PTR Site Visit Pre Conf Slides - SAM Posting.pdf
PDF 6 MB Posted
- Attached to
- Operations, Maintenance, and Support of ACC Primary Training Ranges (PTR) Federal contract opportunity
- Solicitation number
- FA489025R0006
About this file
These are pre-conference site visit slides for the Air Combat Command's Primary Training Ranges (PTR) Operations, Maintenance, and Support contract. The solicitation covers comprehensive operational and maintenance services for multiple training ranges across the United States, including sites in Florida, Georgia, Wyoming, North Carolina, New Mexico, South Carolina, Idaho, and Texas. Key contract characteristics include a single award firm-fixed-price contract with cost-reimbursable line items, anticipated to be 100% set aside for small businesses under NAICS code 561210 with a $47M size standard.
The procurement timeline includes a draft solicitation issued on 6 May 2025, pre-conference site visits on 17 April 2025, final solicitation on 16 June 2025, proposals due 31 July 2025, contract award on 12 January 2026, and performance start on 1 April 2026. The evaluation methodology will use a best-value tradeoff approach, with a technical factor more important than price. Technical evaluation will focus on transition planning, technical experience, and program management, including manning, quality control, and contractor equipment. A secret facility security clearance is required for proposal submission, and offerors must demonstrate technical experience performing similar work within the last 8 years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Poinsett Range Briefing - May 2025.pdf | ||
| Primary Training Ranges (PTR) 2nd Site Visit (Poinsett Range).pdf | ||
| Primary Training Ranges (PTR) Site Visit_1.pdf | ||
| Primary Training Ranges (PTR) Industry Day Info Update.pdf | ||
| 9 Dec 2024 PTR Industry Day Registration Info.pdf | ||
| 9 Dec 24 Industry Day Compiled Questions and Government Responses.pdf | ||
| PTR Industry Day Slides - SAM Posting.pdf | ||
| PTR SOW as of 7 Nov 2024.pdf | ||
| Primary Training Ranges Industry Day Notice and Registration Instructions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This Briefing is:
UNCLASSIFIED
Headquarters Air Combat Command
Primary Training Ranges (PTR) Site Visit Pre-Conference
Reference Number: FA489025R0006
MSgt Christopher Foy PTR Program Manager
ACC/A3AR
Government Team
MSgt Christopher Foy, HQ ACC/A3AR Program Manager
Capt Ryan Tagatac, AMIC/PKBAContracting Officer
Ms. Sandra Redfearn, AMIC/PKBAContract Specialist
Topics of Discussion
• PTR Program
• PTR 101
• Customers and Locations
• SOW Requirements
• Major Areas of the SOW
• Special Interest Areas
• Acquisition Strategy / Solicitation
• Mountain Home Ranges Brief
• Questions
Primary Training Ranges (PTR) A Critical Component of Live OTI
• Operational Training Infrastructure - The framework, services, and resources used to accomplish USAF OT
• Live OTI includes ranges, sites, ops centers, etc.
• Range Threat Systems / Air Combat Training Systems
• Airspace, ranges, and off-range lands
• Scoring, feedback, and targets
• Pods, instrumentation, weapon/system interface devices
• Networks, communications, cybersecurity
• Supporting workforce (O&M, Eng, PM, QA, etc.)
PTR is a distinct set of capabilities and a major data set integrated into OTI from an Enterprise viewpoint
• Operational Training - Mission essential task training in support of operational force readiness.
