This is a solicitation for an Optimizing Human Weapon System contract requiring occupational therapy, physical therapy, and audiology services to support a prehabilitation program decreasing neck and back pain among fighter aircrew. Services include data collection, analysis, and quarterly reporting to support physical performance evaluation, injury avoidance and recovery. The contract will be awarded as a 100% small business set-aside with a 5-year period of performance from March 2020 through September 2025. Offerors must submit proposals by September 16, 2019 adhering to requirements in the solicitation, including registration with SAM. The contract will be awarded on a firm-fixed-price basis to a single awardee responsible for all locations. Evaluation will utilize a full tradeoff methodology considering all factors in the commercial items evaluation provision. The soliciting agency is the Air Force Air Combat Command.

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Optimizing Human Weapon System (OHWS), newest first.
File Type Posted
Atch_4_-_18R5035_-_PWS.pdf PDF
Combined_Synopsis__Solicitation_Cover_page.pdf PDF
Atch_8_-18R5035_-PPQ_Cover_Letter.pdf PDF
Atch_5_-_18R5035_-_Price_Template.xlsx XLSX spreadsheet
Atch_2_-_52_212-2_Addendum.pdf PDF
Atch_1_-_52_212-1_Addendum.pdf PDF
Atch_10_-_8R5035_-_App_D_SubKtr_Consent_Ltr.doc DOC document
Atch_8_-18R5035_-PPQ_Cover_Letter_(Final_Version).pdf PDF
Atch_10_-_8R5035_-_App_D_SubKtr_Consent_Ltr.doc DOC document
Atch_4_-_18R5035_-_PWS.pdf PDF
Atch_2_-_52_212-2_Addendum.doc DOC document
Atch_1_-_52_212-1_Addendum.doc DOC document
Atch_8_-_18R5035_-_App_B_PPQ_Cover_Letter.pdf PDF
Atch_3_-_CLAUSES.docx DOCX document
Atch_6_-_18R5035_-_App_A_PPI_Template.doc DOC document
Atch_5_-_18R5035_-_Price_Template.xlsx XLSX spreadsheet
Atch_7_-_18R5035_-_App_C_PPQ_Template.doc DOC document
Atch_9_-_18R5035_-_Question_Matrix.xlsx XLSX spreadsheet
Atch_11_-_COI_Statements.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OHWS Matrix

FA4890-18-R-5035 OHWS Question/Comment Matrix
Offerors
Q#DocPg. #Par. #Comment/QuestionCategory (Delete Later)Specific Cat (Delete Later)Response
Please clarify if release is solely a Draft RFP and that a Final RFP is to be released at a TBD date in the futureFBOFinal RFPThe OHWS posting on FBO on 7 August 19 was a draft RFP and no proposal were due. FAR 52.212-1 and FAR 52.212-2 were in draft status only. Any associated proposal due dates from the 7th of August posting are null and void.
The release is solely a Draft RFP and that a Final RFP is to be released at a TBD date in the future. If that is the case, would the government please share, if known, what the estimated date the Final RFP would be releasedFBOFinal RFPThe RFP was released on 16 August 19.
Is the recently published FBO announcement (16 Aug 2019) for Optimizing the Human Weapon System Service another Sources Sought Request or is it Pre-Solicitation notice?FBOFinal RFPThe 16 August 19 posting is the RFP via a Combined Synopsis Solicitation.
I saw that the response date in the General Info section was changed to “Aug 16, 2019 2:10 pm Eastern”, but did not come across any other edits. Was this just a change for administrative reasons? Or was a document or other information intended to be posted? Just wanted to checkFBOThis was an administrative change.
Would you confirm that the sources sought modification preempts the Pre-solicitation?FBOFinal RFPThe posting on 7 August 19 was a presolicitation draft RFP. The Combined Synopsis Solicitation was released on 16 August 19.
52.212-1In Addendum to 52.212-1, Instructions to Offerors – Commercial Items – FA4890-18-R-5035, Section 3. Submission of Proposals we find “Please submit electronic proposals to the AMIC PKA Organizational Proposal box at accamic.caas@us.af.mil. Proposals are due no later than 20 September 2019 at 3:00 p.m. (Local Eastern time). Late proposals will not be accepted. Please advise if this is in fact the actual solicitation?FBOFinal RFPThis information has been updated in an amendment to the solicitation and proposal due dates have been extended until the 27th of September at 10:00 AM Eastern Time
Will the Government consider separating the CONUS and OCONUS requirements into separate solicitations?RequirementAt this time, the Government intends to maintain the locations as a single requirement.
Are the services required under the contemplated Solicitation currently being provided under an existing contract? If so, to what extent are the contemplated services currently being provided?RequirementRe-competeServices required under contemplated Solicitation are not currently being provided under an existing contract.
Is this Solicitation a re-compete of an existing requirement? Please provide the contract/task order number(s) for any existing contracts which are currently providing these services.RequirementRe-competeThis solicitation is not a re-compete of an existing requirement.
