Attachment 3 - AF66.pdf

PDF 95 KB Posted

Attached to
AMENDED Install Water Fountains Multiple Buildings Federal contract opportunity
Solicitation number
FA500023Q0068
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document outlines submittal requirements and schedules for a federal contract to install and repair water fountains at multiple buildings. The solicitation number is FA500023Q0068 and was issued by the Department of the Air Force Pacific Air Forces. Key required submissions include a construction schedule due 15 days after notice to proceed, health and safety plans due 15 days after notice to proceed, 65% design drawings due 30 days after notice to proceed, 100% design drawings due 45 days after notice to proceed, operation and maintenance manuals due 5 days after installation, and as-built drawings due 7 days after final completion. The schedule provides submission dates for items like material samples, test results, warranty information, and more throughout the duration of the contract.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LI

N

E N

U M

B ER Note: Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

GENERAL

Project Specific Form 66 X NTP + 15 Construction Schedule X NTP + 15 AF3064 (electronic required, hard copy optional) X NTP + 15 AF3065 (electronic required, hard copy optional) Contractor's Health, Safety, and Environment Plan X NTP + 15 Contractor's QA/QC Plan X NTP + 15

Construction Materials (Electrical, mechanical, etc.) X NTP + 15

Environmental PreCon List X NTP + 15 HAZMAT Approval X NTP + 15 Testing Plan X NTP + 60 65% Design All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 65%, and 100% Design Drawings to include:

X X X NTP + 30

Demolition Plan X NTP + 30 Mechanical Plan Electrical Plan 100% Design All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 95%, and 100% Design Drawings to include:

X X X X X X X X X NTP+45

Demolition Plan X chedule Mechanical Plan Electrical Plan

CLOSEOUT

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER FOR CONTRACTING TRACKING

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

FXSB 23-1024

Install Repair Water Fountains Multiple

Buildings

AF FORM 66, OCT 99 Previous Edition Will Be Used

LI

N

E N

U M

B ER Note: Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER FOR CONTRACTING TRACKING

PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER

FXSB 23-1024

Install Repair Water Fountains Multiple

Buildings

O&M maint. data and maint manuals & Manufacturer's Warranty for All Equipment Installed

X X X Install + 5

Factory and Field Test Certificates, Logs and Test Results X Before

Acceptance

HAZMAT Usage Report X NLT 7 after final AC.

Completion of DD 1354 X Final + 7 As Builts (electronic in AutoCAD, stamped ) X Final + 7

AF FORM 66, OCT 99 Previous Edition Will Be Used

Submittal 1

File details come from the government source that posted it. Updated .