to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.

C. Specific Instructions:

1. Only submit electronic copies of the proposal

2. Submit copies via email to the Government POC's in the posting.

D. Proposal Instructions:

1. PART I - SUMMARY AND MISCELLANEOUS DATA. Submit electronic copy only.

(a) The offeror shall provide a concise summary and master table of contents of the entire proposal.

(b) Complete blocks 14, 15, 16, 17 and 18 of the RFP Section A, SF1442 In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(c) Complete block 19, 20a, 20b, and 20c of the RFP Section A, SF 1442, if any solicitation amendment(s) to the original solicitation documents was /were issued. Amendments will not be counted against the page limits.

(d) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

(e) If applicable, provide a copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status.

2. PART II - PRICE PROPOSAL - Submit electronic copy only.

(a) This part shall contain a completed Section B (Supplies or Services and Prices/Costs).

(b) Insert proposed unit prices and extended amounts in Section B for each Contract Line Item Number (CLIN) or Sub CLIN (SCLIN). The extended amount must equal the unit price multiplied by the number of units. It is imperative that mathematical calculations are correct. The unit prices and extended amounts are limited to two decimal places.

(c) Extreme care should be exercised to ensure that no price data of any kind are included in any other Part of the proposal.

3. PART III - TECHNICAL PROPOSAL - Submit electronic copy only.

Please revise Section L Part III-TECHNICAL PROPOSAL to "Submit electronic copy only. Provide no more than a two-page narrative demonstrating the offeror can identify and meet all the requirements stated in the attached Statement of Work. Please note that this is NOT a request for a capabilities statement or business competencies. The objective of this part is to submit a technical proposal that details the contractor's plan to accomplish the work and addresses the specifics of this project's requirements. A word-for-word copy of the Statement of Work also does NOT meet this factor. Structure specifications shall be submitted with the proposal and does not count against the two-page narrative. (Insert only if structure specs are required).

4. Past Performance The Government will obtain Past Performance information from established systems and other sources available to the Government. The evaluation of Past Performance is detailed in Section M. Offerors are not to submit Past Performance information. Any Past Performance information submitted will not be considered by the Government.

5. Format for proposal Parts I, II, and III, shall be as follows:

(a) Each written Part of the proposal shall contain a Table of Contents, Cross References, and the List of Tables and Drawings (if applicable).

(b) one electronic copy of each Part of the entire offer must be submitted. The electronic version of the proposal shall be submitted in a format readable by Microsoft Office 2010 which includes software programs such as WORD, EXCEL, or PowerPoint or Adobe Acrobat portable document files (.pdf) format. The electronic version shall be submitted via email to charmaine.cadua@us.af.mil and terrell.singleton@us.af.mil. USB flash drives, floppy disks, and zip disks are not acceptable.

E. General Information:

1. Offerors are cautioned that JBER has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. Late proposals will be processed in accordance with FAR 52.215-1(c)(3),"Submission, modification, revision, and withdrawal of proposals."

FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by this base:

New Year's Day Birthday of Martin Luther King Washington's Birthday Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day Juneteenth

2. A site visit will be held at Joint Base Elmendorf-Richardson (JBER) on 19 July 2023 to start at 10:00 AM Alaska Time (AKT) at Building 11551.

All costs associated with attending the site visit shall be borne by the offerors. Prospective offerors are urged to attend the site visit. If a contractor is unable to attend, there will be no future site visits scheduled. All questions are due by 10:00 AM AKT, 24 July 2023.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2016 52.216-1 Type of Contract APR 1984 52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work MAY 2014 52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998 52.252-5 Authorized Deviations In Provisions APR 1984

The following clauses were modified:

52.236-27 Alternate Feb 1995 I - Site Visit (Construction). (Alternate I) Feb 1995 hereby reads as follows:

. If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of Alternate I ( 1995)Feb the basic provision:

(b) An organized site visit has been scheduled for-

Wednesday, 19 July 2023 at 10:00 AM AKT

(c) Participants will meet at-

Building 11551, JBER AK

IDCode:
Page: 1
Pages: 5
AmendNo: 0001
EffDate: 14 Jul 2023
ReqNo:
ProjNo: FXSB 23-1024
IssCode: FA5000
AdmCode:
IssuedBy: FA5000 673 CONS LGC

10480 SIJAN AVE STE 242, CP 907 552 5614

JBER, AK 99506-2501

UNITED STATES

Charmaine Cadua, Email: charmaine.cadua@us.af.mil Telephone: 9075525744

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA500023Q0068
SolDate: 13 Jul 2023
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to:

1) Change the site visit date from 18 July 2023 to 19 July 2023.

ContNameTitle:
CoNameTitle: Terrell Singleton
ContDate:
CODate: 14 Jul 2023