This document is an Excel sheet containing questions and responses from offerors regarding a Request for Proposal (RFP) for Gulfstream G550 Training for EA-37B Pilots. The RFP is issued by the Department of the Air Force Air Combat Command.
Key details:
- The RFP solicits proposals for initial and recurrent pilot training on the EA-37B aircraft, including academic instruction, simulator training, and courseware development.
- The Performance Work Statement (PWS) outlines requirements for Crew Resource Management/Threat and Error Management training to be incorporated into the pilot training courses.
- The RFP allows for up to 25 pages in the Technical Volume, which must include 5 required plans (Training Workload Management Plan, Instructional Systems Development Management Plan, Quality Control Plan, Phase-In/Phase-Out Plan, and Instructor Training and Certification Plan).
- Past performance requirements include submitting up to 3 contract references performed as a prime contractor, with the option to submit subcontractor past performance if the offeror lacks prime experience.
- The solicitation uses NAICS code 611512 with a $34 million size standard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA489024R0021 Amendment 0005.pdf | ||
| FA489024R0021 EA-37B Training Combo Revision 2.pdf | ||
| FA489024R0021 Amendment 0004.pdf | ||
| Atch 1 - PWS EA-37B Training_20240417.pdf | ||
| FA489024R0021 EA-37B Training Combo Revision 1.pdf | ||
| FA489024R0021 Amendment 0003.pdf | ||
| Atch 2 - Pricing Schedule V3 5 Apr 24.xlsx | XLSX spreadsheet | |
| Atch 4 - QASP EA37-B Training_2024_04_01.pdf | ||
| FA489024R0021 Amendment 0002.pdf | ||
| Atch 1 - PWS EA-37B Training_20240401.pdf | ||
| FA489024R0021 Amendment 0001.pdf | ||
| Atch 2 - Pricing Schedule V2.xlsx | XLSX spreadsheet | |
| Atch 1 - PWS EA-37B Training_20240318.pdf | ||
| A1. PWS EA-37B Training_20240313.pdf | ||
| FA489024R0021 EA-37B Training Combo Final.pdf | ||
| A2. Pricing Schedule.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FA489024R0021 EA-37B Pilot Training | |||||||
| Offeror | Government Only | ||||||
| Q# | Doc | Pg # | Para # | Comment/Question/Recommendation | Government Response | Disposition | Comments |
| 1 | PWS | 7 | 1.4.3 | Is it acceptable by the government that CRM / TEM gets incorporated as part of all pilot initial and recurrent training courses without having a stand -alone course or is it the government’s intention on having a stand -alone course for this training outside of the normal initial and recurrent training? | Yes. The Government has removed the stand-alone requirement for 1.4.3. Crew Resource Management/Threat and Error Management (CRM/TEM). This requirement has been incorporated and identified under 1.4.1.1. Initial Pilot Training and 1.4.1.2. Refresher Pilot Training. | Reviewed/Completed. | Please see PWS dated 18 March 24. |
| 5 | RFP | 8 | Table 1 | Factor 1 - Technical allows 25 pages. PWS A4.1 requires five plans with the proposal. (TWMP, ISDMP, QCP, Phase-In/Out, and ITCP). Are the plans included in the 25 page count? | Revise PWS | We do not have problem with submitting the ISDMP, QCP and Phase In/Out during award. | |
| 6 | PWS, RFP | 36 | Table A1.8 | 252.228-7001 Ground and Flight Risk is not included in the list of required clauses despite having flight event requirements. Will the Government include this clause or is the contractor held liable for any incident? | This is not a solicitation or contract for the acquisition, development, production, modification, maintenance, repair, flight, or overhaul of aircraft | IS THIS SIM OR LIVE FLIGHT |
(ii) That are awarded under FAR Part 12 procedures and are for the acquisition, development, production, modification, maintenance, repair, flight, or overhaul of aircraft; or otherwise involving the furnishing of aircraft;
| 7 | Combined Synopsis/ Solicitation | 1 | 3 | States size standard for NAICS 611512 is $27.5M. Recommendation: New SBA Table of Small Business Size Standards, effective 19 Dec 2022, shows new size standard for NAICS 611512 as $34M. | Revised | DONE | |