GPS Accuracy
Integrated Operations
Ground-Based Weapon ScoringPod Ground Station
Link Ground Stations
JNTC / DMO
Network
Global Information Grid (GIG) Integrated Live Ops
Threat Systems
Changing Factors Regionalization
• OTI assets grouped regionally to meet increasing training requirements with limited assets
• PTR has critical primary roles in delivering an effective live OTI environment
• Operate & Maintain systems needed to provide training and feedback
• Integrate operations with other training activities for a consolidated training picture
• Provide system data to support live execution of the training sortie
• Provide realistic target sets for aircraft sensors and weapons employment
• PTR has supporting roles to enable an effective live OTI environment
• Routine, persistent, interface with warfighters for scheduling, support, and feedback
• Program and quality management to ensure reliable and repeatable delivery of
PTR capabilities
• Feedback to Program Offices on equipment issues to aid technical/engineering activities for system improvements
PTR 101
Changing Factors Technology Turnover
• Multiple new systems projected 3-8 years out
• Advanced Radar Threat System (ARTS) - 3 versions
• Low Cost Threat Emitters
• Live Mission Operations Center (LMOC) - 3 versions
• Live Mission Operations Network (LMON)
USERS
• Primary:
• ACC Units
• AETC Units
• AFGSC Units
• Secondary Users:
• Air National Guard/Air Force Reserve
• Sister Services (USA,USN,USMC)
• Other DoD Agencies
• Other Federal Agencies
• Foreign Military
Ranges and Bases
ACC Locations Host Base Avon Park Range, FL Moody AFB (23 WG) Grand Bay Range, GA Moody AFB (23 WG) Dare County Bombing & Gunnery Range, NC Seymour-Johnson AFB (4 FW) Poinsett Electronic Warfare Ranges, SC Shaw AFB (20 FW)
- Bulldog MOA, GA (Ft. Gordon) Mountain Home Ranges, ID Mountain Home AFB (366 FW)
- Saylor Creek Bombing & Gunnery Range, ID
- Juniper Butte Bombing & Gunnery Range, ID
- No Drop Target Complexes, ID (ND-1/ND-4/ND-5/ND-7/ND-9)
AETC Locations Host Base Holloman B&G Ranges, NM Holloman AFB (49 WG)
- Oscura Range, NM
- Red Rio Range, NM
- Centennial Range, NM
AFGSC Locations Host Base Belle Fourche Electronic Warfare Site, WY Ellsworth AFB (28 BW) Snyder Electronic Warfare Site, TX Dyess AFB (7 BW)
Different funding sources with one unified set of requirements
Dare County Range, NC
Poinsett EWR, SC
Belle Fourche EWS, SDMountain Home Ranges, ID
Grand Bay Range, GA
Avon Park, FL
Holloman Ranges, NM
EWR (1)
B&G RANGE (5)
TOTAL: 9
Snyder EWS, TX
PTR CONTRACT LOCATIONS
Bulldog MOA, GA
Hours of Operations
1 Does not include startup, shutdown, and maintenance action times.
2 Maintenance may be performed during hours of operation on a non-interference basis.
3 Dare County EW operations are to be incorporated into B&G operations.
4 The number of operational hours per week are to be used during five consecutive work days. Federal holidays that occur Monday – Thursday are to be considered as one of the five consecutive days. The numbers of hours contributed to a Monday – Thursday holiday are to be equal to the number of hours of the longest workday per week. The number of hours contributed to a Friday holiday should be consistent with historical Friday operating hours. Weekend hours will only be used to support Operational Requirements coordinated through the ACC Program Manager.
5 SOW Para 1.3 – “During the hours of operation, the range will be fully manned with qualified personnel to support operations whether or not sorties are scheduled.”
Hours of Operation (IAW Flying Schedule) Notes 1,2,3,4,5PRIMARY TRAINING RANGE
80 per week and 4 Large Force Exercises (see para 3.1.11) Avon Park 60 per weekBelle Fourche EWS 66 per week Dare County 30 per week MTE operations 77 per week Grand Bay B&G 100 per week Range Operations CenterHolloman B&G 69 per week Range Control Officer Operations 60 per week at Saylor Creek Mt Home B&G Ranges 30 per week at Juniper Butte 63 per week Poinsett B&G 63 per week Poinsett EC 60 per weekSnyder EWS
Additional Hours of Operations
1. Per SOW Para 1.4, request hours will include routine startup and shutdown procedures but shall not include time for maintenance (emergency or routine).
Additional Hours of Operation (IAW Flying Schedule) Notes 1 PRIMARY TRAINING RANGE
100 Full Crew per yearAvon Park 150 RCO Only per year 150 per yearBelle Fourche EWS 100 per year B&G operations Dare County 100 per year MTE operations 200 per year Grand Bay B&G 100 per year Range Operations Center
Holloman B&G 50 per year Full Crew (no RCO) 100 per year Full Crew with RCO 200 per yearMt Home B&G Ranges 200 per yearPoinsett B&G 200 per yearPoinsett EC 200 per yearSnyder EWS
• General Information
• General Tasks – B&G, EWS, and EWR
• Specific Tasks - B&G
• Specific Tasks – Electronic Warfare (EW)
• Government Furnished Property and Services
• Publications and Forms
• Definitions and Acronyms
• Airfield Operations
• Technical Exhibits
• Technical Exhibit 1A – Services Summary Bombing & Gunnery Ranges
• Technical Exhibit 1B – Services Summary All EWR/EWS
• Technical Exhibit 2 – Workload Estimates
• Technical Exhibit 3 – Maps (located in operating location’s Addendum to AFMAN13-212V1)
• Technical Exhibit 4 – Government Furnished Vehicles/Heavy/Agricultural Equipment
• Technical Exhibit 5 – Government Furnished Property and Equipment
Major Areas of the SOW
• C-1 General Information (list of deliverables in Table 1-4)
• Program Management (1.7)
• Key Contractor Personnel (1.9)
• Security (1.10)
• Safety (1.13)
• Government Property Administration and Control (1.14)
• Invoices (1.22)
• C-2 General Tasks – B&G, EWS, and EWR
• Real Property (Grounds) Maintenance (2.1)
• Real Property (Facility) Maintenance and Repair (2.2)
• Real Property (Roads) Maintenance and Repair (2.3)
• Water Systems (2.5)
• Smokey Sam and Pyrotechnical Threat Devices (2.7)
• Maintenance of Vehicles and Heavy/Agricultural Equipment (2.8)
• Administration (2.10)
• C-3 Specific Tasks – B&G
• Operations (3.1)
• Range Communications (3.1.3)
• Scoring Systems Operation (3.1.4)
• Range Control Officer (3.1.5)
• Portable Threat Operations (3.1.9)
• Pop-up and Moving Targets (3.1.10)
• Maintenance (3.2)
• Target Maintenance And Construction (3.2.1)
• JAWSS Scoring System Maintenance (3.2.2)
• Scheduling (3.3)
• Logistics (3.4)
• Contractor Provided Fire Services (3.6)
• C-4 Specific Tasks – EW
• Operations (4.1)
• Maintenance (4.2)
• Maintenance Control (4.2.1)
• Maintenance Effort (4.2.2)
• Configuration Control (4.2.5)
• Programmed Depot Maintenance (4.2.6)
• Logistics (4.3)
• Materiel Contract Management (4.3.2)
• Quality Control (4.4)
• Security (COMPUSEC & COMSEC) (4.5)
• C-5 Government-Furnished Property and Services
• Government-Furnished Facilities (5.1)
• Government-Furnished Equipment (5.2)
• Government-Furnished Materials (5.3)
• Government-Furnished Utilities (5.5)
• Communications Services (5.6)
• Fire Protection/Fire Suppression (5.8)
• C-6 Applicable Pubs and Forms
• Technical Exhibits
• Technical Exhibit 1A – Services Summary Bombing & Gunnery Ranges
• Technical Exhibit 1B – Services Summary All EWR/EWS
• Technical Exhibit 2 – Workload Estimates
• Technical Exhibit 3 – Maps
• Technical Exhibit 4 – Government Furnished Vehicles/Heavy/Agricultural Equip
• Technical Exhibit 5 – Government Furnished Property and Equipment
• Vehicles/Heavy Equipment
• Due to changes in the FAR Government provided items are being phased out
• Govt has provided an estimated end life for current equipment in Tech Exhibit 4
• Contractor required to provide vehicles/heavy equipment needed for range maintenance and operations, if government equipment reaches end of life the contractor will still be responsible for meeting SOW requirements
• Mountain Home and Holloman Ranges need significant amounts of vehicles/heavy equipment to meet SOW requirements
• Vehicles previously provided for remote site threat emitter maintenance have been removed from contract due to age and reliability
• Contractor equipment plan in Technical Proposal is key
• Maintenance
• Government had provided a data base for Equipment Status reporting that is obsolete.
Contractor will provide data via required Management Information System
• Communications Tower Maintenance – Language is under final review for placement in RFP SOW, will include certified tower climbing
• Range Personnel
• SOW Para 1.3 – “During the hours of operation, the range will be fully manned with qualified personnel to support operations whether or not sorties are scheduled.”