52.212-21.6We would suggest removing this subsection altogether because it currently conflicts with SBA regulations. The requirement for SBA approval of JVs applies only in if the RFP is set-aside for 8(a) competition, see 13 C.F.R. § 124.513, and it appears that the Contracting Officer here is going to set this aside for SB. Please note that Joint Ventures formed either under the SBA All Small Mentor/Protégé program or those formed under no mentor/protégé program at all do not require SBA approval (nor will the SBA do it). See 13 C.F.R. §§ 121.103(h) & 125.9. Also, offerors who will be bidding as JVs already are well versed in these rules.Small BusinessLanguage in section has been revised within the FAR Clause 52.212-1
52.212-21.6Additionally, it’s possible that SBA JVs would not be able to perform this requirement because JVs formed as separate entities (i.e. LLCs) generally are required to subcontract to the ventures all requirements for contract personnel under 13 C.F.R. § 121.103(h). Unfortunately, Article 72 of the NATO SOFA Supplemental Agreement does not permit subcontractors providing “Troop Care” services to receive SOFA benefits.Small BusinessLanguage in section has been revised within the FAR Clause 52.212-1
52.212-21.6Please clarify whether proposed subcontractor past performance be evaluated the same as the proposed prime contractors, or whether proposed prime contractor’s past performance be viewed as more relevant because of the relationship it will have with the Government under the resultant contract.Doc Interpretation / Clarification / Add. InfoPPQIn accordance with FAR Clause 52.212-2 section 2.3.1.2 of the solicitation, relevancy is determined through demonstration of the ability to perform the full range of services in accordance with the PWS. The contractors relationship with the government, either as a prime contractor or a subcontractor, will not be considered in the relevancy determination.
In reviewing FBO, as you suggested, I see today’s modification identifies the project as a “sources sought”. This is very exciting, and we’re prepared to direct our resources accordingly but, so I don’t make a mistake, would you confirm that the sources sought modification preempts the Pre-solicitation?FBOFinal RFPThe FBO posting on 7 August 19 was a presolicitation draft RFP, however the actual solicitation was released on 16 August 19 via a Combined Synopsis Solicitation.
Addendum to 52.212-1 Instructions to Offerors - Commercials Items11.4Paragraph states offerors acknowledge awareness of all amendments to the solicitation via an email. Can that accomplished in the email when the offeror transmits its proposal or must it be a separate email?ProceduralFAR Clause 52.212-1 section 1.4 of the solicitation has been revised that all contractors shall acknowledge awareness of all amendments to the solicitation in the proposal submission email to the government.
Addendum to 52.212-1 Instructions to Offerors - Commercials Items23.3It does not say where this contact information is provided. Can it be provided on the first page if Volume 3, Pricing?Doc Interpretation / Clarification / Add. InfoFAR Clause 52.212-1 section 3.3 has been amended to state contact information will be provided on a cover page referenced in Table 1 of section 4.5. The content of the cover page is covered in section 3.3 and the page count is outlined in section 4.5.
Addendum to 52.212-1 Instructions to Offerors - Commercials Items24.3.1Can pages be in landscape if a chart, table or graphic warrant it?ProceduralYes, landscape format is allowed for pages where chart, table, or graphic on page warrants the format
Addendum to 52.212-1 Instructions to Offerors - Commercials Items24.3.2Where is the Organizational Chart provided and where are the instructions for it so offerors know what is required?ProceduralOrg ChartThe organizational chart is optional information included at the offeror's discretion and contains only organizational structural information. Such a document may be attached to the cover letter as outlined in section 3.3. The organization chart requirement language has been adjusted in section 4.3.2 of FAR Clause 52.212-1 of the solicitation
Addendum to 52.212-1 Instructions to Offerors - Commercials Items34.4Can the Government explain what it means by "Each factor shall be contained in its own single searchable file, with copy/paste capability." If documents are provided in pdf, which is what the Government requires, how can copy and paste be available?ProceduralDocuments shall be provided in a Adobe Acrobat 9.0 or later PDF or Microsoft Office 2010 or later format that allows for text to be searchable within the document. Additionally, the PDF should allow for text to be copied from the document, so it can subsequently be pasted to an editable text document. The PDF or Office 2010 document is not required to be editable or paste within the source document.
Addendum to 52.212-1 Instructions to Offerors - Commercials Items34.4Can the Government explain what it means by "Offerors shall insert the file name in the header of each document." Does this refer to each page header?Doc Interpretation / Clarification / Add. InfoAs prescribed in FAR Clause 52.212-1 section 4.4, offerors shall utilize the naming standardized naming convention (e.g. offeror-name-factor-name.doxc) and place that naming convention in the header of each document
Addendum to 52.212-1 Instructions to Offerors - Commercials Items; Attachment 844.8The instructions state "forward it directly to the Contracting Officer (CO) not later than the day proposals are due.", however Attachment 8 PPQ Cover Letter states PPQ are due 8/30/2018. Can the government clarify when PPQ are due?Doc Interpretation / Clarification / Add. InfoPPQAttachment 8 has been updated to reflect the correct date and added onto FBO 27 September 2019.
Addendum to 52.212-1 Instructions to Offerors - Commercials Items44.8.1Does the Government mean to reference here Attachment 8 PPQ Cover Letter versus the Consent Letter?Doc Interpretation / Clarification / Add. InfoPPQFAR Clause 52.212-1 section 4.8.1 of the solicitation has been revised. A qualifying PPQ submission must be submitted with a consent to release past performance information. If the consent form is not submitted, the PPQ will not qualify for consideration.