| 8 | Combined Synopsis/ Solicitation | 12 | 6.0 (2) | Paragraph requires offeror to submit Past Performance Information (PPI) sheet for each referenced contract. In the paragraph title, the PPI sheet is shown to be at Appendix 2. However, Appendix 2 contains the Past Performance Questionnaire (PPQ). Question: Should offerors use the PPQ Section 1 to identify each referenced contract, or should the offeror just provide a summary with the information listed in Paragraph 6.0 (1)? | Revised | ||
| 9 | Combined Synopsis/ Solicitation | 12 | 6.0 (2) (a) | States, "Recency is defined as active contract performance (minimum of 6 months) during the last three years preceding the date of issuance of this solicitation." Solicitations for other combat aircraft training contracts have used five years preceding issuance of solicitation. Examples: F-15/F-16/F-22 CAT/CWD (FA489021R0027 issued 11 Apr 2022); B-52/B-1 CAT/CWD (FA680022R0006 issued 30 Aug 2022); and PACAF Simulator Instructor Pilots (FA521523R0002 draft issued 19 Dec 2022). Question: Would the Government consider changing the recency criteria to five (5) years preceding issuance of this solicitation? | No | ||
| 10 | Combined Synopsis/ Solicitation | 23 | Eval Factors, 2.4, Table 4, First Row | States "Very Relavant" derives from "Performance for having managed at least one USAF contract for Fighter type | |||
| military aircrew training..." Question: Would the Government consider adding "Intellignece, Surveilance and Reconnaissance (ISR), or Remotely Piloted Aircraft (RPA)" to "Fighter type"? | Ask PM |
17 Combined Synopsis/ Solicitation 21 Eval Factors, 1.1, next-to-last sentence States,"If the offeror through their analysis determines that the manning requirements for I/SMEs is greater or less than the minimum number recommended in the PWS, offeror must provide justification for their proposed FTE requirements." PWS contains no FTE information. Question: Should FTE information be included in the PWS? Revised Evaluation Factors Para 1.1 PWS is based off workload estimates
| 20 | Combined Synopsis/ Solicitation | 10 | 5.2 | Recommend including a statement in Section 4.5, subparagraph "Pages Not Included in Page Count.", which states "Technical Contents including: Facility Clearance, Table of Contents, Glossary of Abbreviations and Acronyms, Executive Summary, and Deliverables listed in Appendix 4 (A.4.1.1.2., A.4.1.1.3, A.4.1.1.4, A.4.1.1.5) are NOT included in the Technical Volume page limitations." | |
| Reason: 25 pages is insufficient to address the requirements of Volume 1 - Factor 1- Technical and also include all five (5) plans required to be submitted with the proposal, as listed in Appendix 4 Deliverables, paragraph A4.1.1. | See revised PWS | ||||
| 21 | Combined Synopsis/ Solicitation | 8-9 | 4.5b, 4.6* | If it is the government's intent for the Technical Volume to exceed 25 pages total (including attachments), we recommend revising the table to state "Technical Volume Page Limit: 30 Pages Total (1 Page Facility Clearance, 4 Page Executive Summary, 25 Page Technical). Deliverables listed in PWS Appendix 4, A4.1.1. should be submitted as separate attachments. " | |
| Reason: Clarify the Instructions to Offerors. | See revised PWS | ||||
| 22 | Combined Synopsis/ Solicitation | 8 | 4.6, Table 1 | Recommend specifying if the five (5) plans (Deliverables listed in Appendix 4, A.4.1.1.) should be submitted as seperate attachments. Please also identify the desired document format and any submission instructions. | |
| Reason: Clarify the Instructions to Offerors. | See revised PWS | ||||
| 23 | Combined Synopsis/ Solicitation | 8 | 4.6 | Recommend Volume I Technical max page limit be raised (from 25 pages) to 100 pages. |
REASONS.
(a). A similar very recent USAF RFP FA6800-22-R-0006 for B-1/B-52 CAT/CWD at two USAF bases, allowed the Technical Volume a max page limit of 100 pages (which included the page counts of the required plans submitted with the proposal either: as separate documents; or, within the Technical Volume).