Special Interest Items
This Briefing is:
UNCLASSIFIED
Headquarters Air Combat Command
Acquisition Strategy / Solicitation Overview
Sandra Redfearn Contract Specialist
ACC AMIC/PKBA
Capt Ryan Tagatac Contracting Officer
ACC AMIC/PKBA
Projected Milestones
DateMilestones *6 May 2025Draft Solicitation Issued 17 Apr 2025Pre-Conference / Site Visits
22 & 23 Apr 2025Mountain Home Range Site Visit
**13 May 2025Poinsett Range (Shaw AFB, SC) Site Visit
16 Jun 2025Final Solicitation Issued 31 Jul 2025Proposals Due
12 Jan 2026Contract Award 2 Feb 2026 Transition 1 Apr 2026Performance Start
*Looking at issuing Draft solicitation sooner **Will post announcement/sign up soon ***Foot stomp – Milestone dates are projected; some may be moved sooner
• Solicitation Number: FA489025R0006
• Was “FA489023R0075”
• Cross reference provided on SAM.gov
• Anticipated Contract Type:
• Single Award Firm Fixed Price (FFP) with Cost Reimbursable
(CR) Line Items
• Draft Contract Line Item Number (CLIN) Structure:
• Transition (FFP)
• Program Management (FFP)
• Operations at each Location (FFP)
• Travel / Supplies / Government Directed Overtime (CR)
• Collective Bargaining Agreements at all locations except Mt Home
• Government Furnished Property/Equipment
• FAR Part 45
• DFARS Part 211 - Item Unique Identification (IUID) Registry
Key Contractual Aspects
Commerciality/Small Business Considerations
• Anticipate Non-commercial Acquisition
• Anticipate Requirement Set Aside 100% for Small Business
• Sources Sought posted to 15 May 2024
• Industry Day announced on 6 Nov 2024 and held on 9 Dec 2024
• Anticipated NAICS Code:
• 561210 – Facility Support Services
• SBA Size Standard - $47M
Evaluation Methodology
• Best Value Tradeoff IAW DoD Source Selection Procedures dated Aug 2022 and DAFFARS 5315.3
• Secret Facility Clearance required at proposal submission
• Technical Factor is more important than Price Factor
• Evaluating 2 Factors:
• Factor 1 - Technical - Rated at Subfactor level using a methodology of
Acceptable/Unacceptable Ratings for Subfactors A and B, and combined technical/risk rating methodology for Subfactor C
• Subfactor A: Transition
• Subfactor B: Technical Experience
• Subfactor C: Program Management with 3 Aspects
• Aspect I: Manning
• Aspect II: Quality Control
• Aspect III: Contractor Equipment
• Factor 2 – Price: Reasonable, Balanced, Affordable
• Facility Security Clearance
• Facility clearance required for the PTR contract performance is Secret
• Offerors must possess a facility security clearance at the level of Secret at time of initial proposal submission
• Ensure teaming partners or subcontractors also have appropriate clearances at time of proposal submission
Technical/Risk Subfactor Ratings
DescriptionRating Color Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths and/or at least one significant strength, and risk of unsuccessful performance is low.
OutstandingBlue
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.
GoodPurple
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
AcceptableGreen
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.MarginalYellow
Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.
UnacceptableRed
Table 3. Combined Technical/Risk Rating Method per paragraph 3.1.2.2 DOD Source Selection Procedures dated 20 Aug 2022
Technical/Risk Subfactor Ratings
Table 2B. Technical Risk Rating per paragraph 3.1.2.2 DOD Source Selection Procedures dated 20 Aug 2022
DescriptionAdjectival Rating Proposal may contain weakness/weaknesses which have low potential to cause disruption of schedule, increased cost, or degradation of performance. Normal contractor emphasis and normal Government monitoring will likely be able to overcome any difficulties.
Low
Proposal contains a significant weakness or combination of weaknesses which may have a moderate potential to cause disruption of schedule, increased cost, or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome any difficulties.
Moderate
Proposal contains a significant weakness or combination of weaknesses which is likely to have high potential to cause significant disruption of schedule, increased cost, or degradation of performance. Special contractor emphasis and close Government monitoring will unlikely be able to overcome any difficulties.
High
Proposal contains a deficiency or a combination of significant weaknesses that causes an unacceptable level of risk of unsuccessful performance.
Unacceptable
Factor 1 – Technical Subfactor A: Transition
• Provide an effective and executable strategy for transitioning resources and personnel during Phase-In with a logical timeline and realistic milestones (from contract award through performance start date) and the offeror’s proposal thoroughly substantiates all of the following:
• Demonstrates effective phases-in resources required to assume mission responsibilities at contract start
• Demonstrates effective phases-in of trained, qualified personnel required to assume mission responsibilities at contract start
• Identifies actions to prevent interruption of services
Subfactor B: Technical Experience
• Provide evidence of technical experience performing similar scope of work for a minimum of 12 months within the last 8 years. Evidence shall include:
• Summary of Technical Experience
• Describe roles of offerors and all subcontractors, teaming partners, and/or joint venture partners in relation to technical experience information
• Summary shall include the contract number/task order number, contracting organization, and government point(s) of contact for the contract
• Contract references corroborating recent and similar technical scope experience
• Maximum of 3 references for prime offeror
• Technical experience from a teaming partner, mentor/protégé, subcontractor, or where the offeror performed as a major subcontractor is acceptable
Subfactor C: Program Management
• Aspect I: Manning - Provide successful program management execution and demonstrate complete technical understanding of the requirement
• Demonstrate proposed manning levels, skill mix, and labor categories are technically sufficient to successfully meet the SOW
• Demonstrate proposed key personnel and approach to maintain certifications and credentials are adequate to successfully execute the program
Subfactor C: Program Management (cont.)
• Aspect II: Quality Control - Proposed integrated quality approach provides for effective planning, operation, and control of processes and thoroughly substantiates all the following:
• Demonstrates top management commitment/involvement with continuous process improvement of the quality program
• Demonstrates preventive-based monitoring, measurement and analysis, and metrics to ensure conformance to the SOW and the offerors’ Quality program, correction and prevention of recurring discrepancies, and continuous improvement of processes/performance
• Demonstrates procedures for testing and accepting the threat and scoring systems assigned to a range, and approach for inspecting the threat and scoring systems, as well as mission scoring and reporting are adequate to meet SOW requirements
Subfactor C: Program Management (cont.)
• Aspect III: Contractor Equipment - Proposed approach provides an understanding of performance locations, operating environment and thoroughly substantiates all of the following:
• Demonstrates proposed contractor-owned heavy equipment/vehicles are technically sufficient to successfully meet SOW requirements
• Demonstrates an understanding that current GFE has a limited lifespan and addresses processes for replacement as contractor furnished equipment
• Current GFP equipment is not all inclusive to perform SOW requirements
Factor 2 - Price Evaluation
• Price evaluated on total overall price of total consisting of total proposed extended prices for all FP and CR CLINS for transition, base period, optional contract periods to include a six-month extension of services IAW FAR 52.217-8 using FAR 15.404-1 price analysis techniques
• Conduct Price Analysis for reasonableness
• Comparison of proposed prices received in response to the solicitation
• Normally established thru Adequate Price Competition (APC):
• Two or more responsible offerors, competing independently, submit priced offers that satisfy government’s expressed requirement
• There is no finding that the price of the otherwise successful offeror is unreasonable
• Determine if prices are balanced
• IAW FAR 15.404-1(g)(1) unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more CLINs is significantly over or understated as indicated by the application of cost or price analysis techniques
• Assessment of Affordability
• This analysis in no way limits the Government’s right to award to a higher priced offer, if that offer is determined affordable and represents the best value, based upon tradeoffs including benefits associated with any additional costs
Evaluation Process AWOD / Competitive Range
• The SSA will decide, based on Initial Evaluation Activities (per the CO’s recommendation), to either:
• Award Without Discussions (AWOD), OR
• Establish Competitive Range (CR) and enter into Discussions
• AWOD is the desired approach (submit best proposal with original submission)
• CO will notify offerors if:
• AWOD
• Entering Discussions
• Eliminated from CR
• Offeror can request pre- or post-award debriefing
Evaluation Process Discussions & Final Proposal Revisions
• Conducting Discussions
• Release ratings
• Release Evaluation Notices (EN)
• Receive and evaluate offeror(s) responses to ENs
• May require multiple rounds of ENs
• CO makes determination when to close Discussions
• CO may recommend further reduction of CR
• CO will notify offerors when:
• Closing Discussions
• Requesting Final Proposal Revisions (FPR)
• Eliminated from CR
• Offeror can request pre-/post-award debriefing
Security Clearance
• DD Form 254 will be included as part of Technical proposal
• Facility clearance required for the PTR contract performance is Secret
• Offerors must possess a facility security clearance at the level of Secret at time of initial proposal submission
• Ensure teaming partners or subcontractors also have appropriate clearances at time of proposal submission
Bidders Library
• Bidders Library Access
• All required material located in Bidders Library located at
Snyder EWS, TX
• Regulations, manuals, drawings, Technical Orders, or other publications referenced in the solicitation will not be issued with the solicitation
• All documents referenced in the SOW are available online or in the Bidder’s Library
• Details regarding access to Bidders Library (e.g. gaining base access) will be published on SAM.gov
• Final Note:
• Ensure proposals are based on Final RFP documents –
“Draft” documents do not reflect the final requirement
Communications with the Government
• All questions or comments regarding this acquisition must be submitted in writing to:
accamic.ptr.recompeteorgbox@us.af.mil
• All items briefed today and discussed at the Site Visits are preliminary and are subject to final acquisition strategy approval
• Questions/recommendations from Industry are encouraged
• Verbal dialog between government and industry, both during today’s open forum & at the site visits, is unofficial
Points of Contact
• ACC AMIC/PKCB
• Contracting Officer: Capt Ryan Tagatac
• E-mail: ryan_mark.tagatac.3@us.af.mil
• Contract Specialist: Ms. Sandra Redfearn
• E-mail: sandra.redfearn@us.af.mil ort(7) 764-0657
• Internet Links
• https://sam.gov/ (Reference No. FA489025R0006)
• https://www.acquisition.gov/ (Federal Acquisition Regulation)
Mountain Home Range Complex
Mr. Curtis Viall 366 OSS Range Ops
Mountain Home Range Complex
Juniper Butte Range
BE
BJ
AE
AD
AF
AGND-7
BC
AJ
ACAH
AABB
AIBA
BK
ABND-1
Saylor Creek Range
BF
AK
AL
Bruneau
Hammett
Glenns Ferry Bliss
Hot Springs
Grand View
C. J. Strike Reservoir Site
AQAU
Grasmere EC
ND-9
ND-4
AV
BG
AMBI
ND-5
AP
AN
AO
Grasmere
AT
Mountain Home Air Force Base
Mountain Home
Rattlesnake Radar Station
Blue Butte
RED – Electronic Combat (EC) Sites (34) BLUE – Air-to-Ground Training Ranges (2) Green – No Drop Sites (5)
S1
S2 S3
• Air-to-Ground Bombing Range
– 25 mi SE of MHAFB
• 12,840 acres Exclusive Use Area
• 97,000 acres Joint Use Land
• Approx 1,200 targets (Airfield, Tanks, Bldgs, SAM/AAA, MOUT)
• Five Urban Village Targets
– Over 1,500 Containers
• Remote Control Vehicles
• Heated and lighted targets
• Inert ordnance only
• Weapon scoring systems
• Laser operations and scoring
– Laser Spot Video Recording System
• Electronic threat systems
– 266 Range Squadron
Saylor Creek Range
Saylor Creek Range
Weapons Employment and Ordnance
Guns / Strafe (7.62 – 40mm) GBU-10/12/31/38/54/56 (Inert Only) 2.75” Rockets (Willy Pete Authorized) AC-130 105mm Ground-to-Ground Ordnance Small Arms (5.56, 7.62, .50 Cal) Artillery, Mortars, HIMARS
Chaff / Flare Weapons release up to 28,000’ AGL and 6 miles range
SOF Training CAS Training in Urban Environment High Value Target Seizure Operations Tough GBU Weapons Employment Targets
Multiple Urban Villages
Remote Control Vehicles
• Over 30 miles RCV Roads
• Air-to-Ground Range
• 45 miles SE of MHAFB
• 12,112 acres Exclusive
Use
• 88 Targets
• Industrial Complex, SAMs
• Inert ordnance only
• Weapons scoring system
• Heated targets
• Laser operations/scoring
• Cattle grazing 6 wks/yr
Juniper Butte Range
Juniper Butte Range
No Drop Sites (5 ND Sites)
ND-7
ND-1
ND-9 (near Grasmere)
ND-5
ND-4
No Drop 1
Over 700 Containers
File details come from the government source that posted it. Updated .