FA4890-10-R-0009

ATTACHMENT 6 - TECHNICAL TASK ORDER REQUIREMENTS

Revised – Amendment 0004

ATTACHMENT 6

TECHNICAL TASK ORDER REQUIREMENTS

1.0 INTRODUCTION/BACKGROUND: ACC AMIC requires RPA organizational-level (O-level) support to include communication reachback support at CONUS, OCONUS, and forward deployed locations as identified below.

2.0 TASK ORDER OBJECTIVE: Provide O-level maintenance and communications reachback capability to CONUS military units tasked for local and OCONUS missions, and OCONUS military units tasked to support contingency/wartime operations.

3.0 REFERENCE: RPA Performance Work Statement (PWS), Appendix O (PWS Matrix), and Section B, Attachment Table B -

Pricing Table Worksheets: CONUS Manning, OCONUS Manning, and Reachback Manning.

4.0 TASK ORDER REQUIREMENTS: All Task orders must be priced using data from Section B, Attachment Table B - Pricing

Table, Labor Pricing worksheets, and requirements contained in RPA PWS and Appendix O. Not-to-exceed dollar amounts for

Miscellaneous CLINS are in the pricing tables. Base period of performance timeframe is 12 months; option year period of performance timeframe is 12 months; extension option period of performance timeframe is 6 months. Task Orders listed below will be issued with IDIQ contract award. The contractor shall support the following requirements:

Technical Task Order 1 – Transition.

Period of Performance: Task Order award date + 104 days

Technical Task Order 2 – Combined CONUS SITES (Priced task orders 2A and 2B may be awarded as individual or combined task orders at the discretion of the Government).

Task

Order Location Supported RPA

Average

Sorties per Day

Average

Sortie

Duration

Hours

Per

Month

Ground Control

Station

(GCS)

Ground Data

Terminal

(GDT)

Period

Of

Performance

2A Creech AFB MQ-1/MQ-9 8 12 hours 1584 6 6 Base +

4 Option Years;

Extension Option

2B Whiteman AFB

MQ-1

(GCS support) N/A N/A 6* 0

Base +

4 Option Years;

Extension Option

*GCS support is 24/7

Technical Task Order 3 – Combined DEPLOYED SITES (Priced task orders 3A through 3F may be awarded as individual or combined task orders at the discretion of the Government).

Task

Order Location* Combat Air Patrols (CAPs) Supported RPA

Incentive/Award Fee

(6 Months) Period of Performance

3A

(Stand alone plus 12 collocated)

MQ-1/9 $545,000

Base + 4 Option Years;

Extension Option

3B

(Stand alone plus 10 collocated)

MQ-1/9 $465,000

Base + 4 Option Years;

Extension Option

3C

(Stand alone plus 4 collocated)

MQ-1/9 $225,000

Base + 4 Option Years;

Extension Option

3D

(Stand alone plus 5 collocated)

MQ-1/9 $265,000

Base + 4 Option Years;

Extension Option

3E

(Stand alone plus 4 collocated)

MQ-1/9 $225,000

Base + 4 Option Years;

Extension Option

3F

(Stand alone only)

MQ-1/9 $65,000

Base + 4 Option Years;

Extension Option

*Note: The Government will provide physical locations when the final solicitation is released.

For physical DP locations, after solicitation release, send an email request to: RPARecomp@langley.af.mil

Technical Task Order 4 - REACHBACK LOCATION(S).

Task

Order Location

# Satellite

Dishes

Current & Max

CAPs

Supported

Host Nation

Requirements

Incentive/Award Fee

(6 Months)

Period of

Performance

Ramstein AB, Germany (Site

A)

60-90

Technical Expert

Status Accreditation required

$150,000 Base + 1 Option

Year

5.0 UNIQUE TASK ORDER REQUIREMENTS.

Task Order Description

1 - Transition pricing and execution will be IAW offeror’s proposed transition plan.

2A - Adjustment to Appendix N (Operational Requirements):

- Average sorties per day decreased from 8 to 4; hours per month decreased from 1584 to 960

- Number of aircraft supported decreased from 14 to 8, ground control stations decreased from 6 to 3, and ground data terminals reduced from 6 to 3.

- GCS support required 24 hours per day, 5 days per week.

2B - Adjustment to Appendix N:

- MQ-1 Platform

- GCS decreased from 6 to 5

- TS/SCI clearance required.

3A - Adjustment to Appendix N:

- MQ-1 Platform

- Commercial travel from CONUS to Joint Reception Center (JRC).

- Limited ramp space drives ~30 additional aircraft ground movements per 12-hour shift. Nearly all aircraft movements are manual moves versus longer tows requiring tow vehicle.

- Limited loading/arming locations; aircraft loaded/armed in designated area just prior to launch; unloaded immediately after recovery in designated area.

- Maintenance Holding Area described in PWS Paragraph 3.28.4 does not apply.

- Government provides all munitions storage area and munitions delivery support.

3B - Adjustment to Appendix N:

- MQ-1 Platform

- Commercial travel from CONUS to JRC.

- Limited ramp space drives approximately 10 additional aircraft ground movements per 12-hour shift. Most aircraft movements are short distance manual moves versus longer tows with tow vehicle.

