1. Relocate Airfield Fence_SOW_amd1.pdf

PDF 171 KB Posted

Attached to
Relocation of Airfield Fence Federal contract opportunity
Solicitation number
FA500022Q0063
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to Relocation of Airfield Fence, newest first.
File Type Posted
Solicitation Amendment FA500022Q00630002 SF 30.pdf PDF
Updated Drawings.pdf PDF
Solicitation Amendment - FA500022Q00630002.pdf PDF
General Specifications.pdf PDF
Wage_Determination.pdf PDF
Utility Map.pdf PDF
Standard Detail for Fence.pdf PDF
Cipher Lock Spec Sheet.pdf PDF
Fence Relocation_Site Drawings.pdf PDF
Solicitation - FA500022Q0063.pdf PDF
General Specifications.pdf PDF
Wage_Determination.pdf PDF
H1 and H2 Fence Move SOW.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WT 8266910

Relocation of Airfield Fence near Hangar 1, Tower, and Hangar 2

(Buildings 11551, 11535, and 11525)

STATEMENT OF WORK

4/1/2022 (rev1 7/25/2022)

AMENDMENT 1 8/24/2022

General overview: Remove existing airfield fence, vehicle gates and pedestrian gates and install/relocate new airfield fencing, vehicle and pedestrian gates. Supply necessary power connection to reconfigured vehicle gate new gate locations as needed for full functionality. Ensure fence is secure at building terminations. Patch holes in asphalt where fence posts were removed.

Protect all existing utilities and facilities not included in scope of project.

At no point shall any portion of the airfield fence be unsecured. Contractor shall install new fence prior to removing old fence and/or use temporary fencing as required to maintain a secure airfield.

Cut existing fence posts level to grade and cap. If existing fence post foundations are set in concrete and have heaved above the asphalt surface, remove the foundation below grade, backfill, compact, and patch the asphalt. Verify demolition and repair plan with the Government prior to start of construction.

Contractor may drive new fence posts or install in concrete foundations. Indicate preferred method at time of bidding. See existing utility map for approximate locations of underground utilities. A dig permit is required prior to start of construction to verify utility locations.

Install new cipher locks on facility doors and new pedestrian gate, as shown in the site drawings.

For facilities, use Best EZ Series Keypad Locks, or approved equal. On pedestrian gate, use Simplex

1000 Series, or approved equal. The Government will provide the facility cipher locks.

Install two new manual swing gates and one new pedestrian gate where indicated in the site drawings. See standard details.

Building 11551 ‐ Elmendorf:

1. Supply materials, labor, and equipment necessary to furnish and install approximately 204

LF of 7’ 9 GA chain link fence with 3 strands of barbed wire between east side of Bldg

11551 and west side of Bldg 11535. Vehicle gate, and all necessary equipment for its use, currently in use in front of Bldg 11535 will be relocated to new fence. Fence will have 2‐7/8 terminal posts, 2‐2/8 line posts, 1‐5/8 top rail with 7 GA coil spring bottom tension wire hog ringed to fence.

Building 11535 ‐ Elmendorf:

2. Supply materials, labor, and equipment necessary to furnish and install approximately 322

LF of 7’ 9 GA chain link fence with 3 strands of barbed wire between east side of Bldg

11535 and west side of Bldg 11525. Pedestrian gate, and all necessary equipment for its use, currently in use in front of Bldg 11551 will be relocated to new fence. Fence will have

2‐7/8 terminal posts, 2‐2/8 line posts, 1‐5/8 top rail with 7 GA coil spring bottom tension wire hog ringed to fence.

3. Majority of fence shall be installed on top of concrete wall. Secure fence posts to concrete using industry standard concrete anchor bolts as required. Submit plan and product data for Government review and approval. Contractor may use shorter fence so the combined height of wall and fence is 8’ minimum. Fence shall not be less than 8’ tall from any accessible surface.

4. Install a new manual vehicle swing gate between Bldg 11535 and Bldg 11525 as shown in the site drawings. See standard swing gate detail.

5. Install two new pedestrian gates as shown in the site drawings, one adjacent to the manual swing gate at the northwest corner of Bldg 11525 and one at the southwest corner of Bldg

11535. Install mechanical cipher locks matching others used on airfield perimeter fence.

6. Reconfigure the existing electronic vehicle gate so the gate opens in the opposite direction.

Gate will need to open to the west so it does not interfere with the proposed new fence connection. Relocate power supply, mechanism, etc. as needed for full operation and to protect the motor from impact. Cut flush or remove existing bollards to not impeded traffic.

Building 11525 ‐ Elmendorf:

7. Supply materials, labor, and equipment necessary to furnish and install approximately 56

LF of 7’ 9 GA chain link fence with 3 strands of barbed wire on the southwest corner of between east side of Bldg 11535 and west side of Bldg 11525. Pedestrian gate, and all necessary equipment for its use, currently in use in front of Bldg 11525 will be relocated to new fence. Fence will have 2‐7/8 terminal posts, 2‐2/8 line posts, 1‐5/8 top rail with 7 GA coil spring bottom tension wire hog ringed to fence.

8. Install a new manual vehicle swing gate as shown in the site drawings. See standard swing gate detail.

9. Install 3 cipher locks on exterior facility doors of Bldg 11525 as shown in the site drawings.

Government will supply the locks; Contractor is responsible for installation.

General Notes

1.1 WORKMANSHIP: Accomplish all work in accordance with all applicable building and fire codes.

The Contractor shall field verify all measurements, quantities, or values stated by the

Government. The Contractor shall prepare a project specific quality control plan and implement documented measures as a routine requirement of this task order (TO).

1.2 WORKSITE: The Contractor shall limit the work to the areas indicated by the government. The

Contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The Contractor shall coordinate and schedule work with the 673

CES/CENM & Facility owner/CE offices prior to the start of any operation. The Contractor shall dispose of all construction debris off base at an approved disposal facility.

1.3 DIG PERMIT: Contractor will be responsible for completing the required dig permit for each work site location as it relates to their scope of work.

1.4 SITE SECURITY AND PROTECTION: The Contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.

1.5 DAMAGE TO EXISTING SITE CONDITIONS: The Contractor shall be responsible to repair all damage incurred to existing Real Property/Grounds at no cost to the government. The

Contractor shall not park or drive on sidewalk or grassy/snowy areas.

1.6 HEALTH/SAFETY: The Contractor shall be responsible for compliance with OSHA and AFI standards. The Contractor shall maintain a clean and debris free site at all times. The Contractor shall keep driveways and entrances into and around the work site clear at all times. The

Contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The Contractor shall minimize storage of materials and equipment on site.

1.7 ENVIRONMENTAL PROTECTION AND HAZARDOUS MATERIALS: Reference applicable laws and directives for requirements covering protection of land resources, protection of air and water quality, hazardous materials safety and general management, and storm water management. The Contractor shall reference specifications for the management of hazardous waste developed as a byproduct of this project.

1.8 GREEN PROCUREMENT: The Contractor must incorporate “green procurement” principles into the design of their projects. Specifically, consult the EPA’s web site at www.epa.gov/greenerproducts for a listing of the products mandated as green procurement requirements for purchases.

MACC Contractors are strongly encouraged to visit the site and get familiar with all the work related to the

Sewer Line repairs by CIPP prior to submitting a bid, to verify existing site condition and other information as noted in the scope of work and drawings, as well as to become familiar with the scope of work. Failure to visit the site does not relieve the Contractor from the responsibility of performing all work required to provide a complete and useable project in accordance with the Contract documents.