Scope_of_Work_5Jun19.pdf

PDF 278 KB Posted

Attached to
Overhead Hoists Upgrade Federal contract opportunity
Solicitation number
FA5000-19-Q-A041
Issued by
Department of the Air Force Pacific Air Forces

About this file

Revised Scope of Work.

View the file

Other files for this federal contract opportunity

Other files attached to Overhead Hoists Upgrade, newest first.
File Type Posted
MFR_SiteVisit.pdf PDF
Photo2.gif GIF image
Photo3.jpg JPG image
Photo1.jpg JPG image
COMBO.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2: SCOPE OF WORK

FA5000-19-Q-A041

Hoists shall have a low speed and high speed.

New hoists will need to provide at a minimum 17ft of coil chain in a chain collector. The chain will be of sufficient length as to allow the hook to touch the floor.

Hoists shall have a lift height of 15 feet.

Contractor shall complete the following:

Remove and dispose of four existing Beebe 2-ton overhead hoists.

Install four new 2-ton hoists and trolleys on existing hoist bridge and end trucks, to include utilizing current power configuration of 460V-3ph-60Hz and a 120VAC control voltage. All electrical working accordance with local, State and Federal Codes.

Hoists shall utilize the existing pendant controller (a 2-speed with maintained on/off buttons).

Perform load test and certify each hoist in accordance with Local, State and Federal codes as required and provide certificates.

Perform periodic inspections IAW new hoist owners/user’s manual.

HOIST UPGRADE SCOPE OF WORK, 5 JUNE 2019

File details come from the government source that posted it.