Addendum to 52.212-1 Instructions to Offerors - Commercials Items45.3Can the Government validate that the glossary of abbreviations and acronyms is only required in Volume I - Technical?ProceduralGlossary of abbreviations and acronym is only required to be placed in Volume I - Technical; however, all abbreviation and acronyms used in any section should be included in glossary
Addendum to 52.212-1 Instructions to Offerors - Commercials Items45.5Is the requirement to provide the actual Plans here with the understanding they will be more fully developed after award (Criteria 1) and then discuss how they will be effective (Criteria 2)?Doc Interpretation / Clarification / Add. InfoWellness PlanYes - offerors should submit a program as described in Para 5.5; if selected for award, the plan (Criteria 1) will be made part of the contract with opportunity for additional refinement in coordination with the Government; offerors are encouraged to submit a plan that, to the best of their abilities, includes the detail necessary to be evaluated by the Government IAW Para 2.2.1 of Addendum to 52.212-2 Evaluation - Commercial Items. Criteria shall be used to discuss how the plan will be effective.
Addendum to 52.212-1 Instructions to Offerors - Commercials Items67.1Can the Government provide these NTE travel amounts to be inserted in Attachment 5 for each CLIN ?ProceduralPricingA NTE amount of $10,000 have been added for travel for each period of performance and $5,000 for the 6 month extension. These amounts shall not be adjusted by offerors.
Addendum to 52.212-1 Instructions to Offerors - Commercials Items67Can the Government verify if a Volume 3 narrative can be submitted in addition to Attachment 5?Doc Interpretation / Clarification / Add. InfoPricingFAR Clause 52.212-1 and 52.212-2 have been revised to allow for offerors to provide an accompanying document to the pricing template which provides substantiating data for other direct costs. The Government will utilize this information in accordance with FAR Clause 52.212-2 section 4.2.1.
Addendum to 52.212-1 Instructions to Offerors - Commercials Items and Attachment 567.3 and Attachment 5For supporting data, is the Government asking for a separate complete build up of each of the 169 positions with direct labor, fringe and indirect costs for each contract period of performance in addition to the information in Attachment 5? Can the government clarify the supporting data requirement and how submitted?
If yes, how is this information going to be provided in Attachment 5 when the spreadsheets do not have anyplace to provide fringe costs, indirect costs or ODC breakout? Do offerors add sheets to the Attachment 5 workbook for each contract period and all positions or do they provide their own spreadsheet with all costs broken out?Doc Interpretation / Clarification / Add. InfoPricingThe pricing template has been revised to add a category for "Direct Labor" where the offeror will provide the unburdened labor cost associated with each FTE. The labor value within the TOEP will still be derived from the burdened rates multiplied by the annual hours.
Atch_3 Clauses6N/ADoes Limitations on Subcontracting apply because it is not checked?Small BusinessFAR Clause 52.219-14, Limitations on Subcontracting has been added.
Atch_3 Clauses9N/AThe provision of 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495) is checked but provision 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67) is not checked. Can the Government clarify this?Doc Interpretation / Clarification / Add. InfoBecause the work is exempt from the service contract act, 52.222-17 was removed and 52.222-43 does not apply.
Atch_3 ClausesN/AN/AAre the positon in CONUS subject to the Service Contract Act or are they exempt?Doc Interpretation / Clarification / Add. InfoThis requirement is exempt from the Service Contract Act.
Atch_3 ClausesN/AN/AWill the Government please provide all the SOFA agreements?Doc Interpretation / Clarification / Add. InfoStatus of Forces Agreements (SOFA) are published in a Department of State annual report titled: "Treaties in Force: A List of Treaties and Other International Agreements of the United States in Force." This document can be accessed via the Department of State website via the following link: https://www.state.gov/treaties-in-force/
Atch_5 Price TemplateFFP Core and FFP Optional Extended Work WeekThere are tabs citing Extended Work Week for Core and Optional FTE, however none of the documents contained reference this extended work week. Can the government please clarify?Doc Interpretation / Clarification / Add. InfoPricingExtended work week is outlined in section 1.2.1.1 "Alternate Performance Schedule" where the contractor may be asked to support 7 day operations.
Atch_5 Price TemplateInstruction TabFFP Summary Tab, Item 8It states to put in the ODC Handling Rate and Fee but on the FFP Summary Tab on Rows 21-22 it states "not required for this acquisition." Can the Government clarify this requirement; do offerors put in these rates or not?Doc Interpretation / Clarification / Add. InfoPricingThe pricing template has been revised and the ODC handling Rates have been removed.
