Attachment 6_AF66.pdf

PDF 122 KB Posted

Attached to
Demo Bldgs 57, 1113, 1114 Federal contract opportunity
Solicitation number
FA500021R0027
Issued by
Department of the Air Force Pacific Air Forces

About this file

This solicitation package includes a schedule of material submittals and details of a federal contract opportunity for demolition services at Joint Base Elmendorf-Richardson in Alaska. The solicitation requests the demolition, removal, and disposal of three three-story wood-framed buildings by September 30, 2021. Contractors must remove all portions of each building and foundations, leaving a level area topped with soil and seeded grass that is maintained until the first cutting. The schedule of material submittals outlines 21 required submissions at various stages of the project, including hazard analyses, waste management plans, safety data sheets, daily reports, and documentation of hazardous material handling. A mandatory site visit will be held on April 2, 2021 to review the project scope at buildings 1113 and 1114, with interested contractors registering attendees in advance.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. Attachment 6

AF FORM 66 (Computer Generated) PAGE 1 of 2

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

R

EC

OM

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

CA

TA

LO

G

DA

TA

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SA

FE

TY

D

AT

A

SH

EE

TS

OT

HE

R

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G/

EN

VI

RO

NM

EN

TA

L

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

FI

NA

L

AP

PR

OV

AL

REMARKS

APPROVED DIS-

APPROVED

1 HAZMAT Approval, General Specs 01500, para.

5.1.3 and 5.1.5. x NLT 10 working days prior to material being brought onto installation

2 HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5. x NLT 7 Working Days After Final

Acceptance 3 Quality Control Plan x 20 Days Prior to work start

4 HABS Draft Documentation Para. 1.3.1.8 and 1.3.1.12.1 x NTP + 180 days

LEAD WASTE MANAGEMENT PLAN (If needed) *Submittal 1.3.2.2 x x 30 Days prior to abatement work start

ASBESTOS ABATEMENT WORK PLAN (If needed) *Submittal 1.3.2.2 x 30 Days Prior to work start

Disposal of Lead Containing Material (If needed)

*REQUIREMENTS

1.3.2.4 x x 30 Days Prior to work start

Utilities Work

*REQUIREMENTS

1.4 x x 30 Days Prior to work start

Water

*REQUIREMENTS

1.4.1 x 30 Days Prior to work start

Electrical

*REQUIREMENTS

1.4.3 x 30 Days Prior to work start

Natural Gas

*REQUIREMENTS

1.4.5 x 30 Days Prior to work start

Hazardous material Sampling and analysis plan and schedule. (If needed)

*REQUIREMENTS

1.5 x x 30 Days Prior to work start

Record of Training for Contractor Employees

*REQUIREMENTS

1.5.2 x x 30 Days Prior to work start

HJZH 21-1037, HJZH

21-1035, HJZH 21-

Solicitation No. Attachment 6

AF FORM 66 (Computer Generated) PAGE 2 of 2

PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:

SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

R

EC

OM

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

CA

TA

LO

G

DA

TA

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SA

FE

TY

D

AT

A

SH

EE

TS

OT

HE

R

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G/

EN

VI

RO

NM

EN

TA

L

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

DATE CONTRACTOR

NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

FI

NA

L

AP

PR

OV

AL

REMARKS

APPROVED DIS-

APPROVED

HJZH 21-1037, HJZH

21-1035, HJZH 21-

Daily Reports

*REQUIREMENTS

1.6.1 x Daily upon award of contract

Safety Data Sheets (SDSs)

*REQUIREMENTS

1.5 x x 30 Days Prior to work start

Medical Certification *Submittal (If needed) 1.5.2 x 30 Days Prior to work start

Landfill Approval *Submittal 1.5.1 x 30 Days Prior to work start

Testing Laboratory *Submittal (If needed) 1.3.2 x x 30 Days Prior to work start

Accumulation point daily and weekly inspection summary sheets

*REQUIREMENTS

1.5.1 x x Daily and weekly upon work start

Chain Of Custody Documents On Hazardous Materials. (If Needed) 1.5 x 30 Days after project completion

21 Seeding Submittals. (If needed)

1.3.2.10 x 30 Days Prior to work start

AF66- Material Submittals