This document is a two-step sealed bid solicitation from the Department of the Air Force Air Combat Command for the ECM Munitions Storage Facilities Roof Repair project at Mountain Home AFB, Idaho. The solicitation seeks a qualified, experienced, woman-owned small business contractor to demolish, replace, and repair the roofs of Earth Covered Magazine Munitions Storage Facilities 3003 and 3010, and optional facilities 3004 and 3006.

The project scope includes removal and replacement of the trenched pipe drainage system, installation of a new roof waterproofing membrane, design and construction of a new lightning protection system, and replacement of the existing gunite-coating with a geocell confinement system. The period of performance is 265 calendar days per facility, with an estimated construction value between $1,000,000 and $5,000,000. The solicitation is set aside for women-owned small businesses under NAICS code 236220. Technical proposals are due on May 2, 2024, and the second step of the sealed bid process will be issued at a later date.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair MUNS Roof, B3003 RFI - 01 22-Apr-24

1. At the site walk it was observed that there was some cracking, spalling, and what appears may be potential structural deficiencies. In revieing the SOW, it appears that evaluation, design, and repair of any potential structural deficiencies is not part of this solicitation.

Please confirm if this is correct.

a. Correct. Evaluation, design, and repair of any potential structural deficiencies observed at the site visit on 12 April 2024 is not part of this solicitation.

b. Repairs for deficiencies to concrete is limited to the outside, top (roof) surface of the concrete structure for the preparation of the new, weather proofing membrane as described in the SOW.

2. If evaluation, design, and repair of any potential structural deficiencies is to be added to the scope of this project, please confirm how the contractor is to quantify these repairs. This is especially important as to ensure an even and fair comparison of bids as the full extent of any potential repairs is unknown and will be unknown until a contract is awarded and additional more operationally invasive investigations are able to take place.

a. Evaluation, design, and repair of any potential structural deficiencies observed at the site visit on 12 April 2024 is not part of this solicitation.

3. Please confirm that as-builts for the existing facilities will be provided as part of the documents provided to o erors who are invited to step two of the solicitation.

a. As-built drawings will be issued to the winning bidder for design.

b. A 2016 Design (obsolete) which includes drawings, design analysis, and a partial specification will be issued to the participants in round two. The design drawings are final design and includes details that are typical for a final design – plans, sections, details.

4. The SOW indicates that the Period of performance is 265 days per facility. Please confirm if construction on multiple facilities will be allowed to happen simultaneously.

a. 265 day PoP is for one facility. It is reasonable in the eyes of the Gov’t that the PoP for two simultaneous facilities may not necessarily double, but would be significantly longer that the 265 day PoP for one facility.

5. The SOW indicates that the Period of performance is 265 days per facility. Please confirm if construction will be limited on the number of facilities under construction at a time.

a. Simultaneous work on multiple facilities is not prohibited, but roads must be open for access to all other facilities at all times, unless special temporary authorization is obtained from the Gov’t.

6. Please confirm if the contractor will be permitted to stage materials and equipment within the MUNS Area.

a. The Gov’t will approve staging materials and equipment within the MUNS area on a case-by-case basis. Material and equipment staging approval will be subject to MUNS’ discretion, with concern for security and AF regulations.

Repair MUNS Roof, B3003 RFI - 01 22-Apr-24

7. If the contractor will not be permitted to stage materials and equipment within the MUNS Area, please confirm where staging will be permitted.

a. There is a nearby staging area across Liberator Road that has been authorized for staging materials and equipment.