(b). In order to document in the RQ-4 U-2/T-38 Technical Volume for each of the two bases: Appendix A Workload CAT and CWD detailed analysis (multiple pages to include the PWS Appendix I nine tables but with additional columns of analysis plus paragraph text; and, contractor provided unclassified and classified network servers and switches network diagrams (multiple pages to include the 4 network diagrams).
Reference:
| Solicitation "Table 1 - Page Limitations", identifies for Volume 1 Factor 1 - Technical a max page limit of 25 pages. | Page limit remains at 25. See revised PWS | ||||
| 24 | Combined Synopsis/ Solicitation | 12 | 6.0(2) | Will the government consider increasing the number of past performance references to five (5) Contract References (including Prime Offeror and Subcontractors)? |
Reason: Because references are required for all teammates performing 20% or more of the effort, we recommend allowing additional past performance references to be evaluated. This would enable a more accurate assessment of the Offering Team's combined capabilities. Otherwise, an Offeror with more than one teammate is prevented from supplying more than one example of Very Relevant Work.
| Reference: PWS 6.0(2): "The offeror shall submit a maximum of three (3) contract references where it performed as a prime contractor... Contract references are required on the offeror and any teaming partner or major subcontractor that will perform at least 20% of this effort." | No | Recommend keep it at 3 | |||
| 25 | Combined Synopsis/ Solicitation | 12 | 6.0(2) | Will the government accept past performance from a teaming partner which was performed as a subcontractor (so long as it is recent, relevant, and a PPQ from the Prime Contractor is provided)? |
REFERENCE:PWS 6.01(2)."If the Offeror does not have any past performance where it performed as a prime contractor, the Government will accept past performance from a teaming partner, subcontractor, or where the offeror performed as a major subcontractor if the portion of the work completed was similar in size/scope to this requirement."
| Reason: Recommend the government accept subcontractor performance from subcontractors.This would enable a more accurate assessment of the Offering Team's combined capabilities. | Refer Section 6, Para 2 52.212-1 Addendum | ||||
| 26 | Combined Synopsis/ Solicitation | 12 | 6.0(2) | Can Past Performance by an offering team's subcontractor's current personnel (from prior to their working for the sub-contractor) be included in the Past Performance volume? |
REFERENCE."If the Offeror does not have any past performance where it performed as a prime contractor, the Government will accept past performance from a teaming partner, subcontractor, or where the offeror performed as a major subcontractor if the portion of the work completed was similar in size/scope to this requirement."
| REASON: Clarify past performance evaluation criteria. | No | |||||
| 27 | Combined Synopsis/ Solicitation | 12 | 6.0(2) | Will the government evaluate Past Performance performed as a Subcontractor less favorably (i.e. assign a lower confidence rating) than Past Performance References performed as a Prime? REFERENCE."If the Offeror does not have any past performance where it performed as a prime contractor, the Government will accept past performance from a teaming partner, subcontractor, or where the offeror performed as a major subcontractor if the portion of the work completed was similar in size/scope to this requirement." | ||
| REASON: Clarify past performance evaluation criteria. | No | |||||
| 28 | Combined Synopsis/ Solicitation | 23 | 2.4 | How will the government evaluate a Past Performance Reference that is "Very Relevant" in scope, but "Relevant" in magnitude? (i.e. a Past Performance reference with Satisfactoy PPQs which provided less than 25 FTEs in support of USAF fighter type military training at two or more geographically separate locations.) Reference: "2.4 Relevancy, as it pertains to performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming and the PWS/solicitation requirements; and a measure of the likelihood that the offeror’s past performance is an indicator of future performance." REASON: Clarify past performance evaluation criteria. | Refer to Para 2.5 and 2.6 | |
| 29 | Combined Synopsis/ Solicitation | 23 | 2.4, Table 4. | Recommend changing the definition of "Very Relevant" to read as follows: "Performance for having managed at least one United Stastes military aircrew training contract OR one fighter type instruction experience consisting of both academic and simulator instruction, courseware development utilizing an Instructional Systems Development (ISD) model with performance at two (2) or more geographically separated locations. In addition, performance efforts must include Initial Qualification Training, Mission Qualification and Continuation Training support. |
REASON: The "Very Relevant" criteria, as currently written, is unreasonably restrictive and too limiting. It is more important for the supporting contractor to have an understanding of interservice training protocols than it is for the contractor to have USAF-specific fighter type instruction experience. RQ4 training employs similar tactics, but the U-2 is not a fighter type.
| Reference. Page 23, Table 4. Past Performance Relevancy Rating Method. | Ask PM | |||||
| 30 | Combined Synopsis/ Solicitation | 6 | 3.4 | Please provide more information on the requirement for each teammate to provide a "list of past and present recent and relevant references", including how many recent, relevant references are allowed to be listed; where they should be listed; in what format; and what information is required. Reason: We assume this information should be provided as part of the Past Performance volume but where it should be included and in what format is not made clear. Please clairfy if the government would like to see full Summary Information as described on Page 12, Section 1 with a statement demonstrating relevancy, or if the government simply requires a listing of relevant, recent contracts (with title and contract number). Reference: 3.4 Partner Arrangement (If applicable). If a partner arrangement or joint venture is contemplated, provide complete information as to the arrangement, including any recent and relevant past performance information (as required) on previous partner arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past and present recent and relevant references." | See ADDENDUM TO 52.212-1 - INSTRUCTIONS TO OFFERORS – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (Nov 2021) Para 6(2) | |
| 31 | Combined Synopsis/ Solicitation | 12 | 2 | Does the Government have a Past Performance Information (PPI) Template Sheet for the offeror to complete for our Past Performance Narratives/Summary, or is vendor format acceptable? Reason: Appendix 2 contains the Past Performance Questionnaire for Offerors to send to our customers for completion. Appendix 2 is identified as both the PPI and PPQ within the RFQ. Reference: (2) Past and Present Performance Information (PPI) Sheets (Appendix 2)., (3) Past Performance Questionnaires (PPQ) (Appendix 2) | Clarified through revision | |
| 32 | Combined Synopsis/ Solicitation | 6 | 3.4 | Where should the Offeror include Partner Arrangement Information? Reference. "3.4 Partner Arrangement (If applicable). If a partner arrangement or joint venture is |
contemplated, provide complete information as to the arrangement, including any recent and relevant past performance information (as required) on previous partner arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past
| and present recent and relevant references." Reason: To clarify the instructionsto offerors because this requirement is listed separately from the Volume II requirements in Section 6.0, page 12. | Revised | ||||
| 33 | Combined Synopsis/ Solicitation | 6 | 3.4 | Does the List of Recent and Relevant References (Partner Arrangement Information) count against the volume page count limitations? Reference. "3.4 Partner Arrangement (If applicable). If a partner arrangement or joint venture is |
contemplated, provide complete information as to the arrangement, including any recent and relevant past performance information (as required) on previous partner arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past
| and present recent and relevant references." Reason: To clarify the instructions to offerors because this requirement is listed separately from the Volume II requirements in Section 6.0, page 12. | Revised | ||||
| 34 | Combined Synopsis/ Solicitation | 12 | 6.0(1) | Should past performance reference summary/narrative information be included within the "Summary" section of the Past Performance Volume, or should the information requested in 6.0(1) be included within the Past Performance Information Sheets section instead? |
Reason. 2 pages total is not a sufficient page count to include both Offeror information, Award Fee information, and Past Performance Summary information. PPI Sheets (templates) are missing from the RFQ.
Reference 6.0(1) "For each performance reference submitted, the offeror shall include a summary or narrative containing the following information: a. Contract/Task Order Number and Title
b. Contract/Task Order Period of Performance (PoP)
c. Total Contract/Task Order Value
d. Prime Contractor Name, Cage Code and DUNS
e. Subcontractor Name, Cage Code and DUNS:
f. Government Contracting Officer: Name, Title, Agency/Organization, Current Phone Number and Email
g. Government Program Manager: Name, Title, Agency/Organization, Current Phone Number and Email
h. Number of FTEs Managed"
i. Level/Type of Required Security Clearances Required
j. Brief description of the scope of work performed relevant to this requirement and any other information the offeror determines pertinent" Revised to NTE two pages per reference
53 Solicitation 15 7.4. Please supply CBA Seniority List with years of service and Full Time and Part Time status for all personnel. Reason: This information will help Offerors determine PTO leave and fringe benefit eligibility using the Collective Bargaining Agreements (CBA). The information will support development of the Total Overall Evaluated Price. Refernece: Attachment 5. Collective Bargaining Agreements. Seniorty list will be provided during transition period, as necessary. Information not relavant for proposal
68 Combined Synopsis/Solicitation 15 7.4. Please supply CBA Seniority List with years of service and Full Time and Part Time status for all personnel? Reason: This information will help Offerors determine PTO leave and fringe benefit eligibility using the Collective Bargaining Agreements (CBA). The information will support development of the Total Overall Evaluated Price. Refernece: PWS Attachment 5. Collective Bargaining Agreements.; RFQ Page 25 "Factor 3-Price" Seniorty list will be provided during transition period, as necessary.
76 Combined Synopsis/Solicitation 21 1.1 What is the difference between Weakness and Significant Weakness? Reason: They are defined the same in RFP Page 21 Section 1.1. Reference: "A Significant Weakness is defined as a flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. A weakness is defined as a flaw that appreciably increases the risk of unsuccessful contract performance. " Revised
79 CBA 20 18.7 CBA: The CBAs reference a "2019 Rehabilitation Plan" under the IAM Pension Plan. Specifically it states: "Effective on the Adoption Date, and on each Adoption Date anniversary, the Employer’s contribution rate otherwise obligated under the CBA will increase by a compounding 2.5% while the Rehabilitation Plan remains in effect." Can the Government provide the Rehabilitation Plan and effective dates referenced in the CBA? Ask Christin
81 RQ-4 Combined Synopsis / Solicitation 11-12, 28-33 6.0 Volume II: Factor 2- Past Performace
1) Table 3,
2) Paragraph (2) Past and Present Performance Inforamtion (PPI) Sheets (Appendix 2)
3) Paragraph (3) Past Performance Questionnaires (PPQ) (Appendix 2)
4) Appendix 2 Past Performance Information Sheets (PPI) and Past Performance Questionnaire (PPQ): Can the government clarify the difference between the PPI and PPQ? If a CPARS is being provided for a Past Performance reference, does the Offeror need to provide a PPI as well? Section 6.0 of the Combined Synopsis/Soliciation, Table 3, directs the contents of the Past Performance Volume to Contain PPI Sheets and PPQ/CPARS. Both Paragraph (2) and Paragraph (3) reference Appendix 2 for the format of the PPI and PPQs. Appendix 2 is titled "Past Performance Questionnaire and Cover Letter" and makes no reference to a Past Performance Information Sheet. If a PPI Sheet is required in addition to a CPARS reference, what format does the government want the information presented (beyond the Table 3 guidance that "Each PPI NTE five pages") Clarified
84 PWS and RQ-4 Combined Synopsis / Solicitation PWS pg 5, 11, 13, 41 PWS paragraphs 1.3.2, 1.4.2, 1.4.2.8, 1.6.6, 1.7.2.1 and Appendix 4 Deliverables & Instructions to Offerors: Appendix 4 states in paragrapgh A4.1 that the "Contractor shall produce and deliver the following items relating to this contract" and further states in Paragraph A4.1.1 the following are to be "Delivered with Proposal":
A4.1.1.1 Training Workload Management Plan; PWS Para 1.3.2 A.4.1.1.2 Instructional Systems Development Management Plan; PWS para 1.4.2 A4.1.1.3 Quality Control Plan; PWS para 1.4.2.8 A4.1.1.4 Phase-In/Phase-Out Plan; PWS Para 1.6.6 A4.1.1.5 Instructor Training and Certification Plan; PWS para 1.7.2.1 In the Combined Synopsis/Solication, ITO section there is no mention of the Instructional System Development Management Plan, Quality Control Plan, Phase-In/Phase-Out Plan, and the Instructional Training and Certification Plan.
Questions:
1) Which of these plan(s), if any count against the Volume I; Techincal Volume Page count?
2) Would the government clarify in the ITO which plans are due with the proposal and whether to attach as an appendix or as part of the Volume I Technical proposal?
3) PWS para 1.4.2 states that the Instructional Systems Development Management Plan is due within 10 business days of contract award. Would the government clarify when this plan is due? Revise PWS We do not have problem with submitting the ISDMP, QCP and Phase In/Out during award.
88 RQ-4 Combined Synopsis / Solicitation 23 Evaluation Factors, 2.0 Factor 2 - Past Performance Table 4 Past Performance Relevancy Rating Method: Would the government clarify if a "Fighter type military aircrew training" is required to receive a "Very Relevant" rating? What qualifies as "Fighter type"? Is an RQ-4 or U-2 considered "Fighter type"? Are other Combat Air Force (CAF) aircraft such as MQ-9, B-1B, etc. considered "Fighter type"? Ask PM
| 91 | Solicitation | 1 | 3 | The NAICS code stated is 611512 with a business size standard of $27.5 million. Will the Government update this NAICS code to reflect the new $34 million size standard? | Revised | DONE | |
| 92 | Solicitation | 4 | N/A | Security Plan/Standard Operating Procedure is required for JVs without its own active Top Secret Facility Clearance. Will the Government clarify this requirement does not apply to unpopulated JVs? | A Top Secret facility clearance is not required for the JV itself if the Offeror is an unpopulated Joint Venture and all members of the Joint Venture possess a Top Secret facility security clearance. In the case of unpopulated Joint Ventures, each member of the Joint Venture must possess the required facility clearance and a copy of each member’s active clearance must be provided at time of proposal submission. a Joint Venture without its own active Top Secret Facility Clearance is required to submit, as part of its proposal, a Security Plan/Standard Operating Procedure which at a minimum includes the following: See para a. - e. | ||
| 93 | Solicitation | 7 | 3.4 | Will the Government clarify where the requested information is placed in the proposal? | Look up in Fighter | ||
| 94 | Solicitation | 7 | 3.4 | Will the Government clarify what information is required for "complete information?" | Complete information is included in Para 3.4 | ||
| 95 | Solicitation | 8 | 4.6 | Table 1 shows a 10 page limit for the Price volume. Will the Government confirm this does not include back-up data? | Revised Para 4.5 and 7.3 | ||
| 96 | Solicitation | 12 | 2 | The Government states that the Past and Present Performance Information (PPI) Sheets are provided in Appendix 2. Appendix 2 is titled Past Performance Questionnaire and Cover Letter. Will the Government provide a Past and Present Performance information (PPI) template? | PPQ and Cover Letter are considered PPI. Revised to clarify. Reference Para XXXXXX | ||
| 97 | Solicitation | 14 | 5 | The ITO requires JV members each submit past performance (CPARS) if the JV does not have Past Performance as a Prime. However, 13 CFR § 125.8(e) allows for the use of mentor past performance under the SBA Mentor Protege Program. Will the Government allow all 3 PPI to come from the mentor? | Revised ITO | ||
| 98 | Solicitation | 14 | 5 | If an agency has not provided the JV member with a finalized CPARs, will the Government accept a completed PPQ in lieu of a CPARS? | Refer to Paragraph XXXXX | ||
| 99 | Solicitation | 35 / 36 | Tables | ||||
| A1.1 / A1.3 | There appears to be discrepancy between number of classes for U-2 RQT and U-2 MSN PLNR on Tables A.1.1 (states 3 classes) and A1.3 (states 4 classes). Will the government please clarify the number of classes and required total instructor hours within Tables A1.1 and A1.3? | Table A1.1 provides estimated U-2 Flying workload. Table A1.3 provides estimated U-2 Academics workload. Table A1.6 provides estimated U-2 Training Device workload. |
&"Arial,Bold"SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104
&"Arial,Bold"SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104 Page &P of &N
File details come from the government source that posted it. Updated .