Atch_5 Price TemplateInstruction TabFFP Core or Optional FTE Tabs, Item 5These items (labor category, task number, number of FTE) are already entered in by the Government. Are offerors supposed to change any of this pre-filled data?Doc Interpretation / Clarification / Add. InfoPricingOfferror will not alter the labor category, task #, Unit, Performance Location, or # FTE columns. The offerors shall input their information in the est. hrs., direct labor rate, and fully burdened rate columns
Atch_5 Price TemplateInstruction TabFFP Core or Optional FTE Tabs, Item 5Can the Government explain what it means by "If the same labor category applies to multiple tasks, please enter a separate row for each task?"Doc Interpretation / Clarification / Add. InfoPricingInstruction has been removed as this has already been accomplished by delineating each FTE in its own row
Atch_5 Price TemplateInstruction TabFFP Core or Optional FTE Tabs, Item 6Can the government validate that hours go in columns F, I, L, O, R and U?Doc Interpretation / Clarification / Add. InfoPricingWith the revised template, hours will go in columns F, J, N, R, V, and Z
Atch_5 Price TemplateInstruction TabFFP Core or Optional FTE Tabs, Item 7Can the Government validate that the fully burdened rate goes into columns G, J, M, P, S and V?Doc Interpretation / Clarification / Add. InfoPricingWith the revised template, fully burdened hours go in columns H, L, P, T, X, and AB
Atch_5 Price TemplateInstruction TabFFP Core or Optional FTE Tabs, Item 8Can the Government validate that calculated rates for pre-filled formulas are in columns H, K, N, Q, T and W?Doc Interpretation / Clarification / Add. InfoPricingWith the revised template, the calculated rates for prefilled formulas are in columns I, M, Q, U, Y, and AC
Atch_5 Price TemplateN/AN/ACan the Government provide clarity on what the material line is used for?Doc Interpretation / Clarification / Add. InfoPricingThe material line on the price template may be used for any proposed material costs the offeror expects to use in performance of the contract. It is not necessary to propose any material costs for this effort; however, if costs are proposed, the use of materials should be addressed in cost substantiation as well as the technical volume.
Atch_6 PPI TemplateN/AN/AThe PPI are currently in TNR 10 Point. Is it acceptable to submit all content for the PPI in 10 Point, including table information, description of contract, etc.?Doc Interpretation / Clarification / Add. InfoAll proposal information must conform with the instructions in FAR Clause 52.212-1 section 4.3. The template has been revised to confirm with this information as well.
Atch_6 PPI Template1CIt states to "Describe the nature and portion (percentage) of the work to be performed on the TACP-GA POTFF effort…" Can the Government states what the TACP-GA POTFF effort is?Doc Interpretation / Clarification / Add. InfoCorrectionTemplate has been revised to remove this language
Atch_11 COI StatementsN/AN/AAre offerors and their teammates supposed to complete the OCI Statement? If yes, in which Volume is it submitted?Doc Interpretation / Clarification / Add. InfoAttachment 11 have been removed from the solictation and is no longer required to be filled out or submitted by the offerors
PWS31.2.1The PWS sates that performance may be required on recognized US holidays? Does this apply to OCONUS work as well? Will international holidays be recognized?Doc Interpretation / Clarification / Add. InfoOCONUSContractor personnel can expect to not recognize Host Nation holidays but will recognize US holidays for OCONUS locations.
PWS31.2.1Will the contract employees be required to work more than 40 hours/week at any given time?Doc Interpretation / Clarification / Add. InfoNo the government will not require employees to work more than 40 hours a week.
PWS31.2.1This is a non-personal services contract. Would the gov’t consider changing this to personal services?Doc Interpretation / Clarification / Add. InfoThe Government does not intend to change this service to a personal service.
PWS31.2.1State licenses and certifications will be from the state in which services are provided. What about OCONUS performance locations, is a licenses from any state acceptable?Doc Interpretation / Clarification / Add. InfoOCONUSYes, at OCONUS locations licensure from any state or US territory will be acceptable.
PWS6, 75.2.2.1 and 5.2.2.2For ATs, will the Government allow substitution of Bachelor's degree with greater years of experience, i.e. BS and 5 years or MS and 2 years?Doc Interpretation / Clarification / Add. InfoPWSAt this time the Government does not contemplate allowing substitutions for the KSA associated with the labor outlined within the PWS. If an offeror believes the requirements are overly restrictive and the market cannot support the requirements, the offeror may make it known in their proposal for Government consideration.
PWS85.3.2.1 and 5.3.2.2For CSCS, will the Government allow substitution of Bachelor's degree with greater years of experience, i.e. BS and 5 years or MS and 2 years?Doc Interpretation / Clarification / Add. InfoPWSAt this time the Government does not contemplate allowing substitutions for the KSA associated with the labor outlined within the PWS. If an offeror believes the requirements are overly restrictive and the market cannot support the requirements, the offeror may make it known in their proposal for Government consideration.
PWS85.3.2.3Can the Government explain why only SOF experience is preferred? Are there any other preferred experiences?Doc Interpretation / Clarification / Add. InfoPWSSOF experience is likely to provide a higher level of quality with regard to the experience as the work relates to the work of this contract. Other work experience would be viewed favorably such as collegiate or professional sports experience. Offerors may substantiate in their proposal submissions why their past performance experience is desirable for this requirement.
PWS105.4.2.1MT will maintain a license or certification from the state in which the service is to be provided? –What about OCONUS locations? Can the license be from any US state?Doc Interpretation / Clarification / Add. InfoPWSYes, at OCONUS locations licensure from any state or US territory will be acceptable.
PWS126.18It states Contractor shall develop and maintain continuity folders IAW task requirements defined in this PWS (Section 4.0). There is nothing in PWS 4.0. Can the Government clarify and describe the continuity folder elements and requirements?Doc Interpretation / Clarification / Add. InfoPWSInformation for the contents of the continuity folders is now correctly refenced in section 4. An example of such information would be a profile of the individual being served and contain information such as strength or range of motion.