3C - Adjustment to Appendix N:

- MQ-1 Platform

- Commercial travel from CONUS to site.

- Process through local Personnel Support for Contingency Operations (PERSCO) team at deployed site.

- Flying schedule based on combination of standard Air Tasking Order scheduling and alert requirements.

- Extremely crowded/busy ramp.

- Aircraft must be towed (approximately 1 mile) to/from aircraft parking ramp to a single munitions load/arming and launch/recovery location.

- Maintenance Holding Area described in PWS Paragraph 3.28.4 does not apply.

- Government provides all munitions storage area and munitions delivery support.

3D - Adjustment to Appendix N:

- MQ-1 Platform

- Commercial travel from CONUS to JRC.

- Limited ramp space drives approximately 5 additional aircraft ground movements per 12-hour shift.

3E - Adjustment to Appendix N:

- MQ-1 Platform

- Commercial travel from CONUS to JRC.

- Travel to support boresight operations requires approximately 40 minute round trip drive approximately 1-3 times per week.

- Physical layout of flightline requires longer tows as aircraft are moved between hangars/shelters and open ramp area.

- Maintenance Holding Area described in PWS Paragraph 3.28.4 does not apply.

- Contractor authorized to drive off base only to conduct official business. Driver must posess valid international driver’s license. Follow applicable Government and host nation laws and regulations.

- Provide off-base crash recovery support as required within a 75-mile radius of site. Notify the Government Program

Office immediately in the event of an off-base mishap requiring contractor support.

- Government provides all munitions storage area and munitions delivery support.

3F - Adjustment to Appendix N:

- MQ-1 Platform

- Commercial travel from CONUS to site.

- Process through local PERSCO team at deployed site.

- Munitions support described in PWS Paragraph 3.28.2 does not apply.

- Boresight support is required.

- Contractor authorized to drive off base only to conduct official business. Driver must posess valid international driver’s license. Follow applicable Government and host nation laws and regulations.

- Refer to PWS Paragraph 2.22.1 for specific travel and host country entry and work authorization requirements.

4 - Commercial travel from CONUS to site.

- TS Clearance required.

- Sustain Asynchronous Transfer Mode (ATM) networks at contract start. Support migration to Internet Protocol (IP) networks. Support simultaneous operations of ATM and IP networks through post-migration verification period.

Sustain IP networks after verification period.

Other files for this federal contract opportunity

Other files attached to Remotely Piloted Aircraft (RPA), newest first.
File Type Posted
SF30 - Amendment 0006 —
RPA RFP - Amendment 0005 —
Section L Atch 6 Tech TO Rqmts —
SF 30 - Amendment 0005 —
SF 30 - Amendment 0004 —
RPA PWS —
Appendix D-Publications Forms and Websites —
WD 2005-2485 rev 11 - Ellsworth.pdf PDF
Appendix O-PWS Matrix —
RPA RFP - Amendment 0003 —
SF30 - Amendment 0002 —
App D-Publications Forms and Websites —
Notice to Potential Offerors —
Section B Table B-Pricing Tables —
L Atch 6 Tech TO Rqmts —
App G-Incentive and Award Fee Plan —
SF 30 - Amendment 0001 —
Notice to Potential Offerors —
RPA Pre-Proposal Attendance Roster.pdf PDF
L Atch 4 Cross Ref Matrix —
Appendix D-Publications Forms and Websites —
Appendix I-Special Rqmts for Deployment —
Appendix M-Certs Training and Qualifications —
WD 2005-2331 Rev 11 - Creech.Nellis.pdf PDF
WD 2005-2307 Rev 12 - Whiteman.pdf PDF
RPA PWS —
CDRL A002 —
CDRL A003 —
Notice to Potential Offerors - CBA H W Costs —
CDRL A005 —
WD 2005-2485 Rev 10 - Ellsworth.pdf PDF
RPA Government Responses to Industry Questions —
Draft RPA RFP Section B —
RPA Government Responses to Industry Questions —
RPA Creech Site Visit Attendance Roster.pdf PDF
DRAFT - Appendix I - Special Requirements for Deployment Support.pdf PDF
DRAFT - Appendix C - AFI 21-101_201_200 Compliance Matrix.xls XLS spreadsheet
DRAFT - CDRL A001 - Property Plan-RPA.pdf PDF
DRAFT - CDRL A005 - Safety and Health Plan-RPA.pdf PDF
DRAFT - Appendix K -C4ISR Demarcation Points.pdf PDF
RPA Site Visit Registration Update 12 July 2011.docx DOCX document
DRAFT - RPA Section B.pdf PDF
RPA Site Visit Announcement.docx DOCX document
RPA Draft PWS Q A —
DRAFT - Appendix K - C4ISR Demarcation Points —
DRAFT - Appendix N - Operational Requirements —
DRAFT - Appendix F - Quality Management Systems —
Potential offerors.docx DOCX document
DRAFT - Appendix A - Definitions Abbreviations Acronyms —
DRAFT - Appendix H - RPA Service Summary —
Show all 50

Remotely Piloted Aircraft (RPA) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .