PP Questionare FY 12.doc

DOC document 67 KB Posted

Attached to
ICIDS II Alarm System
Solicitation number
FA5000-11-R-0028
Issued by

About this file

Past Performance Questionare FY 12

View the file

Other files

File Type Posted
Answers and Questions.docx DOCX document
FA5000-11-R-0028 Amendment 0002 - Add FAR Clause 52.219-4.doc DOC document
FA5000-11-R-0028 Amendment 0001 to Correct Language in Attachment 4 PP Questionnaire - Page 1.doc DOC document
PP Questionare FY 12-updated 7-25-11.doc DOC document
Final DD254.docx DOCX document
WD 05-2017 REV 15 06-13-11.docx DOCX document
PWS ICIDS.doc DOC document
FA5000-11-R-0028 ICIDS.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA5000-11-R-0028

ATTACHMENT 4

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

When Filled In This Document Is Source Selection Sensitive in accordance with Federal Acquisition Regulation parts 2.101 and 3.104

SUBJECT: Request for Past Performance Evaluation

TO:

You have been identified as a point of contact for a past and/or present performance evaluation of the firm listed on the attached questionnaire. This firm is currently being considered for a Privately Owned Vehicle (POV) storage contract at Joint Base Elmendorf-Richardson (JBER), Alaska.

Please complete the attached questionnaire and send to:

673d Contracting Squadron/LGCB 10480 22nd Street, Suite 368

JBER, AK 99506-2501

lucian.reaves@elmendorf.af.mil Facsimile: (907) 552-7497

Your prompt attention to this questionnaire will be greatly appreciated. If you have any questions concerning this request, I can be contacted at

1 Atch

Past and Present Performance Questionnaire

CONTRACTOR’S NAME: _______________ CONTRACT NUMBER: _______________

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

A. GENERAL INFORMATION: Please correct any information below known to be inaccurate:

Contractor’s Name: ____________________ Telephone Number: ____________________

Address: __________________________ Fax Number: _________________________

__________________________ Point of Contact: ______________________

Project Title and Brief Description of Work: _____________________________________*

Contract Number Provided by Offeror: ___________________ Dollar Amount: ________*

Contract Period or Dates of Performance Provided by Offeror: ______________________* Contractor performed as the ( Prime Contractor ( Sub-Contractor ( Key Personnel.

* Note: If offeror holds or has held other contracts with your agency/organization in the last 3 years, please complete separate evaluation forms for those contracts as well.

B. RESPONDENT INFORMATION:

Name of Respondent:

_____________________ Title: ____________________________

Address: _____________________

Telephone Number: ___________________ _____________________________

Fax Number:

Email Address: _____________________

C. FAX COMPLETED SURVEY FORM TO: (907) 552-7497

CONTRACTOR’S NAME: _______________ CONTRACT NUMBER: _______________

D. PERFORMANCE INFORMATION: Please read the statements below, indicating your relative level of agreement in the box provided: (E, G, S, M, U, and N) PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U.

E
G
S
M
U
N
Exceptional
Good
Satisfactory
Marginal
Unsatisfactory
Neutral

Performance meets contractual requirements with many exceeded to the Customer’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.

Performance meets contractual requirements with some exceeded to the Customer’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor was effective.

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Performance was not observed or not applicable to the current effort being reported against.

CONTRACTOR’S NAME: _______________ CONTRACT NUMBER: _______________

Place an “X” in the appropriate column using the definitions matrix above.

The contractor:
E
G
S
M
U
N
1.
The Contractor provided a product or service that conformed to contract requirements, specifications, and standards of good workmanship
2.
The Contractor submitted accurate reports.
3.
The Contractor utilized personnel that were appropriate to the effort performed.
4
The tasks required under this effort were performed in a timely manner and in accordance with the period of performance of the contract.
5.
The Contractor was responsive to technical and/or contractual direction.
6.
The Contractor performed the effort within the estimated cost/price.
7.
he Contractor submitted accurate invoices on a timely basis
8.
The Contractor demonstrated cost efficiencies in performing the required effort.
9.
The actual costs/rates realized closely reflected the negotiated costs/rates.
10.
The Contractor demonstrated effective management over the effort performed.
11.
The Contractor maintained an open line of communication so that the COR and/or Technical Point of Contact were apprised of technical, cost, and schedule issues.
12.
The Contractor presented information and correspondence in a clear, concise, and businesslike manner.
13.
The Contractor promptly notified the Contracting Officer’s Representative, Technical Point of Contact, and/or Contracting Officer in a timely manner regarding urgent issues.
14.
The Contractor cooperated with the Government in providing flexible, proactive, and effective recommended solutions to critical program issues.
15.
The Contractor made timely award to, and demonstrated effective management of, its subcontractors.
16.
The Contractor demonstrated an effective small/small disadvantaged business subcontracting program.
17.
The labor turnover in key personnel labor categories was minimal and did not adversely affect Contractor performance.
18.
The Contractor did not frequently propose personnel to fulfill the requirements of the contract that were clearly unqualified.
19.
Rate the contractor's overall performance?
20.
Would you award another contract to this contractor? If not, explain in “remarks.”
YES/NO

CONTRACTOR’S NAME: ___________________ CONTRACT NUMBER __________

Remarks:______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

File details come from the government source that posted it. Updated .