PWS1811.1It states The transition period will be 30 calendar days for Project Lead (reference 4.0 of this PWS) and one assistant? Are these Government or contractor personnel? If contractor personnel, can the Government state why it specified these 2 people to work on transition? Are they working on a Government site during transition?Doc Interpretation / Clarification / Add. InfoPWSThe transitional period is designed to allow sufficient time for the awardee to begin the in processing steps for personnel required for the PWS. The individuals in question are contractor personnel and the PWS language has been adjusted accordingly. These individuals are not required to work on a particular site, however if offerors request access to a specific site, the Government will make accommodations for those individuals if practicable. Offeros shall make these requests know in their proposal.
PWS1812.1Performance Schedule is not correct, has base period starting 1 AUG 19. Can the Government please update?Doc Interpretation / Clarification / Add. InfoPWS language has been revised to reflect the period of performance.
PWS1912.4It states Contractor employee while on duty, wear in plain view on the upper portion of his outer garment a metal or plastic identification badge to be furnished by the Contractor, containing the company name, employee name, and the section where the employee works. The section may not be known or it may change after assignment, can the Government remove the section requirement and only require the company name and employee name? Or can section be replaced with a standard work-related designation, such as their labor category?Doc Interpretation / Clarification / Add. InfoYes, it is acceptable for the contractor employee not to have the work section on the name card.
52.212-155.5Criteria 1: states, "...in accordance with PWS paragraph 4.1 and its following subparagraphs …" Can you confirm that you meant to reference PWS 5.1?Doc Interpretation / Clarification / Add. InfoThe PWS has been revised and the correct reference is PWS 4.1.
FBO Page/52.212-123.1Please validate that proposals are due at 3:00 PM (Eastern Time)ProceduralConfirmed Proposals are due 10 A.M Eastern Standard Time on the 27th of September 2019
Attachment 813Please update the date to the due date for solicitations on this requirement.ProceduralConfirmed Proposals are due 10 A.M Eastern Standard Time on the 27th of September 2019
Attachment 31Recommend removal of 52.215-10, 52.215-11, 52.215-12, and 52.215-13 as Attachment 1 Paragraph 7.3 explicitly states that "certified cost or pricing data is not required".Doc Interpretation / Clarification / Add. InfoClause Removed
Attachment 32Recommend removal of 52.230-2, 52.230-3, 52.230-6, and 252.215-7002 as this is FFP.Doc Interpretation / Clarification / Add. InfoClause Removed
Attachment 34Recommend removal of 252.219-7003 as this is a small business set aside.Doc Interpretation / Clarification / Add. InfoSBClause Removed
Attachment 166.3.5Will the Government consider accepting completed performance evaluations from CPARS in lieu of PPQs?Doc Interpretation / Clarification / Add. InfoPPQYes the government will accept complete performance evaluations in lieu of PPQs.
Att 1 & 844.8In bold face type, HQ ACC states that "PPQs should be sent (by the offeror) to organizations for which a performance assessment is requested early enough for the respondent to complete the PPQ and forward it directly to the Contracting Officer (CO) not later than the day proposals are due." In Att 8, it states that Our areas of interest in the offeror are summarized in the enclosed questionnaire.
Request your written response no later than 30 August 18, 10:00 a.m. EST. Please clarify what date the PPQs are to be submitted?Doc Interpretation / Clarification / Add. InfoPPQAttachments have been updated with the correct response date of 27 September 2019 by 10 A.M. EST.
Att 1Does similarly situated apply for subcontracting?Doc Interpretation / Clarification / Add. InfoPPQYes. A “Similarly situated entity” means a first-tier subcontractor, including an independent contractor, that has the same small business program status as that which qualified the prime contractor for the award and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. As this requirement is a total small business set-a-side, a first-tier subcontractor would be required to be a qualified small business under the applicable NAICS to be considered as similarly situated.
Att 156.3.2Can a past performance be submitted by a subcontractor who is performing less than 20 percent?Doc Interpretation / Clarification / Add. InfoPPQNo. A subcontractor must perform 20 percent or more of the work if past performance is to be submitted
Att 232.3.1.3To achieve a Very Relevant score for past performance, does the Government consider the offeror to have a past performance for both CONUS and OCONUS?Doc Interpretation / Clarification / Add. InfoPPQIn accordance with FAR Clause 52.212-2 section 2.3.1.2 and 2.3.1.3, Relevancy entails the evaluation of the offereor's ability to perform the full range of services in accordance with the PWS. Performance in both CONUS and OCONUS would fit with the scope and magnitude definition of Very Relevant past performance.
Att 2 - 52.212-211.1.1How will the government determine which offerors are in the competitive range?Doc Interpretation / Clarification / Add. InfoFAR Clause 52.212-2 has been adjusted and illustrates that the competitive range will be established only after each proposal has been evaluated in accordance with the procedures outlined in FAR Clause 52.212-2 of the proposal. The competitive range will be comprised of the most highly rated proposals and the Government reserves the right to limit the number of offerors within the competitive range further for efficiency sake.
Att 156.3.2Will the government evaluate and weigh subcontractor past performance in the same manner as prime past performance?Doc Interpretation / Clarification / Add. InfoIn accordance with FAR Clause 52.212-2 section 2.3.1.2 of the solicitation, relevancy is determined through demonstration of the ability to perform the full range of services in accordance with the PWS. The contractors relationship with the government, either as a prime contractor or a subcontractor, will not be considered in the relevancy determination.
PWS31.2.1"State licenses and certification for each Contractor must be from the state in which the services are provided."
How about OCONUS, would any state license cover this labor category?Doc Interpretation / Clarification / Add. InfoAt OCONUS locations, licensure from any state or US territory will be acceptable.
PWS43"The Contractor’s requirement is to implement Tasks 5.2, 5.3, and 5.4 as defined in this document, including providing collection and analysis of data and enhancing reduction…" Does the government have any specific database for the ATCs to upload collected data and do further analysis?Doc Interpretation / Clarification / Add. InfoNot at this time. The Government will define the data to be collected and the Government will work with the contractor to define the report format. The contractor must be willing to work with the Government to provide the information in a useful format acceptable to the Government. The contractor's recommendations for data format and collection would be considered when determining the optimal format for reporting.
PWS55.1"The Contractor shall collect, analyze, resolve, disseminate, and archive information". Does the Government have a database system in place where the collected data can be analyze?Doc Interpretation / Clarification / Add. InfoNot at this time. The Government will define the data to be collected and the Government will work with the contractor to define the report format. The contractor must be willing to work with the Government to provide the information in a useful format acceptable to the Government. The contractor's recommendations for data format and collection would be considered when determining the optimal format for reporting.
PWS1510.1.1"10.1.1 Security support provided by the Air Force to the Contractor to include storage containers for classified information/material, use of base destruction facilities, classified reproduction facilities" Does this contract require a DD254 for employees to handle classified information?Doc Interpretation / Clarification / Add. InfoThis contract does not required a DD254 and section 10.1.1 of the PWS has been removed.
PWS1510.1.2"Security support requiring joint Air Force and Contractor coordination includes packaging classified information, mailing and receiving classified materials, implementing emergency procedures for protection of classified information, security checks, and internal security controls for protection of classified material and high value pilferable property" Is Secret Clearance a requirement for this contract so the contractor's employees can handle classified information?Doc Interpretation / Clarification / Add. InfoA Secret Clearance is not required to perform the work on this effort and section 10.1.2 of the PWS has been removed.
PWS1510.2Does paragraph 10.2 contradict 10.1.1 and 10.1.2Doc Interpretation / Clarification / Add. InfoParagraph 10.2 no longer contradicts 10.1.1 and 10.1.2 of the PWS
PWS191.1Is there a specific CLIN for the transition IN plan?Doc Interpretation / Clarification / Add. InfoA Transition In CLIN has been added
PWS2215.2"15.2 Moving Expenses. Moving expenses related to Contractor personnel are the responsibility of the Contractor and shall not be billed to the Government." OCONUS moving expenses can be considerable. This includes Visa fees, relocation costs, school for dependents, etc. Will the government cover these expenses?Doc Interpretation / Clarification / Add. InfoOfferors may provide placement expenses as part of their initial proposal; any such expenses shall be delineated in the ODCs of the proposal. During performance of the contract however, the Government will not pay for such expenses for filling vacated positions.
PWS2215.3"Position vacancies shall not exceed 14 calendar days unless approved in writing or otherwise directed in advance by the CO. Optional FTEs, shall not exceed 30 calendar days unless approved in writing or otherwise directed in advance by the CO".
OCONUS contractors requiring SOFA will need to be approved and this requirements take at least a 30 day timeline which is out of the contractors hands and lies with local governments. Some contractors may need a longer timeline to be approved by some local governments. Would the government consider an exemption from both the 14 day and 30 day requirement for OCONUS contractors?Doc Interpretation / Clarification / Add. InfoVacancy fill rates have been adjusted (See PWS Sections 10 and 14.3). All CONUS Core positions are required to be filled 30 calendar days from the award of the contract (IE performance start date), and OCONUS positions are required to be filled 60 calendar days from award (30 days after performance start date). CONUS vacancy shall be filled within 14 calendar days and OCONUS vacancies shall be filled within 60 Calendar days. Offerors may provide a qualifying statement within their proposal annotating an exemption from these requirements, which the government will evaluate and assign a risk allocation to in accordance with the technical evaluation found in FAR Clause 52.212-2 of the solicitation. If no qualifying statement is proposed, the expectation of the government will be that the contractor adheres to the timeline within the PWS.
Price TemplateWill the government be updating the price template to show the correct POP dates?Doc Interpretation / Clarification / Add. InfoPricing Template updated with correct Period of Performance Dates
PWS105.4.2.1"The MT will maintain a license or certification from the state in which the service is to be provided." How about OCONUS, would any state license cover this labor category?Doc Interpretation / Clarification / Add. InfoYes, at OCONUS locations licenses from any state or US territory will be acceptable.
PWS1811.1.1"Contractor personnel must be in place NLT 30 calendar days after the Project Lead begins transition services." Will the Government consider providing an exemption on the 30 day requirement for OCONUS locations?Doc Interpretation / Clarification / Add. InfoOCONUS Contractor personnel must be in place no later than 60 days after contract award and OCONUS vacancies must be in filled within 60 calendar days.
OverallWill the government reimburse Phase-In costs?Doc Interpretation / Clarification / Add. InfoNo the Government will not reimburse Phase-In Costs.
Price TemplateWill the Government be providing a CLIN list for pricing purposesDoc Interpretation / Clarification / Add. InfoThe Government May provide a CLIN structure for reference but the CLIN structure, but offeror will provide pricing information in conformance with the solicitation and with the associated pricing template.
PWS4 and 55.1Is each location is equipped with basic fitness facility/gym/workout room? Are there additional total body standard conditioning programs running at the same time as the Neck and Back Pain program where our program will integrate with existing? Is the neck and back program the only program the airmen are required to attend?Doc Interpretation / Clarification / Add. InfoYes, each fighter squadron will have access to a basic fitness workout room. No, there is no other concurrent required fitness program apart from the standard AF fitness assessment. Each location will typically have standard fitness equipment available for use. This equipment would be a full array of free weights and weight benches, rubberized flooring, stretch bands, treadmills, bikes, as well as ice packs and hot packs. Equipment the contractor deems necessary for specific evaluations and data collection or exercises for neck and back will necessarily be provided by the contractor.
PWS55.1.3Will our ATCs be functioning within the medical team of the military with acute injury assessment and triage responsibilities? Is the “Unit Commander” we are reporting to a medical person or a non-medical officer?Doc Interpretation / Clarification / Add. InfoThis is a non-medical program and does not include the provision of medical care. As it currently is envisioned this program will not assess or treat injury but will provide preventive efforts for neck and back pain.
CTI
Price TemplatePrice Template Period of Performance (POP) is different than the POP on FBO as well as the POP in the PWS. Please clarify the correct POP.Doc Interpretation / Clarification / Add. InfoPricingThe POP on the Pricing template has been corrected and aligns with the PWS and associated solicitation documentation.
Atch_123.1FBO indicates proposals are due at 10 EDT on 16 Sept. Atch_1 indicates 1500 EDT. Please clarify.Doc Interpretation / Clarification / Add. InfoProceduralProposals are due 27 September at 10:00 AM Eastern Time. Applicable documents have been adjusted accordingly.
Atch_254.2.2The Government has provided pre-established NTE amounts for the Optional Fixed Price Travel CLINS. This optional CLIN price is not included in the pricing sheet. Please clarify.Doc Interpretation / Clarification / Add. InfoPricingpre-established Travel CLIN amounts have been added in the amount of $10,000 for the base and four optional years and in the amount of $5,000 for the six month extension.
Atch_81The letter appears to be from a different RFP. Please clarify.Doc Interpretation / Clarification / Add. InfoAttachment 8 has been updated to reflect the correct information and added onto FBO 27 Aug 19.
PWS31.2.2The number and type of FTEs for each location, as well as their required performance start dates, are referenced in Attachment B of this PWS. There are no start dates in Attachment B. Please clarifyDoc Interpretation / Clarification / Add. InfoThe Core FTE's start date is 23 Mar 2020.
PWS1811.1The transition period will be 30 calendar days for Project Lead (reference 4.0 of this PWS). PWS 4.0 shows N/A. Please clarify the Project Lead requirements.Doc Interpretation / Clarification / Add. InfoThe PWS has been revised to align section 4 to this requirement.
FBO.govN/AN/AThere are seemingly identical fbo.gov postings of this opportunity posted on 16 Aug and today on 22 Aug. Will the Government please verify the documents posted on 22 Aug are identical to those posted on the 16th? If not, will you please provide what changed?FBOFinal RFPThe FBO posting on the 22 Aug 18 only provided an updated Attachment 8, PPQ Cover Letter.
Atch_5FFP Summary TabN/ARow 6 is picking up the sample line item from the FFP Core FTE tab. Confirm the Government wants offerors to delete the sample line item.Doc Interpretation / Clarification / Add. InfoPricingROW 6 on the FFP CORE FTE tab of the pricing template is utilized as a template on how the row should be filled out. The offeror should delete this row before final submission. If any offeror fails to delete this row upon submission, the government will remove the row prior to evaluation.
Atch_5N/AN/APlease clarify the information required in the FFP Core Extended Work Week and FFP Optional Extended Work Week tabs as the PWS does not discuss EWW.Doc Interpretation / Clarification / Add. InfoPricingAn extended work week is outlined in section 1.2.1.1 "Alternate Performance Schedule" where contractor operations can be extended from 5 days to 7 day operations due mission need.
Atch_5FFP Summary TabN/AAre ODCs FFP or Cost only?Doc Interpretation / Clarification / Add. InfoPricingAll pricing is on a fixed-price basis.
Atch_5N/AN/AHow does the Government want ODCs priced such as OCONUS housing, moving costs, etc.? Roll up all costs in Row 19 "Other (Specify for Rqmt)? If so may the offerors create multiple lines?Doc Interpretation / Clarification / Add. InfoPricingODC pricing should be delineated in rows 16, 17, 18, 19 and 20 of the pricing template. Any ODC which does not fit within a specific category (IE material) should be place in the "other" category. Offerors are encouraged to provide substantiating information for any ODC category in their attachment to the pricing template as outlined in FAR Clause 52.212-1 section 7.3 and FAR Clause 52.212-2 section 4.2.1 of the solicitation.
Atch_167.3Supporting data shall be submitted vai the pricing template (Solicitation Attachment 5) and must address the information requested in this paragraph. Atch_5 does not have a location for the supporting pricing data. Are offerors allowed to create additional tabs in Attachment 5 to provide the required information?Doc Interpretation / Clarification / Add. InfoPricingFAR Clause 52.212-1 and 52.212-2 have been revised to allow for offerors to provide an accompanying document to the pricing template which provides substantiating data for other direct costs. The Government will utilize this information in accordance with FAR Clause 52.212-2 section 4.2.1.
Atch_51.2.1.11.2.1.1"The Government will give 2 weeks advance notice to the contractor when the Government will require 7 day operation and for how long those operations will be required." Attachment 5 Extended Work Tabs require the contractor to estimate the number of hours by CLIN. Can the Government provide this information as the PWS does not provide any reference as to when or for how long these requirements will be needed?Doc Interpretation / Clarification / Add. InfoThe Government does not expect more than 20% of the annual work to utilize an extended work week.
52.212-166.3.56.3.5 reads "Offerors shall submit PPQs for each PPI reference where the offeror or teaming partner was as a major subcontractor. The PPQ must be completed by the Prime Contractor referenced on the past performance information sheet." The way this is written indicates that offerors/teaming partners are only required to submit a PPQ if they performed as a subcontractor on a referenced contract. Can the Government confirm that PPQs are only required for contracts where the offeror/teaming partner was a subcontractor? If PPQs are required for contracts under which the offeror/teaming partner performed as part of a joint venture, who should complete the PPQ?Doc Interpretation / Clarification / Add. InfoPPQYes the Government can confirm that PPQs are only required for contracts where the offeror/teaming partner was a subcontractor. Under a joint venture, a PPQ is not required to be submitted.
52.212-155.5Criteria 1 asks offerors to "Develop and provide an overall fitness program for fighter aircrew that addresses training preparation, strength development, and cardiovascular health." Can the Government clarify if they are seeking the final developed fitness plan in response to this section or a description/overview of the program?Doc Interpretation / Clarification / Add. InfoWellness PlanYes - offerors should submit a program as described in Para 5.5; if selected for award, the plan (Criteria 1) will be made part of the contract with opportunity for additional refinement in coordination with the Government; offerors are encouraged to submit a plan that, to the best of their abilities, includes the detail necessary to be evaluated by the Government IAW Para 2.2.1 of Addendum to 52.212-2 Evaluation - Commercial Items. Criteria shall be used to discuss how the plan will be effective.
52.212-167.3Can the government please clarify what supporting compensation documents the offeror is supposed to be submitting? Are offerors just to fill out Attachment 5 or should offerors create their own data package to submit to let you know how we developed our costs and what is in our costs?Doc Interpretation / Clarification / Add. InfoPricingOfferors are requested to fill out Attachment 5 IAW with attachment instructions. In addition, offerors may provide substantiation of rates and other costs used in Attachment 5 via an additional document.
Attachment 5N/AN/ACan the Government please provide the expected extended hours for the positions?Doc Interpretation / Clarification / Add. InfoExtended HoursThe Government does not expect more than 20% of the annual work to utilize an extended work week.
Was reviewing the solicitation for a client and looking through the attachments. I was wondering if any questions were received during the comments period and if so if an amendment will be issued with those questions and answers? Next I was wondering if this is going to be awarded to one company who then has to hire subcontractors for the different locations?FBO / ProceduralThe questions will be posted on FBO as an amendment to the Solicitation. In relation to the award information, this contract will have one awardee. The nature of the prime and subcontracting relationship with the various locations will be up to the awardee. It however must be in compliance with applicable FAR subcontracting limitations.
In the RFP that eventually comes will there be a set proposal response format provided? Based on the presolicitation info It's a bit unclear which sections should be included so all bidders are judged similarlyFBO / ProceduralPricingProposal response formatting is illustrated in FAR Clause 52.212-1 and the evaluation criteria is illustrated in FAR Clause 52.212-2 of the solicitation.
"Contracted personnel will accommodate a ratio of about one OHWS professional per 30 aircrew (1:30 ratio) with the positioning of contract staff as directed in this document and as per the OHWS Program Manager."At 168 FTE's using this ratio that calculates to roughly 5,040 Airmen to be supported - can you verify this number? If this isn't accurate can you provide the correct # of Airmen planned to be supported through this initiative?ProceduralThe number of aircrew members needing support from this effort will be between 1200 and 1500 airman.
"Data Collection and Analyses Report. The Contractor will evaluate, test, identify physical performance and provide feedback for physical performance improvement, injury avoidance, and injury recovery. Data collection and analyses will be conducted on an ongoing basis with quarterly reporting as requested. Data collection will include aircrew satisfaction survey information, information obtained from medical personnel, and other information as directed by the OHWS PM." Is there an expected requirement for any system to where this colled data is to be stored?ProceduralNot at this time. The Government will define the data to be collected and the Government will work with the contractor to define the report format. The contractor must be willing to work with the Government to provide the information in a useful format acceptable to the Government. The contractor's recommendations for data format and collection would be considered when determining the optimal format for reporting.
The Contractor shall produce a written report to include: musculoskeletal pain, duration of pain, origin of pain, types of pain, pain that may require surgery, and trends of musculoskeletal pain over periods of time." Can this report be delivered electronically in lieu of a written report?Doc Interpretation / Clarification / Add. InfoYes, reporting will be electronically transmitted. The Government's intention when stating a written report is through a digital document generated from a word processing software rather than an oral presentation or other means of communications.

&"Arial,Bold"SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

&"Arial,Bold"SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104 Page &P of &N

File details come from the government source that posted it. Updated .