Attachment 6_AF66 (v2).pdf
PDF 140 KB Posted
- Attached to
- Demo Bldgs 57, 1113, 1114 Federal contract opportunity
- Solicitation number
- FA500021R0027
About this file
This solicitation package includes an AF Form 66 schedule of material submittals and details of a federal contract opportunity. The solicitation is for the demolition of three wooden multi-story buildings at Joint Base Elmendorf-Richardson in Alaska. Services required include removing all portions of the structures, including foundations, utilities, landscaping and paving connected to the buildings. The contractor must leave the areas level and topsoiled, seeding grass which must be maintained until the first cutting six inches in height. This first cutting is the contractor's responsibility. The solicitation number is FA500021R0027 and was issued by the Department of the Air Force Pacific Air Forces. The AF Form 66 schedule outlines 22 submittals required from the contractor at various stages of the project, focused on safety, environmental and disposal plans as well as daily reports and closeout documents. A mandatory site visit will be held on April 2, 2021.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. Attachment 6
AF FORM 66 (Computer Generated) PAGE 1 of 4
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SA
FE
TY
D
AT
A
SH
EE
TS
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G/
EN
VI
RO
NM
EN
TA
L
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
REMARKS
APPROVED DIS-
APPROVED
1 HAZMAT Approval, General Specs 01500, para. 5.1.3 and 5.1.5. x
NLT 10 working days prior to material being brought onto installation
2 HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5. x NLT 7 Working Days After Final
Acceptance
3 Movement Control Plan (If Needed) x 30 Working Days Prior to Movement
4 Quality Control Plan x 20 Days Prior to work start
Erosion Control Plan Open Market Specifications Para. 4.1.3 x 10 Days Prior to Pre- Construction Conference
LEAD WASTE MANAGEMENT PLAN (If needed) *Submittal 1.3.2.2 x x 30 Days prior to abatement work start
HJZH 21-1037,
HJZH 21-1035,
HJZH 21-1036
AF FORM 66 (Computer Generated) PAGE 2 of 4
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SA
FE
TY
D
AT
A
SH
EE
TS
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G/
EN
VI
RO
NM
EN
TA
L
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
REMARKS
APPROVED DIS-
APPROVED
HJZH 21-1037,
HJZH 21-1035,
HJZH 21-1036
ASBESTOS ABATEMENT WORK PLAN (If needed) *Submittal 1.3.2.2 x 30 Days Prior to work start
Disposal of Lead Containing Material (If needed)
*REQUIREMENTS
1.3.2.4 x x 30 Days Prior to work start
Utilities Work
*REQUIREMENTS
1.4 x x 30 Days Prior to work start
Water
*REQUIREMENTS
1.4.1 x 30 Days Prior to work start
Electrical
*REQUIREMENTS
1.4.3 x 30 Days Prior to work start
AF FORM 66 (Computer Generated) PAGE 3 of 4
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SA
FE
TY
D
AT
A
SH
EE
TS
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G/
EN
VI
RO
NM
EN
TA
L
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
REMARKS
APPROVED DIS-
APPROVED
HJZH 21-1037,
HJZH 21-1035,
HJZH 21-1036
Natural Gas
*REQUIREMENTS
1.4.5 x 30 Days Prior to work start
Hazardous material Sampling and analysis plan and schedule. (If needed)
*REQUIREMENTS
1.5 x x 30 Days Prior to work start
Record of Training for Contractor Employees
*REQUIREMENTS
1.5.2 x x 30 Days Prior to work start
Daily Reports
*REQUIREMENTS
1.6.1 x Daily upon award of contract
Safety Data Sheets (SDSs)
*REQUIREMENTS
1.5 x x 30 Days Prior to work start
AF FORM 66 (Computer Generated) PAGE 4 of 4
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SA
FE
TY
D
AT
A
SH
EE
TS
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G/
EN
VI
RO
NM
EN
TA
L
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
REMARKS
APPROVED DIS-
APPROVED
HJZH 21-1037,
HJZH 21-1035,
HJZH 21-1036
Medical Certification *Submittal (If needed) 1.5.2 x 30 Days Prior to work start
Landfill Approval *Submittal 1.5.1 x 30 Days Prior to work start
Testing Laboratory *Submittal (If needed) 1.3.2 x x 30 Days Prior to work start
Accumulation point daily and weekly inspection summary sheets
*REQUIREMENTS
1.5.1 x x Daily and weekly upon work start
Chain Of Custody Documents On Hazardous Materials. (If Needed) 1.5 x 30 Days after project completion
Seeding Submittals. (If needed)
1.3.2.10 x 30 Days Prior to work start
AF66- Material Submittals
File details come from the government source that posted it. Updated .