Attachment 6_AF66.pdf
PDF 122 KB Posted
- Attached to
- Demo Bldgs 57, 1113, 1114 Federal contract opportunity
- Solicitation number
- FA500021R0027
About this file
This solicitation package includes a schedule of material submittals and details of a federal contract opportunity for demolition services at Joint Base Elmendorf-Richardson in Alaska. The solicitation requests the demolition, removal, and disposal of three three-story wood-framed buildings by September 30, 2021. Contractors must remove all portions of each building and foundations, leaving a level area topped with soil and seeded grass that is maintained until the first cutting. The schedule of material submittals outlines 21 required submissions at various stages of the project, including hazard analyses, waste management plans, safety data sheets, daily reports, and documentation of hazardous material handling. A mandatory site visit will be held on April 2, 2021 to review the project scope at buildings 1113 and 1114, with interested contractors registering attendees in advance.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. Attachment 6
AF FORM 66 (Computer Generated) PAGE 1 of 2
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SA
FE
TY
D
AT
A
SH
EE
TS
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G/
EN
VI
RO
NM
EN
TA
L
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
REMARKS
APPROVED DIS-
APPROVED
1 HAZMAT Approval, General Specs 01500, para.
5.1.3 and 5.1.5. x NLT 10 working days prior to material being brought onto installation
2 HAZMAT Usage Report, General Specs 01500, para. 5.1.3 and 5.1.5. x NLT 7 Working Days After Final
Acceptance 3 Quality Control Plan x 20 Days Prior to work start
4 HABS Draft Documentation Para. 1.3.1.8 and 1.3.1.12.1 x NTP + 180 days
LEAD WASTE MANAGEMENT PLAN (If needed) *Submittal 1.3.2.2 x x 30 Days prior to abatement work start
ASBESTOS ABATEMENT WORK PLAN (If needed) *Submittal 1.3.2.2 x 30 Days Prior to work start
Disposal of Lead Containing Material (If needed)
*REQUIREMENTS
1.3.2.4 x x 30 Days Prior to work start
Utilities Work
*REQUIREMENTS
1.4 x x 30 Days Prior to work start
Water
*REQUIREMENTS
1.4.1 x 30 Days Prior to work start
Electrical
*REQUIREMENTS
1.4.3 x 30 Days Prior to work start
Natural Gas
*REQUIREMENTS
1.4.5 x 30 Days Prior to work start
Hazardous material Sampling and analysis plan and schedule. (If needed)
*REQUIREMENTS
1.5 x x 30 Days Prior to work start
Record of Training for Contractor Employees
*REQUIREMENTS
1.5.2 x x 30 Days Prior to work start
HJZH 21-1037, HJZH
21-1035, HJZH 21-
Solicitation No. Attachment 6
AF FORM 66 (Computer Generated) PAGE 2 of 2
PROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS Multi-Facility Demolition, Bldg 57, 1113, 1114
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
SH
OP
D
RA
W
IN
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S
R
EC
OM
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
CA
TA
LO
G
DA
TA
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SA
FE
TY
D
AT
A
SH
EE
TS
OT
HE
R
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G/
EN
VI
RO
NM
EN
TA
L
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
DATE CONTRACTOR
NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L
AP
PR
OV
AL
REMARKS
APPROVED DIS-
APPROVED
HJZH 21-1037, HJZH
21-1035, HJZH 21-
Daily Reports
*REQUIREMENTS
1.6.1 x Daily upon award of contract
Safety Data Sheets (SDSs)
*REQUIREMENTS
1.5 x x 30 Days Prior to work start
Medical Certification *Submittal (If needed) 1.5.2 x 30 Days Prior to work start
Landfill Approval *Submittal 1.5.1 x 30 Days Prior to work start
Testing Laboratory *Submittal (If needed) 1.3.2 x x 30 Days Prior to work start
Accumulation point daily and weekly inspection summary sheets
*REQUIREMENTS
1.5.1 x x Daily and weekly upon work start
Chain Of Custody Documents On Hazardous Materials. (If Needed) 1.5 x 30 Days after project completion
21 Seeding Submittals. (If needed)
1.3.2.10 x 30 Days Prior to work start
AF66- Material Submittals