Attachment 6_AF66 (v2).pdf

PDF 140 KB Posted

Attached to
Demo Bldgs 57, 1113, 1114 Federal contract opportunity
Solicitation number
FA500021R0027
Issued by
Department of the Air Force Pacific Air Forces

About this file

This solicitation package includes an AF Form 66 schedule of material submittals and details of a federal contract opportunity. The solicitation is for the demolition of three wooden multi-story buildings at Joint Base Elmendorf-Richardson in Alaska. Services required include removing all portions of the structures, including foundations, utilities, landscaping and paving connected to the buildings. The contractor must leave the areas level and topsoiled, seeding grass which must be maintained until the first cutting six inches in height. This first cutting is the contractor's responsibility. The solicitation number is FA500021R0027 and was issued by the Department of the Air Force Pacific Air Forces. The AF Form 66 schedule outlines 22 submittals required from the contractor at various stages of the project, focused on safety, environmental and disposal plans as well as daily reports and closeout documents. A mandatory site visit will be held on April 2, 2021.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. Attachment 6

AF FORM 66 (Computer Generated) PAGE 1 of 4

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

R

EC

OM

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

CA

TA

LO

G

DA

TA

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SA

FE

TY

D

AT

A

SH

EE

TS

OT

HE

R

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G/

EN

VI

RO

NM

EN

TA

L

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

FI

NA

L

AP

PR

OV

AL

REMARKS

APPROVED DIS-

APPROVED

1 HAZMAT Approval, General Specs 01500, para. 5.1.3 and 5.1.5. x

NLT 10 working days prior to material being brought onto installation

2 HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5. x NLT 7 Working Days After Final

Acceptance

3 Movement Control Plan (If Needed) x 30 Working Days Prior to Movement

4 Quality Control Plan x 20 Days Prior to work start

Erosion Control Plan Open Market Specifications Para. 4.1.3 x 10 Days Prior to Pre- Construction Conference

LEAD WASTE MANAGEMENT PLAN (If needed) *Submittal 1.3.2.2 x x 30 Days prior to abatement work start

HJZH 21-1037,

HJZH 21-1035,

HJZH 21-1036

AF FORM 66 (Computer Generated) PAGE 2 of 4

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

R

EC

OM

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

CA

TA

LO

G

DA

TA

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SA

FE

TY

D

AT

A

SH

EE

TS

OT

HE

R

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G/

EN

VI

RO

NM

EN

TA

L

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

FI

NA

L

AP

PR

OV

AL

REMARKS

APPROVED DIS-

APPROVED

HJZH 21-1037,

HJZH 21-1035,

HJZH 21-1036

ASBESTOS ABATEMENT WORK PLAN (If needed) *Submittal 1.3.2.2 x 30 Days Prior to work start

Disposal of Lead Containing Material (If needed)

*REQUIREMENTS

1.3.2.4 x x 30 Days Prior to work start

Utilities Work

*REQUIREMENTS

1.4 x x 30 Days Prior to work start

Water

*REQUIREMENTS

1.4.1 x 30 Days Prior to work start

Electrical

*REQUIREMENTS

1.4.3 x 30 Days Prior to work start

AF FORM 66 (Computer Generated) PAGE 3 of 4

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

R

EC

OM

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

CA

TA

LO

G

DA

TA

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SA

FE

TY

D

AT

A

SH

EE

TS

OT

HE

R

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G/

EN

VI

RO

NM

EN

TA

L

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

FI

NA

L

AP

PR

OV

AL

REMARKS

APPROVED DIS-

APPROVED

HJZH 21-1037,

HJZH 21-1035,

HJZH 21-1036

Natural Gas

*REQUIREMENTS

1.4.5 x 30 Days Prior to work start

Hazardous material Sampling and analysis plan and schedule. (If needed)

*REQUIREMENTS

1.5 x x 30 Days Prior to work start

Record of Training for Contractor Employees

*REQUIREMENTS

1.5.2 x x 30 Days Prior to work start

Daily Reports

*REQUIREMENTS

1.6.1 x Daily upon award of contract

Safety Data Sheets (SDSs)

*REQUIREMENTS

1.5 x x 30 Days Prior to work start

AF FORM 66 (Computer Generated) PAGE 4 of 4

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

R

EC

OM

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

CA

TA

LO

G

DA

TA

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SA

FE

TY

D

AT

A

SH

EE

TS

OT

HE

R

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G/

EN

VI

RO

NM

EN

TA

L

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

FI

NA

L

AP

PR

OV

AL

REMARKS

APPROVED DIS-

APPROVED

HJZH 21-1037,

HJZH 21-1035,

HJZH 21-1036

Medical Certification *Submittal (If needed) 1.5.2 x 30 Days Prior to work start

Landfill Approval *Submittal 1.5.1 x 30 Days Prior to work start

Testing Laboratory *Submittal (If needed) 1.3.2 x x 30 Days Prior to work start

Accumulation point daily and weekly inspection summary sheets

*REQUIREMENTS

1.5.1 x x Daily and weekly upon work start

Chain Of Custody Documents On Hazardous Materials. (If Needed) 1.5 x 30 Days after project completion

Seeding Submittals. (If needed)

1.3.2.10 x 30 Days Prior to work start

AF66- Material Submittals

File details come from the government source that posted it. Updated .